Hiring an operator with years on a similar machine feels like a shortcut. He has run a two-colour sheetfed before, or a narrow-web flexo line, or a bag-former. Owners often put him on the machine on the first morning and expect output by lunch. Then the trouble starts. Your press has a worn gripper bar on one side. Your customers sign proofs differently. Your spoilage sheet is filled at job end, not at shift end. Nobody warned him, so his opening week passes in public corrections beside the delivery.
Below is a sheet for exactly that week. Supervisor and newcomer complete it jointly across six shifts. It works for press operators, rewinder and slitter hands, folder and stitcher operators, and machine setters in converting units.
Why experienced hires need a first week too
- Machines have quirks. A form roller wants extra stripe; a feeder doubles on thin bond; a slitter blade wanders after lunch.
- House standards differ: how the approved proof is marked, who passes the first-off sample, what tolerance the regular customers accept.
- The paperwork differs: job bag contents, docket codes, how waste and reprints are logged.
- The people differ: who to call for a plate remake, a mechanic, a shade correction or a delivery change.
Skipping these does not save time. It moves the learning into live jobs, where mistakes cost paper, ink and goodwill.
The checklist
Name, machine, section, start date, supervisor, mentor operator.
SHIFT 1. Gate pass, locker and protective kit issued. Machine clearances recorded for the machines this person may run.
SHIFT 1. Walk the section: stops, guards, fire points, solvent store, first-aid box, assembly point.
SHIFT 1. Consumables: where blankets, plates, blades, cores, inks and wash are issued, and the issue slip.
SHIFT 2. The docket and job bag: what each field means, where the approved proof sits, who signs the first-off.
SHIFT 2. Machine quirks explained by the mentor: known faults, settings that differ from standard, what to watch.
SHIFT 3. First supervised run on a familiar repeat job, mentor alongside.
SHIFT 3. Spoilage and waste: how it is recorded on this floor, and when.
SHIFT 4. People to meet: counter or estimator, prepress, ink room, mechanic, finishing lead, dispatch.
SHIFT 4. Escalation: what to do if colour, register, die position or count goes wrong mid-run.
SHIFT 5. Solo repeat job; mentor checks the first-off and the handover log at shift end.
SHIFT 5. Shift handover: how the log is written and what the next operator must be told.
SHIFT 6. Sit-down with the in-charge covering progress, lingering doubts and the next skill.
Unticked lines rolled forward, each with a person responsible and a deadline.
Supervisor signature. Operator signature.How to use it
- 1
Print it before the operator arrives
Fill in the name, machine and mentor. Hang it by the in-charge's bench, never in the cabin.
- 2
Tick jointly as each shift closes
Spend five minutes as the hooter sounds. The in-charge reads that shift's lines aloud; both initial, or jot what slipped.
- 3
Choose a mentor operator, not the supervisor
A steady operator on the next machine knows the quirks best. Give them time to explain, and thank them for it.
- 4
Hold the review on the sixth shift
Three prompts: what now makes sense, what still nags, which machine skill tempts you next. Write replies straight onto the sheet.
- 5
File it and use it again
File it with personal records and reopen it at probation to check whether early worries got resolved.
Ownership of the sheet
Responsibility sits with the in-charge, while the newcomer initials beside him, making it joint rather than an inspection. Use it for every new operator, including transfers from another section of your own floor. Raw helpers and feeders need a longer runway, described in our thirty-day floor induction. After shift six, a probation review sheet continues the record.
Adapting it to your section
Digital counter shops should add file preflight and counter hand-off lines, since their operators face walk-in customers. In an industrial printing unit, add ink viscosity checks, drying tunnel settings and solvent handling on shift one. In a bag unit, add paste mixing and size-change records. How counter-facing shops manage opening days appears under induction for quick-print shops.
Getting more from it
Compare carried-forward lines across several newcomers. A line that keeps failing, say nobody explaining the spoilage sheet, exposes a floor habit rather than weak recruits. GullyHR's induction design work turns such sheets into routine. Wider context sits on our press and converting HR hub, and owners can request support through a short online brief.


