6 min readRead articleAn MEP design consultancy designs the mechanical, electrical and plumbing services that run through a building. Separate discipline teams must produce coordinated drawings on a shared timetable, and one late team holds up the whole issue.

Make this work for your business. Share your team size, priorities and what you need help with. We’ll use your brief to prepare for the first conversation.
Share your requirementsAn MEP consultancy designs air conditioning and ventilation, electrical supply and lighting, plumbing, drainage and fire services for architects, developers and owners. Each discipline has its own engineers and drafters, yet their drawings must fit in the same ceiling, shaft and plant room. Work flows from load calculations and equipment selection to layouts, coordination with the architect and structural team, tender drawings and later site queries. Deadlines come from the building programme, and the architect's changes cascade through all three disciplines. Some firms carry a mix of permanent staff, drafters on short projects and visiting specialists. The wider professional services hub covers what firms of this kind share.
These are the places the people side of this kind of business tends to give way. The rest of this page works through them.
Why GullyHR for MEP design consultants
For MEP consultancy owners whose mechanical, electrical and plumbing teams must issue coordinated drawings together. GullyHR plans workload by discipline, names the coordination role and records what architect changes cost.
A simple plan of hours needed against engineers and drafters available for each discipline, so a late team is seen weeks before an issue date and not on the evening before it.
A coordination lead with a written remit, a model review routine and a clash log, so clashes between ducts, cables and pipes are found early and have an owner.
A change record that notes each architect revision and the hours it cost every discipline, giving the director evidence for a fee conversation and the teams a fair picture of why dates moved.
A small bench of trusted drafters and modellers, with a handover note at the end of each project, so knowledge of a job does not leave with a short-term hire.
Start with any one of these. Scope and fee are agreed in writing after a free first conversation.
The review begins with the next three drawing issue dates and the hours each discipline says it needs for them. We then count the clashes found at the last model review and who fixed them. Discipline heads are asked what share of last quarter went on architect changes, and we check whether any record exists. We look at which drafters left in the last year and what was lost at handover. Junior engineers are asked which other discipline they would like to understand, which shows interest in growing. Tender work is checked for pulling people from design.
What you receive
An example, not a client storyPicture a project where the architect moves a shaft late in the programme. Mechanical redraws ducts, electrical moves a riser and plumbing reroutes a stack, yet nobody logs the hours. The audit would show how much of the quarter went on changes the client never paid for, and who carried it.
How the hr audit works →We begin with the model review: who attends, what is checked, how clashes are logged and who closes them. Next we write the architect change record, a one-page form that captures the revision, the disciplines affected and the hours spent. The drawing issue sign-off follows, with a named checker for each discipline before anything leaves the office. Then comes the drafter handover note, covering what was drawn, what is open and where files sit. Tender work gets its own routine, so estimators do not draw on design hours without telling anyone.
What you receive
An example, not a client storySay a drafter on a short project leaves the week before an issue date. The files sit in several folders and nobody knows which layout is current. A handover note with file locations and open items would have let a colleague pick up the work on the next morning, instead of redrawing from scratch.
How the hr process design works →Each week begins with the workload plan, updated against the issue dates and the real hours booked. Discipline heads and the coordination lead meet briefly to review clashes, open queries and architect changes that arrived in the week. We keep the change record up to date, with hours, and prepare a short note for the project director. Drafter bench availability is checked against the next wave of projects, and we keep contact with trusted freelancers. Monthly, we meet each discipline head about development, rotation across disciplines and who is ready for a coordination role.
What you receive
An example, not a client storySuppose tender season arrives while three drawing issues fall within the same fortnight. Engineers are pulled to estimates and the electrical team falls behind. At the weekly review we would see it, move a drafter across, defer a tender to a later date and tell the director plainly what was traded and why.
How the hr management works →For design engineers we set a short exercise on a ceiling void or a plant room with competing services, marked on method, assumptions and communication. Modellers and drafters are tested on a small drawing and a clash they must explain. Coordination leads are asked how they would run a review meeting with three discipline heads and an impatient architect. We also ask each candidate about the software they use today, because skills date quickly. We run first conversations and hand scoring notes to the directors, who decide on the offer.
What you receive
An example, not a client storyTake a consultancy that needs a coordination lead before a large project starts. Two senior engineers apply, one strong on design and one on people. A review meeting scenario scored on the same sheet shows which of them can hold three discipline heads to the same date, and the directors can say why they chose.
How the recruitment for permanent roles works →We design short cross-discipline sessions where a mechanical engineer explains ductwork routes to electrical and plumbing colleagues, and the reverse, so each side sees what a clash costs. Coordination leads are coached on running a model review, writing a clear clash entry and chasing without friction. Discipline heads learn to give an honest hours estimate and to say when a deadline cannot hold. Drafters and modellers receive refreshers on the firm's modelling standards and on writing handover notes. Junior engineers get a short rotation plan with another discipline.
What you receive
An example, not a client storyPicture an electrical engineer who has never seen how ducts are routed in the same ceiling. His cable trays keep clashing with ductwork and nobody tells him why. A short session with a mechanical colleague, using a real ceiling layout, would show him what to leave clear, and he would plan trays around ducts from the start.
How the manager and team training works →We write a drawing issue and checking rule, an architect change record rule, a project time booking rule and a short code for visiting specialists and short-term drafters. A handbook gathers them with leave and overtime, and your own adviser confirms the registration, liability and design responsibility points. In an HR system we hold each person's discipline, software skills, project history and hours, so workload planning draws on real data and not on guesses made the week before an issue. Directors see all projects, and discipline heads see their own team.
What you receive
An example, not a client storySuppose a client disputes the fee for a late redesign and the director has only memory to rely on. With a time booking rule and a change record showing each revision and hours, the director can open the conversation with dates and totals instead of a feeling, and the client sees a record kept at the time.
How the policies, handbook and hr software works →We would list the next issue dates, ask each discipline head for the hours needed, and set them against the engineers and drafters available, month by month. The plan is reviewed weekly with the coordination lead. A late discipline becomes visible early. Moves of people across disciplines are agreed with the heads and the directors, so the effect on each team is clear before the change.
We would set up a one-page change record that notes each revision, the disciplines affected and the hours spent, filled in by the engineer at the time. After a quarter the directors have evidence for a fee conversation with the architect or client. Whether any extra fee is due depends on your contract, which your own adviser confirms.
We would write a handover note covering drawn work, open items and file locations, and make it a condition of closing a project. We would also keep a small bench of trusted drafters and modellers you can recall for the next wave. Terms for short-term drafters are checked by your own adviser. The note is short so people actually fill it in.
We would plan small rotations in which a junior engineer spends time on the model review or shadows another discipline, and ask each engineer which discipline they would like to understand better. This does not mean abandoning specialisms. It builds engineers who see clashes earlier. Any change to roles or pay is your decision, and your adviser confirms contract wording.
GullyHR runs talent acquisition for permanent roles in MEP design consultants. For each role we agree the job description with you, find and screen candidates against it, and support the offer through to joining. Tell us the role and the number of people, and we start there.
We recruit permanent employees. We do not supply contract or temporary staff.
Each team has its own workload, yet the drawing issue waits for the slowest, and the discipline that finishes early is asked to help without credit.
A duct and a cable tray meeting in the same ceiling void are found at the model review, and the fix lands on whoever has least time.
A new layout means fresh load calculations, new routes and new drawings, and extra hours are rarely recorded or billed.
Short peaks bring in drafters and modellers who leave when the wave passes, taking drawing habits and project knowledge with them.
A young engineer may know one discipline well and nothing of the others, which limits coordination and future leads.
Modelling and calculation tools change, and staff who are not helped to keep up lose confidence or go elsewhere.
When the firm prices and bids at the same time as delivering, the same engineers are stretched across both.
Start with the topics that matter most here: HR Strategy and Workforce Planning; Learning and Development; Compensation, Payroll and Benefits. Then work through the rest. Each topic is written for professional services, not in general.
How many people, in which roles, by when, and what they will cost.
Training planned from need rather than from the calendar.
Salary structure, payroll inputs and a month that closes on time.
Structure, reporting lines and who is allowed to decide what.
Requisition to joining, the same way every time.
A first day that is the same for the fifth joiner as the first.
Records, attendance, leave and the day-to-day HR that must simply work.
Goals, reviews and ratings that hold up in a conversation.
Named backups for the roles that cannot be vacant.
Communication, recognition and the conditions people actually work in.
Two routes, one for complaints, one for conduct, kept separate.
Policies a manager can apply, and obligations with owners and dates.
Induction, records, incident reporting and follow-through.
Who leaves, when, why, and which of them mattered.
Resignation to relieving letter, in a defined order.
Records that survive people, and approvals that do not queue.
A short monthly pack management actually reads.
An HR function that runs the same way every month.
The pieces a MEP design consultants business puts in place, in an order that makes each easier. Open any card for the detail.
A single view of each team's load against issue dates, so help moves between disciplines before a date is missed.
A single view of each team's load against issue dates, so help moves between disciplines before a date is missed. See workforce planning.
A coordination lead for each project, with time set aside in the plan and authority to ask other teams for changes.
A coordination lead for each project, with time set aside in the plan and authority to ask other teams for changes.
A short log of each change, the disciplines it touched and the hours spent, ready for fee discussions.
A short log of each change, the disciplines it touched and the hours spent, ready for fee discussions.
Drafters on short assignments fill a one-page handover on drawing standards and open items before they leave.
Drafters on short assignments fill a one-page handover on drawing standards and open items before they leave.
A week shadowing another discipline or a joint site visit, so engineers know what their neighbours need.
A week shadowing another discipline or a joint site visit, so engineers know what their neighbours need. The learning and development process can carry it.
Named people for bids, or fixed hours in each week, so tender seasons do not eat delivery time.
Named people for bids, or fixed hours in each week, so tender seasons do not eat delivery time.
Confirm with a qualified professional. What applies to you depends on your business, your state and your arrangements, and it changes. This page describes practice. It does not state a legal position.
A forward view of each discipline's load, so hiring and borrowing of staff are planned and not rushed.
Cross-discipline exposure and software training that keep engineers current.
Drafter assignments, handover notes and role letters in plain, consistent form.
Pay for each discipline compared with consultancies that compete for the same engineers.
Start with a free conversation, or see the paid HR Diagnostic.
Understand the business, its workforce, current processes and HR challenges.
Find the missing, weak, inconsistent or person-dependent processes.
Create the structure, processes, policies, SOPs, dashboards and systems needed.
Help HR and department managers actually adopt the new system.
Digitise repetitive and approval-based workflows where it is worth doing.
Track hiring, attendance, employee cost, performance, training and attrition.
Strengthen the people-management system continuously, not once.
From the GullyHR blog: one on HR in professional services, and one on each of the topics this page points to.

Why associates and managers leave consulting, accounting, legal and advisory firms, and how to ask about progression, workload and partners at exit.
6 min readRead article
How a D2C founder can decide which digital marketing work to hire for, which to buy from an agency, and which to split, with a worksheet and a five step plan.
6 min readRead article
A founder's guide to hiring freshers and running a first-year programme: campus or open drives, a screening round, a training plan by quarter, mentors and checkpoints.
6 min readRead article
Simple variable pay structures for product and engineering teams: four options, why individual metrics backfire, a build plan and a one page outline to adapt.
6 min readRead articleMore on the GullyHR blog.
Plan each team's hours against issue dates on one shared view, review it every fortnight and move help early. Waiting until a date is at risk leaves little room to adjust.
A named coordination lead on each project, with time in the plan and the authority to ask other disciplines to change. If coordination is everyone's job, it is done late.
Offer a fair pay, a clear end date or a path to a longer role, and recognise their work. Those you cannot keep should still hand over their knowledge.
Depth in one discipline is needed, but some exposure to the others makes better coordinators and future project leads. Small rotations and joint site visits are enough to start.
Name who bids and who delivers, or set fixed weekly hours for tenders. Otherwise your best engineers are pulled across both and neither gets full attention.
First we would ask each discipline head how load is planned today, count clashes found late and see how architect changes are recorded. A shared workload view with a named coordination lead is a natural first piece, and scope goes into writing for your approval.
All 7 business types in architects & interior design firms · Find another business type
See all HR topics for professional services, or another industry.
Tell us your industry, team size and the issue you want to address. Bring one example of where work gets delayed or ownership is unclear, and the deadline or decision you are working towards.