At month end the owner of a stone quarry reads tonnage, diesel and receivables closely. Nobody mentions that the same drill helper has covered nights for weeks, two contractor workers have no induction record and a loader certificate lapses soon. Each of those surfaces later, at the worst possible hour.
What should a quarry owner check about people every month?
Check who was on site against who should have been, whether each machine was run by an authorised person, where overtime and rest gaps are building, what safety reports and training show, how contractor crews are recorded, and who left or may leave. For each, name a source, an owner and a dated action.
Six checks, their sources and your response
Attendance against plan. Take the gate register and the shift plan. Look for stations that ran short, last-minute swaps and gangs that thinned around market days, harvest or festivals. If one seat is repeatedly covered by pulling someone from another, you have a staffing or training gap, so name a learner or start hiring.
Authorisation against operation. Compare machine logs or pre-start sheets with the authorisation list. Any operator not on the list is an immediate matter: stop the practice, find out who instructed it and why no authorised person was available. List certificates and medicals falling due and book renewals now.
Overtime and rest. Pull hours by person from the wage inputs. Long runs concentrated on a few drivers, fitters or crusher operators point to fatigue risk and dependence. Redistribute shifts, train cover or limit the dispatch promises your sales staff make.
Safety reports and talks. Read near-miss notes, injuries, equipment damage and toolbox talk attendance. A month with no near misses at an active face deserves questions about whether people feel safe reporting. Close open actions on haul roads, guards, dust suppression and berms, and tell crews what changed.
Contractor crews. Ask each contractor for the current worker list, induction dates and any complaint about wages or housing. Compare with your gate register. Unknown names mean the entry control has failed; unpaid-wage talk means a meeting this week, with advice on your responsibility.
Exits and warning signs. Record who left, from which gang and shift, their stated reason and what their supervisor noticed. Ask who has requested advances, refused extra shifts or mentioned a neighbouring site. Hold a private conversation before the resignation, and bring back one thing you can change.
Triggers to agree before the first meeting
Arguments about whether something matters waste the hour. Write your responses down in advance:
- Any unauthorised operation: the owner is told the same day and the cover gap gets a named fix.
- The same critical seat short more than once: start cross-training or recruitment.
- A certificate falling due before the next review: book renewal and name the stand-in.
- Two exits from one shift or gang: a private conversation with those who remain.
- A contractor unable to produce a worker list: hold further entry until it arrives.
The sheet to complete
Month:
Site:
Present: owner, manager, super.
1 STATIONS RUN SHORT
Station and days:
2 UNAUTHORISED OPERATION
Cases: Expiring next:
3 HOURS
Names with heaviest overtime:
Rest gaps seen:
4 SAFETY
Near misses: Injuries:
Open actions:
Missed toolbox talks:
5 CONTRACTORS
Unlisted workers:
Wage or housing complaints:
6 PEOPLE
Joined: Left:
At risk and why:
ACTIONS
What / who / by when
1.
2.
3.
Last month's actions done:An illustration of one finding
Suppose the sheet shows the night crusher seat filled by the day operator on several occasions. The easy response is to thank them. The better one is to ask why the night operator was away, whether the cover shift left enough rest, and which attendant could start supervised learning. The action then reads: plant in-charge names a learner and books observation sessions by a stated date. At the next review you ask to see the entries, and you ask the day operator whether the extra nights have stopped.
Run it without turning it into a long meeting
- 1
Collect the day before
The weighbridge or site clerk brings attendance, the plant in-charge brings machine logs, the accounts clerk brings hours and the safety lead brings reports. Missing records are themselves a finding.
- 2
Start with old actions
Ask for evidence of completion, such as an induction signature or a repaired berm. Move a stalled item to a named person with authority to finish it.
- 3
Take exceptions only
Spend time on departures from plan and repeated patterns. Skip the stations that ran as expected.
- 4
Decide no more than three actions
Choose those tied to safety first, dispatch second and office tidiness last. Urgent hazards never wait for the meeting.
- 5
Verify on the ground
On your next visit, pick one name from the register and one line from a log. Speak with the person and check that the record matches what happened.
Season changes the emphasis. Before the rains, review stand-down arrangements, drainage training and how you will keep skilled people paid and occupied. Before the dry-season order rush, look at rest, heat, dust and whether temporary increases in contractor numbers have been inducted.
Tell the crews what happened
A review that stays in the office teaches workers that reporting changes nothing. After the meeting, each supervisor gives a short update at shift start: which hazard was fixed, which request is still open and what was declined, with the reason. Use the local language and keep names out of it. When someone raises a point, write it down in front of them and bring an answer by an agreed date.
What to leave out
Skip long score tables, averages that hide one overworked pit and rankings of supervisors by incident count, which reward silence. Do not discuss an individual's private matters in front of the group. If the same item appears three months running, the problem is a decision you have postponed: money, a hire, a dispatch limit or a contractor change.
Reviews work better when supervisors also hold short regular conversations with their crews. A simple performance management process gives those talks a shape and feeds this meeting with specific observations rather than impressions.
Where to go next
Our page for mining and quarrying businesses covers the registers that supply this review. If your sources disagree with each other or nobody owns the actions, tell us your requirements and describe how the month currently gets closed.
