Skip to main content
GullyHR

Setting day rates, grades and bonuses fairly in film and television production

How production companies can set day rates and salaries by capability, define extra hours, design fair bonuses and move without pay cuts.

Ganesh HS · · 7 min read

Creative agency colleagues discussing account workload and career progression in a design studio

In brief

  • Find out what your current rates really reward before changing them.
  • Grade each craft by what a person can run alone, not by who asked loudest.
  • State what a day contains and what happens when it runs over.
  • Protect existing rates while new bookings follow the written bands.

Two focus pullers on the same web series compare notes over lunch. One negotiated by phone during a busy month and earns more per day than the other, who has stayed with your unit through several projects. By evening the camera assistants are asking their own questions, and the line producer has no written answer.

How can a production company set pay, grades and incentives fairly?

Group roles into a few levels based on what a person can handle alone, give each level a rate or salary band, and write what a working day includes. Pay extra time, nights and travel by stated rules. Keep any bonus small, visible and tied to quality and safety. Move existing people without cutting anyone.

Find out what you pay for now

Take the last few project payment sheets and put crew side by side by craft. Note the rate, days, extras and who approved each. Then ask why the differences exist. You may find rates reward urgency of booking, closeness to a producer, own equipment, or how hard someone bargains. Some of those are legitimate: scarce skill, hired kit, a short-notice call. Name them as separate items so that they do not disappear into a single mysterious rate.

Grades by capability, craft by craft

Four plain levels work as a starting frame: learner, assistant, lead and head. Describe each with things you can watch. In lighting, a learner moves and secures equipment under direction, an assistant rigs to a plan, a lead runs the floor and checks power and safety, and a head designs the plan and answers for the unit. In editing, the steps run from organising media, to assembling scenes, to delivering a cut through rounds of notes, to guiding the whole post schedule.

  1. 1

    Define levels with department heads

    Write three or four observable abilities per level for each craft you book regularly. Skip crafts you hire rarely and price those by quotation.

  2. 2

    Set a band for each level

    Use your own recent payments, what candidates and heads report about current rates, and your budgets. Record the date and source, since rates move.

  3. 3

    Separate the extras

    List kit hire, travel days, night work, location allowance, meals, extended hours and holding days as their own lines with their own approval.

  4. 4

    Place each person

    Heads propose a level with an example of work. A second person, such as the line producer, checks across departments so one head is not generous and another strict.

  5. 5

    Publish what affects them

    Tell each person their level, band position, what the next level asks and when you will look again.

Define the day before arguing about extra time

State the hours a booked day covers, whether meals and travel count, the rest owed between wrap and next call, what triggers extra payment, how night shoots and weekly offs are treated and what happens on cancellation or weather holds. Name who may approve an overrun while it is happening. A flat day rate with undefined hours transfers every schedule mistake onto the crew, and good people price that in by avoiding you.

For the permanent core, check that salary reflects the post, not the number of projects someone quietly absorbed. If producers and coordinators routinely work through shoots and then return to office hours, decide how time off or allowances are handled and write it.

Work through one overrun

Say a night exterior runs well past wrap because a rain effect failed. With written rules, the set coordinator logs the actual wrap, the line producer records the approval and cause, each head confirms who stayed, and the extra amount appears on the next payment list. Drivers and spot boys who leave last are included without having to ask. The next morning's call moves to protect rest, or the exception is approved and recorded by someone with authority. Run your own recent overrun through the sheet and see where it stalls.

Rate and day sheet
Craft:
Level: L / A / Lead / Head
Can do alone:
1.
2.
3.

Day rate band: from ___ to ___
Band checked on (date):
Source of the figures:

A day covers:
Extra time starts after:
Extra time paid as:
Night rule:
Travel day rule:
Cancellation rule:
Kit allowance:
Approver for overrun:
Payment date after wrap:

Incentives that do not damage the work

  • Avoid a bonus for finishing early on its own: it rewards skipped safety checks, thin coverage and pickups later
  • Prefer a wrap payment tied to agreed conditions, such as complete footage and logs, kit returned, no unreported incident and rest rules kept
  • Do not penalise people for stopping an unsafe shot or reporting damaged equipment
  • Share the condition and amount before the first day, and say who judges it
  • Recognise teaching: a head who brings an assistant up a level has added capacity you can book

Credits, a first chance at a higher post and an early confirmed booking carry weight with crew. Offer them honestly, and never as a substitute for money that was agreed.

Treat vendor-supplied hands with care. When lighting or transport people come through a supplier, put the day definition and overrun approval in the supplier agreement, and ask how the extra amount reaches the person. Your set rules still govern what happens on your floor.

Move to the new bands without cutting anyone

Where a person already earns above the band, keep their current rate and hold it steady until the band catches up, explaining this privately. Where someone sits well below, plan the rise in stated steps that your budgets can carry, starting with the widest gaps and the posts you cannot easily replace. Apply bands to new bookings from a named project onward and honour every note already agreed. Budget the change inside project costings before you announce it.

Expect questions. A person told they are at the assistant level should hear which two abilities would move them up, and who will give them the chance to show those on a set. Review bands after a few projects, using declined bookings, late replacements and rate disputes as signals.

Keep one person accountable for the bands, such as the production head. Producers may propose an exception for a particular booking, but it should be written with its reason and end date, so that it does not silently become the new floor for the whole department.

Where to go next

Compare payments for a single craft across recent projects and write down every unexplained gap. Our film and television production HR page covers the wider picture, compensation benchmarking and salary structures explains how bands are built, and compensation and rewards strategy looks at what pay should encourage. To discuss your case, send your requirements.

Questions we are asked

Same level and same conditions should land within the same band, with differences you can name, such as own equipment, scarce skill or short notice. Record the reason at booking. If you cannot explain a gap to the person on the lower rate, revisit it.

Related service

HR for Film and Television Production: crew hiring, shoot-day attendance, freelance deals and daily wages

HR for film and television production: project-based hiring, crew onboarding, shooting-day attendance, freelance contracts and daily wages.

Talk to us about this

Read next

Start with your business need

What does your HR team need to solve?

Tell us your industry, team size and the issue you want to address. Bring one example of where work gets delayed or ownership is unclear, and the deadline or decision you are working towards.

  • A free first conversation with an HR practitioner
  • A clear scope and fee before any paid work
  • A practical next step for your business

Let’s start with your business

Share your contact details and the HR challenge on your mind. We’ll help you find the right starting point.

Include your country code, for example +44 or +1. Indian numbers can be 10 digits.

Your details stay private. Privacy policy