On his second morning, a new helper in a switchgear shop steps over a yellow chain to fetch a spanner. Beyond the chain, a board is under high-voltage withstand test and the amber beacon is turning. The tester shouts, nobody is hurt, and the helper is mortified. Nobody had told him what the chain or the beacon meant. He had been shown the canteen, the time office and his locker.
Electrical works have a particular first-week risk: the most dangerous place on site often looks like the quietest. The sheet below puts that lesson first and puts the remaining days in a sensible sequence. Print it single-sided on A4, one copy per joiner, and clip it to the supervisor's board until Friday.
Print this
NAME: ______ TOKEN: ______ BAY: ______ JOINED: ______ BUDDY: ______ SUPERVISOR: ______.
DAY 1 BEFORE THE FLOOR: [ ] papers and gate pass [ ] safety footwear, gloves and ear defenders signed for [ ] insulated tool kit issued and entered in the tool register.
DAY 1 THE LIVE AREAS: [ ] walked to the HV and live test bay boundary [ ] beacon, barrier and warning boards explained [ ] red tag and hold tag shown on a real unit.
DAY 1 THE OTHER DANGERS: [ ] crane path and sling area [ ] oven, varnish or oil plant if any [ ] fire point, first aid box, assembly point.
DAY 1 REPEAT-BACK: [ ] joiner states the five rules in their own words to the supervisor.
DAY 2 FOLLOW A UNIT: [ ] stores issue and kitting [ ] drawing and revision letter [ ] ferrule and wire colour scheme [ ] the traveller or route card [ ] a test report [ ] packing and dispatch note.
DAY 3 FIRST TASK, CHEAP MISTAKES: [ ] task named: ______ [ ] done beside the buddy [ ] buddy checks every piece.
DAY 4 GOOD AND BAD: [ ] station display of accepted and rejected samples [ ] one rework explained by the tester [ ] what to do when unsure: stop and ask.
DAY 5 FRIDAY TALK: [ ] pay date and how hours are recorded [ ] overtime and leave rules [ ] canteen, bus, washroom concerns [ ] grade 1 written into the skill matrix.
SIGNATURES: Supervisor ______ Buddy ______ Test in-charge (day 1) ______ HR ______ Joiner ______.The five rules said back on day one
- Never cross a test bay chain or barrier while the beacon is on, and never without the tester's word.
- Never touch, move or open a unit carrying a red or hold tag.
- Never work on anything connected to supply. If in doubt, ask whether it is isolated and locked.
- Stay out of the crane path while a load is moving, even to pick up a dropped tool.
- Stop and ask when a drawing, a colour or a ferrule number looks wrong. Nobody is scolded for asking.
Repeat-back matters more than a signed form. A helper who has said the rules aloud, in their own language, remembers them on the morning the beacon is turning.
Ten words to know by Wednesday
- Isolator and lock-out hasp: the switch that cuts supply, and the clip that takes everyone's padlock.
- Discharge stick: the earthed rod a tester uses on HV equipment before anyone touches it.
- Hold tag: the red label meaning a unit is stopped, whatever anyone says.
- Ferrule: the printed sleeve naming each wire end, matched to the schematic.
- Gland plate: the removable plate where cables enter a panel or board.
- Traveller: the route card that moves with each unit and carries every stage's signature.
- Megger: the insulation tester, and the reading people quote from it.
- Burn-in rack: the shelving where fittings or chargers run powered for hours before packing.
- Drum flange: the wooden or steel side of a cable drum, never a step or a seat.
- Tag line: the rope that steers a crane load, so nobody's hand goes near it.
A first job where mistakes are cheap
Day three should give the joiner real work with low stakes. A spoiled lug costs a few paise. A spoiled HV coil can cost a week. Choose by bay.
- Panel shop: cutting wires to a cut list, stripping and lugging scrap lengths, fixing DIN rail and ducting on a practice plate.
- Transformer works: handling and stacking pressboard, cleaning laminations, winding a trial coil on reject conductor under the senior's eye.
- Motor line: slot lacing on a practice stator, fitting wedges, carrying stators between stations correctly.
- Switchgear and boards: deburring offcut busbar, fitting gland plates, marking torque on a dummy joint.
- Cable plant: labelling drums, checking drum flanges and battens, watching the spark tester alongside the operator.
- Lighting and chargers: fitting gaskets, wearing the wrist strap at the ESD bench, packing finished units.
Who signs which line
- 1
Supervisor
Owns the sheet, chooses the day-three task and signs once the joiner has repeated the five rules.
- 2
Buddy
A grade 3 hand or better who shares the bench with the newcomer all week and inspects each day-three piece.
- 3
Test in-charge
Walks the joiner to the test bay boundary on day one and signs that line personally. Nobody else may sign it.
- 4
HR or the office
Runs the Friday talk with the supervisor, files the sheet and opens the skill matrix entry.
- 5
The joiner
Signs last, after the Friday talk, confirming each line happened rather than simply being read out.
Temporary and contractor hands
Hands sent by a labour contractor walk past that same beacon. Give them this sheet too, filed separately under the contractor's name. Never trim day one because someone may only stay for a single lot. A shortened day one is how the switchgear story above happens.
After Friday
Week two moves the joiner to supervised work on real units, still beside the buddy. The skill matrix template picks up from the grade 1 entry made on Friday. Probation stages beyond week one are mapped under employee onboarding. Large temporary intakes are handled on the induction route used by luminaire makers. Wider staffing strains for wiring, winding and extrusion floors appear on our electrical equipment manufacturing page.