Picture this: the concrete truck is booked, the pump is on its way and the vibrator operator sends a message to a gang member's phone: not coming. The supervisor pulls a helper off block work, the mason now has no mortar, and nobody records any of it until the wage query arrives.
How should attendance and cover work across sites?
Record arrival and departure at each place of work, confirm it daily, and route every absence call to one named person before the shift starts. Keep a cover list for roles that stop work, check qualifications before substituting anyone, approve overtime in advance, and let swaps count only once the supervisor has recorded them.
Start with the roles that stop the day
Not every absence costs the same. A missing helper slows a gang. A missing crane operator, slinger, scaffold inspector, authorised electrician or site engineer at a hold point can halt several gangs and a booked delivery. In property management, an absent duty technician leaves a lift fault or a leak unanswered. In a sales office, one missing host on a busy visit day leaves buyers waiting.
For each such role, write the primary person, a qualified second, and what happens if both are away: reschedule the activity, move someone from another site, or call a hire firm that supplies operated plant. Equipment rental and earthmoving firms should keep this list by machine, since permission to run one does not carry to another.
Attendance that settles arguments
- One capture point per site, with a fallback sheet for dead phones or power cuts.
- Crews who travel straight to a client address check in from there, with the job number.
- Mid-day moves between sites are recorded by both supervisors, so hours are charged to the right job.
- Rain, access delays and material waiting are logged as reasons, not left as blank hours.
- Corrections are requested in writing and approved by someone other than the person claiming.
Show workers their own recorded days before pay is calculated. A few minutes at the end of the week finds errors while the supervisor still remembers who stayed to finish the screed.
The absence call, step by step
- 1
Call the named number
The worker rings or messages the supervisor or duty coordinator before the cut-off. A word passed through a friend does not count, though the supervisor should still follow it up.
- 2
Capture three facts
Who, expected return and any task or key, tool or vehicle that others need today. Do not demand private health details on a group chat.
- 3
Decide on cover
The supervisor checks the cover list and the ticket register, moves a qualified person, resequences the work or postpones the delivery.
- 4
Tell those affected
Inform the gang, the other trade waiting, the client or tenant and the office, so nobody turns up to a job that has moved.
- 5
Follow up silence
If someone is expected and unheard of, ring them and then their emergency contact. On remote or lone work this is a welfare check, not a discipline matter.
A cover card you can copy
Site: [ ] Week: [ ]
Absence calls to: [name, phone]
Call before: [time]
Stop-work role: [ ]
Primary: [ ]
Qualified second: [ ]
Card checked on: [date]
If both away: [reschedule /
borrow / hire]
Delivery to hold: [ ]
Client to tell: [ ]
Overtime today
Reason: [ ]
Names: [ ]
Hours expected: [ ]
Approved by: [ ] Time: [ ]
Swap
From: [ ] To: [ ]
Dates: [ ]
Supervisor agreed: [yes / no]Swaps, standby and overtime
Allow swaps between people with the same qualifications, agreed by the supervisor before the day. Private arrangements leave the ticket register wrong and the wage sheet disputed. For night road work, shutdown tie-ins and tenant emergencies, publish a standby rota stating who answers, how quickly they are expected to respond, what standby is worth and how a call-out is recorded.
Overtime needs a reason written before it starts: finishing a pour, making a structure safe, meeting a possession window. Review which jobs need it repeatedly. Persistent evening work on one site frequently points to late materials, poor sequencing or a gang that is short, and paying for hours will not repair any of those. Watch fatigue for drivers and plant operators, who should not roll from a long night into an early start.
Weather, access and programme changes
Some absences are not personal. Rain stops paving and roofing, a client locks a floor, a crane is stood down for wind, or a delivery fails. Decide in advance who calls a stoppage, how people already travelling are told, which indoor or workshop tasks they can move to and how the lost time is treated for pay. Write that last point into worker terms, so it is not negotiated in the cabin at seven in the morning.
A slipping programme pushes supervisors to ask for longer days from the same dependable people. Before agreeing, look at what they have already worked, whether the task needs sharp attention such as lifting or live electrical testing, and whether another crew could take part of it. Record refusals neutrally. If saying no costs a person their next posting, your overtime is not voluntary in any practical sense.
A weekly look at the pattern
- Which roles had no qualified second when someone was away.
- Which absences were known in advance but not passed to the planner.
- Where the same people carried the extra hours again.
- Which attendance corrections were disputed, and what record was missing.
Give each finding to one person to fix before the next roster is issued. A short conversation between planner and supervisors is enough when the facts are on the table.
Where cover plans fail
They fail when the second person has never actually done the task, when the list names someone who moved to another site, and when subcontractors are assumed to have their own cover. Ask each subcontractor who replaces a key operative and how much warning you will receive. Plan around known peaks too, including festival and harvest periods when crews travel home, school holidays and the weeks before handover.
A written attendance, shift and leave process fixes these routes across head office and sites. The wider picture for builders, trade contractors and property firms is on our construction and real estate page.
Where to go next
Pick one site and fill in the cover card for its stop-work roles before next week begins. If you want help setting the rules across all your sites, share your requirements.