The primary crusher trips and only one fitter knows why the interlock on the feed conveyor keeps holding. That fitter is on leave in a village with a weak phone signal. Dumpers line up behind the hopper while the control room operator tries switches in turn.
How do you stop a quarry depending on a few skilled people?
List the tasks that halt blasting, loading, crushing or dispatch, then score who can do each one against four evidenced levels. Wherever only one person can work alone, name a learner and a trainer, schedule supervised time, and observe the result. Keep legal authorisation as a separate mark that training scores never override.
Walk the stone from face to truck
Do not start with job titles. Follow one load of material through the site and note every point where a particular skill is needed: drill pattern setting, charging and firing, secondary breaking, face loading, hauling, primary and secondary crushing, screen changes, washing, sampling, stockpile loading, weighbridge ticketing and dispatch calls. Add the support work that keeps these alive, such as hydraulic repairs, belt splicing, electrical fault finding, water spraying and fuel records.
At each point ask the supervisor three questions. Who does it today? Who could do it tomorrow without being watched? What happens on site if neither is here? The third answer tells you which rows to train first.
Define levels a supervisor can observe
- Level one, learning: knows the hazards and signals, works only beside a trainer.
- Level two, assisted: completes the routine task and pre-start checks with the trainer nearby, still asks about unusual conditions.
- Level three, independent: works alone in normal conditions, spots faults, stops correctly and records accurately.
- Level four, trainer: handles difficult conditions, explains why, and can assess another person fairly.
Write one line of evidence for each important cell, such as the date observed, the machine model and the conditions. Level three on a small excavator on level ground says nothing about a breaker at the foot of a fresh face. Split rows where the difference matters. Mark authorisation with its own letter and expiry date, so that a talented helper without the required certificate never appears as cover.
Site:
Updated on: By:
Levels 1 to 4. A = authorised.
Names across, tasks down.
TASK P1 P2 P3
Excavator face __ __ __
Rock breaker __ __ __
Dumper haul __ __ __
Drill rig __ __ __
Shot firing __ __ __
Crusher control __ __ __
Screen change __ __ __
Belt splice __ __ __
Power faults __ __ __
Sampling __ __ __
Weighbridge __ __ __
Rows with one at level 3+:
Learner named:
Trainer named:
Next observation date:Read the sheet for exposure
Look along each row first. A single person at level three or above means the station stops when they are away. Two people on the same shift who share a village or a contractor may still leave you exposed during a festival. Then look down each column: one fitter holding crusher faults, belt splicing and electrical resets is carrying three risks, and a resignation would remove all of them together.
Check expiry dates beside the levels. A row can look healthy until you notice that the backup's certificate runs out in the middle of the dry-season dispatch rush. Compare the matrix with the leave plan and the weekly shift plan, so a supervisor sees thin cover before approving time off.
Teach on the machine, on purpose
- 1
Pick two or three rows
Choose rows where an absence stops dispatch or creates a safety gap. Resist training everything at once, which leaves every learner half ready.
- 2
Pair learner and trainer
Name both on the shift plan. Tell the trainer that teaching is part of their job and recognise it in pay or standing, since a person who fears replacement will teach slowly.
- 3
Protect the slot
Use quieter dispatch periods, maintenance stoppages and rained-off hours. Book the slot ahead and let only the site manager cancel it, with a new date.
- 4
Teach the unusual
After routine work, practise or talk through a choked chute, a soft bench edge, a hose burst, a belt tracking off and a power cut during crushing.
- 5
Observe and sign
A competent person other than the learner watches the task and records the level. Where the law demands formal examination, the matrix waits for that result.
Capture what lives in one head
Long-serving drillers read the rock. A crusher operator hears a bearing before the gauge shows anything. Ask them to talk through these judgements while a learner records short notes or voice clips: what they saw, what they did, when they stopped. Keep a one-page fault card at each station with symptoms, safe first actions, isolation points and who to call. The cards support training and never authorise a person to attempt repairs beyond their level.
Include contractor crews where your production depends on them. Ask the contractor to name their trained people and backups for your site, and show them on a separate block of the same sheet. If the contractor leaves, you will know exactly which skills leave too. Raise any thin row with the gang leader before the next busy period, and agree who trains the replacement, when site induction happens and what evidence you need before that person touches plant.
Show people their next step
Share each person's own line with them and agree what they will practise next. A helper who can see the route from spillage clearing to the screen and then to the loader has a reason to stay through a slow season. Say what moving up changes in duties and, where you have decided it, in pay. If no seat will open soon, say that honestly too, because a trained person left waiting without explanation starts looking elsewhere.
Keep the matrix honest
Update it after an observation, a new joiner, an exit or an expiry. Check a few cells at random by asking the person to show the task. Scores inflate when a supervisor wants the sheet to look healthy, so praise a truthful gap. A learning and development process turns the gaps into a training calendar with owners.
Where to go next
The guidance for mining and quarrying businesses shows how skills records connect with shift plans and induction. If your critical rows have no obvious learner or trainer, tell us your requirements and list the machines and sites concerned.