Why telecom employees leave and how to understand why
Why field engineers, network operations and installation staff leave telecom jobs, and how to ask about on-call, travel, targets and growth at exit.
7 min readRead articleA telecom infrastructure company builds and runs towers, shelters, power systems and passive networks for operators. Rollouts come in waves, teams work at height across many circles, and the business must grow and shrink its field strength with each order.

Not sure what you need? Tell us about your business in six short steps and we will come to the first meeting prepared.
Share your requirementsA telecom infrastructure company puts up and looks after the physical base of mobile and broadband networks: towers, rooftop sites, shelters, power and cooling, and sometimes fibre ducts. The business has two phases. A rollout phase brings civil, tower erection, electrical and installation teams to many sites at once. An operating phase needs a smaller group of site technicians, fuel and power managers and customer-facing account staff. Orders from operators arrive in waves, so field strength swells and shrinks. Staff are spread across circles and districts, and work at height is part of the job. See also HR for telecom.
These are the places the people side of this kind of business tends to give way. The rest of this page works through them.
HR here has to work for each of these groups, not only the office. The set-up below is written with all of them in mind.
An operator releases a large batch, and teams must double in weeks. When the batch ends, there is no work for the extra people.
A project manager, a circle head and a site supervisor each think the other chases materials. Responsibilities blur and delays are blamed on people.
Tower climbing and rooftop work involve falls, weather and fatigue, yet training and kit checks vary by contractor and crew.
People doing the same job in different circles are paid on different terms, and word spreads quickly between sites.
The skills and temperament for building are not the same as for running a site, but both groups follow the same rules.
A cluster head may run dozens of sites in a district, and issues reach the centre only when something has gone wrong.
Different sets of people work side by side with different rules, and accountability is unclear when something fails.
Start with the topics that matter most here: HR Strategy and Workforce Planning; Organisation Design; Health, Safety and Wellbeing. Then work through the rest. Each topic is written for telecom, not in general.
How many people, in which roles, by when — and what they will cost.
Structure, reporting lines and who is allowed to decide what.
Induction, records, incident reporting and follow-through.
Requisition to joining, the same way every time.
A first day that is the same for the fifth joiner as the first.
Records, attendance, leave and the day-to-day HR that must simply work.
Salary structure, payroll inputs and a month that closes on time.
Goals, reviews and ratings that hold up in a conversation.
Training planned from need rather than from the calendar.
Named backups for the roles that cannot be vacant.
Communication, recognition and the conditions people actually work in.
Two routes — one for complaints, one for conduct — kept separate.
Policies a manager can apply, and obligations with owners and dates.
Who leaves, when, why — and which of them mattered.
Resignation to relieving letter, in a defined order.
Records that survive people, and approvals that do not queue.
A short monthly pack management actually reads.
An HR function that runs the same way every month.
The pieces a telecom infrastructure companies business puts in place, in an order that makes each easier. Open any card for the detail.
A forecast of headcount by phase and circle, so hiring and release are planned, not reactive.
What this coversHideA forecast of headcount by phase and circle, so hiring and release are planned, not reactive. The HR strategy and workforce planning work covers it.
One page each for project manager, circle head, site supervisor and technician, naming who owns what.
What this coversHideOne page each for project manager, circle head, site supervisor and technician, naming who owns what. The role design and job descriptions work does this.
Checks before climbing, kit inspection dates, rest rules and a record of who is cleared.
What this coversHideChecks before climbing, kit inspection dates, rest rules and a record of who is cleared. The health and safety work builds it.
A common grade structure with a location element, so the same job has an explainable pay range.
What this coversHideA common grade structure with a location element, so the same job has an explainable pay range. See compensation and rewards strategy.
Different job descriptions, training and rewards for build and run roles, with a route to move between them.
What this coversHideDifferent job descriptions, training and rewards for build and run roles, with a route to move between them.
Headcount, incidents, attendance and open issues in one page, so the centre sees the district early.
What this coversHideHeadcount, incidents, attendance and open issues in one page, so the centre sees the district early.
Before changing anything, find out what is true today. These checks take an afternoon and tell you which of the topics above to start with.
Share your requirementsConfirm with a qualified professional. What applies to you depends on your business, your state and your arrangements, and it changes. This page describes practice. It does not state a legal position.
The services below fit this kind of business best. Each starts by recording where you stand, and every later report compares against that. We do not promise outcomes.
Field strength planned by phase and circle, so hiring and release follow the order book.
Clear roles for project managers, circle heads and supervisors, so responsibility does not blur.
Tower, rooftop and site routines that every crew follows, own staff and contractors alike.
A grade and pay structure that is explainable across circles and between build and run roles.
Start with a free conversation, or see the paid HR Diagnostic.
Understand the business, its workforce, current processes and HR challenges.
Find the missing, weak, inconsistent or person-dependent processes.
Create the structure, processes, policies, SOPs, dashboards and systems needed.
Help HR and department managers actually adopt the new system.
Digitise repetitive and approval-based workflows where it is worth doing.
Track hiring, attendance, employee cost, performance, training and attrition.
Strengthen the people-management system continuously, not once.
From the GullyHR blog: one on HR in telecom, and one on each of the topics this page points to.

Why field engineers, network operations and installation staff leave telecom jobs, and how to ask about on-call, travel, targets and growth at exit.
7 min readRead article
Hiring decisions made one request at a time, in the month the pain is worst. What a workforce plan contains and why a twelve-month view changes what you hire.
7 min readRead article
A flat structure works until the founder becomes the only route to a decision. How to tell when you have passed that point, and how to redesign without a reorganisation.
8 min readRead article
A shift, weekly and monthly safety routine for rubber plants that names who checks platen guards, mill trip bars, autoclave doors, burst-test cages and slings, and who acts on near misses.
7 min readRead articleMore on the GullyHR blog.
Keep a core of skilled staff, build a bench of people you can call back and plan the rest as project-based roles. A forecast reviewed monthly with sales makes surprises smaller.
Yes. A single standard for climbing, kit and briefing avoids confusion on site. Confirm contract and liability points with a qualified professional.
Use a common grade structure with a clear location element, and be ready to explain differences. Open numbers are better than rumours.
Knows the sites, the people and the clients, spots trouble early and reports briefly. Training in people management helps, since many are promoted from technical roles.
Hold a joint handover at each site, with a checklist signed by both sides. It reduces blame and clarifies who owns what once the site is live.
First we would read headcount over the last year against orders, ask who owns delay on a recent site and list who is cleared for tower work. A role definition set with a workforce plan is a natural first job, and scope goes into writing for your sign-off.
All 5 business types in telecom and field technology services · Find another business type
Tell us what is slowing your team down. We’ll help you find a practical way forward, starting with a conversation.