An operator releases a large batch of sites, and the following week a subcontracted erection crew reports to a rooftop with harnesses in a van. The site supervisor assumes the project office checked their climbing records, while the project office assumes the contractor did. One climber has never worked on that kind of structure.
Who is cleared to climb on this site today?
Answer it with one clearance register covering your own staff and every contractor crew, a named person who checks it against the faces on site, and a pre-climb check with the authority to stop. Set this up before the next rollout wave, because hurried hiring is when unknown people reach the tower base.
The risk is built into the work: falls, weather, power, dropped tools and long drives between sites. A certificate in a contractor's office does not tell your supervisor whether it is current, covers rescue, or belongs to the person putting on the harness.
Decide who owns the answer
Role overlap causes trouble in materials chasing, and it is far more serious at height. Write down four ownerships. A central safety or training coordinator keeps the register. The project manager books only crews that appear on it. The site supervisor verifies identity and equipment on the day. The cluster head reviews stopped jobs and missing checks and is accountable for supervisors having time to do them.
State that a delivery date never overrides a failed check, and have the operations head say it to project managers directly. Crews watch what happens to the first supervisor who stops a climb on a late site. If that person is blamed, the form will be ticked from then on.
Build the clearance register
One row per person. Record name, photograph, employer, crew, role, climbing and rescue training with expiry, medical fitness where required, electrical authorisation if relevant, harness and fall-arrest kit identification, and the last practical assessment. Show a plain status: cleared, cleared with limits, or not cleared.
Contractor workers belong in it on the same terms. Ask for records before mobilisation, verify them in the way your adviser recommends, and have a competent assessor watch each new climber work before accepting the status. A replacement who arrives unannounced is not cleared until the register says so, however experienced the foreman declares them to be.
The check at the foot of the structure
Keep it short enough to be done properly, and run it before each climb and again after a weather change or a long break.
Site ID:
Date and time:
Supervisor:
Each climber:
Name matches register y/n
Status cleared y/n
Harness inspected y/n
Rested and fit today y/n
Rescuer on ground named:
Rescue kit on site y/n
Power isolated or safe y/n
Weather acceptable y/n
Drop zone barred y/n
Emergency route known y/n
Any "n" means no climb
Stopped by / reason:If any line fails, the supervisor records it, tells the project manager and keeps the climber on the ground until it is put right. Agree in advance what the crew does meanwhile, such as ground work or equipment preparation, so that a stop is an organised pause and not a standoff at a rooftop door.
Setting it up before the wave
- 1
List who climbs now
Collect names from every cluster and contractor. Mark records that are missing, expired or unreadable, and move those people off height work until resolved.
- 2
Agree the standard
With your safety adviser, define what each role needs and what an assessor must see in practice. Use the same standard in every circle or district, adding local requirements where they apply.
- 3
Name assessors and supervisors
Check that each cluster has enough competent people for the number of sites planned. If a supervisor cannot reach a site, decide who performs the check or reschedule the climb.
- 4
Put clearance into booking
A work order is released only with cleared names attached. Build lead time for training and assessment into the plan you send the operator.
- 5
Review stops and near misses
Each week, look at stopped climbs, dropped items, kit rejections and close calls. Fix causes such as late permits, long drives or shortage of spare harnesses.
Signs the system has become paperwork
- Forms from different sites carry identical times or handwriting.
- No climb has been stopped for weeks during a heavy rollout.
- Crews share a harness record, or kit identification is blank.
- Supervisors complete checks by phone from another site.
- Near misses are heard about in conversation and never entered.
Test the register with unplanned visits. Pick a site, compare every person present with the rows and ask one climber to explain the rescue plan. A mismatch calls for a look at booking pressure and contractor control before anyone reaches for discipline.
Bring new crews in during a rollout
Give each arriving crew, whether hired or contracted, a short induction before the first work order. Cover who the supervisor is, how a climb is stopped, where the register status comes from, the rescue plan, power isolation, public access around rooftops and how a near miss is reported. Deliver it in a language the crew works in, ask them to explain the stop rule back, and record attendance by name.
Plan for the end of the batch too. Record which people performed well, which clearances lapse soon and who wants to be called for the next wave. Keeping that list current shortens the scramble when orders return and gives you known climbers to approach first.
The next two things to set up
Plan field strength against the order book. Review confirmed and expected batches with project managers on a fixed schedule, count cleared climbers and assessors available, and decide early what will be hired, contracted or declined. This protects the clearance rule, which breaks first when promised sites exceed ready people.
Then write short role definitions for project manager, circle or cluster head and site supervisor, each naming who chases materials, permits, access and crew readiness. Check them against a recent delayed site to see whether one owner is clear for every step.
What can wait
Aligning pay across circles and designing separate career paths for rollout and operating teams both matter, and both can follow once nobody climbs unverified. An elaborate safety application can wait too. A controlled sheet that supervisors can read on site is a sound starting point.
Where to go next
Ask for this week's climbing names and check them against evidence. Read more on HR for telecom infrastructure companies, see our work on safety induction, training records and incident reporting, or tell us your requirements.