Imagine a new carpenter arriving on Monday with confident talk about shuttering and a bag of borrowed tools. By midweek the column forms are out of plumb, the pour is postponed and the supervisor admits that the hiring test was a handshake and a question about experience.
Where do construction firms find people and test them?
Look to former workers, referrals from trusted crews, trade training centres, supplier and hire counter contacts, and open advertising for office and sales roles. Test each shortlisted person on a short, safe piece of the actual work, scored against written points by someone competent, then confirm qualifications and terms in writing.
Sources, matched to the role
- Gang trades such as masons, steel fixers, shutterers, tilers and paving crews: former workers and referrals from your reliable hands. Record who referred whom, and do not let one gang leader become your only supply.
- Electricians, refrigeration technicians, plumbers and welders: training institutes, apprentice schemes, wholesalers' counters and trade associations.
- Plant operators and drivers: hire firms, equipment dealers' training courses and neighbouring sectors such as quarrying and haulage.
- Engineers, estimators, planners and drafters: college placements, professional networks and people who worked opposite you on earlier contracts.
- Brokerage, leasing and property management roles: advertisements and referrals from hotels, retail and customer service, where people already handle complaints in person.
Keep a rehire list. Note who left on good terms, which site they worked on, what they can do and when their current commitment ends. Someone you have already seen on a wet day is less of a gamble than any interview answer.
Run the hiring steps in this order
- 1
Write the need
Name the site, tasks, required cards, start date, expected duration, supervisor and pay basis. If the supervisor cannot describe the first fortnight's work, the vacancy is not ready.
- 2
Screen quickly
Ask what they built, installed or managed last, which parts they did personally, what tools or machines they used and when they can start.
- 3
Check permission to work
See original cards, licences and identity documents as local rules require, and verify with the issuer where you can.
- 4
Test on real work
Use a marked area or training piece, with induction and protective equipment first. Agree whether the time is paid.
- 5
Decide and record
The tester and supervisor score separately, compare, and note the reason for taking or declining the person.
- 6
Confirm in writing
Send site, rate, hours, travel and lodging arrangements, start date and reporting contact before they give up other work.
Work tests that show the truth
A mason sets out and raises a short return corner while the tester checks line, level, plumb and joints. An electrician finds a planted fault on an isolated test board and explains how they proved it dead. A welder produces a test piece for visual inspection, with further testing where the job demands it. A plumber assembles and pressure tests a short run. An excavator operator carries out pre-start checks and trims to a marked level beside a signaller.
A site engineer reads a drawing set and names clashes and missing information. An estimator takes off a small quantity and states assumptions. A leasing or sales candidate handles a role-played viewing where the visitor asks about a charge or date the candidate does not know. The good answer is to say so and find out, not to invent one. A property manager responds to an angry tenant reporting water through the ceiling.
A trade test sheet you can copy
Candidate: [ ]
Role: [ ] Date: [ ]
Tester: [ ]
Task given: [ ]
Cards seen: [ ]
Induction done: [yes / no]
Score: good / acceptable / poor
Checks tools first [ ]
Protective equipment [ ]
Reads drawing or brief [ ]
Method and sequence [ ]
Accuracy of result [ ]
Waste and clean-up [ ]
Asks when unsure [ ]
Unsafe act seen: [yes / no]
If yes, stop and record: [ ]
Can work alone on: [ ]
Needs supervision on: [ ]
Decision: [take / hold / decline]
Reason: [ ]What not to rely on
Years of experience say little about which tasks someone has done. A long record on large sites may mean one repeated activity. Certificates show a threshold, not speed or care. A friendly referral deserves the same test as a stranger, or the referral system becomes a back door. For office roles, skip puzzle questions and ask for a sample of work close to the job.
Hiring ahead of the programme
A hiring scramble starts with a late request. Ask each project manager to look at the next phases and name the trades needed, the likely start and the people finishing elsewhere who could move across. Check your own list and the rehire list before going outside. Then open the search for scarce roles early, particularly authorised electricians, plant operators, experienced supervisors and planners, whose current employers may require long notice.
Keep one request form so that sites do not hire separately and compete with each other on rate. The person approving it should see the existing pay for that role, because a hurried offer to a newcomer becomes next month's grievance from the crew already there.
Review the first fortnight
A test is a sample, and the first two weeks complete the picture. Have the supervisor note attendance, safety habits, accuracy, care for tools and how the person takes correction. Compare that with the test scores. If someone who tested well struggles, check whether the induction, materials or instructions failed them. If the test missed a recurring fault, change the exercise so the next candidate has to show that skill.
Also ask the newcomer what differed from what they were told. Answers about travel, lodging, hours or pay timing show where your offer message needs correcting before the next hire.
Keep the person between offer and first day
Good tradespeople have other choices. Name a contact, confirm transport and lodging, say what to bring and call shortly before the start. Make sure the supervisor expects them and has a buddy and induction slot ready. A recruitment process sets out these hand-offs, and interview scorecards help with engineer and sales hires. Role pressures across the sector are described on our construction and real estate page.
Where to go next
Choose the role that has caused the most rework lately and agree its test with your best practitioner. If you want help building tests and hiring routes across trades, tell us your requirements.