Skip to main content
GullyHR

Developers build for floors they never see: HR for supply chain technology companies

Turn warehouse and depot visits into planned learning for developers and testers, with tasks, host rules, follow-up fixes and support tickets as lessons.

Ganesh HS · · 7 min read

People working in a leafy Indian business neighbourhood with a bakery, studio and workshop

In brief

  • Give each product team planned floor visits with a question to answer and an output to share.
  • Use implementation consultants, support engineers and domain experts as teachers, with time set aside.
  • Check learning by changes in stories, test cases and design decisions, not by attendance.
  • Sort go-live rosters and sales handover next, since both feed what developers learn.

The scanning screen passed every test in the office. At the client's cold store a picker wearing thick gloves cannot hit the confirm button, the signal drops between racks and the pallet label has frosted over. The implementation consultant rings at night. The developer asks, sincerely, why the picker does not simply type the code.

How do developers learn what a warehouse floor is really like?

Plan it as learning with a purpose: send small groups to watch named tasks, give them questions and a host, and require a change to a story, test or design afterwards. Back this with lessons from support tickets and domain experts. One unprepared tour with a hard hat teaches very little.

Decide what each role needs to understand

Developers need to see how a task is interrupted: a short delivery, a damaged label, a shift change, a device passed between hands. Testers need the conditions that break assumptions, such as gloves, glare, noise and patchy networks. Product managers need to hear the supervisor's trade-off between speed and accuracy. Designers need to count taps while someone is walking.

Write two or three things each role should be able to do after the learning. A developer can describe the exception flows in goods receipt. A tester can add cases for lost connection during a count. These statements keep visits from becoming outings and let a lead judge whether anything changed.

Plan the visit like a piece of work

  1. 1

    Choose one process

    Receiving, putaway, picking, dispatch, yard movement or a transport planner's morning. Pick the one behind current complaints or the next release.

  2. 2

    Agree it with the client

    Client success arranges a host, a time that shows real volume, site rules, protective gear and what may be photographed or recorded.

  3. 3

    Prepare the visitors

    An implementation consultant explains the process terms and known pain points beforehand. Visitors write the questions they want answered.

  4. 4

    Watch before asking

    Observe a full cycle without proposing fixes. Note workarounds, paper slips, shouted instructions and anything done outside the system.

  5. 5

    Debrief within days

    Share what differed from expectation and turn it into stories, test cases or open questions, each with an owner.

  6. 6

    Close the loop

    Tell the host what you changed or why you did not, and show the wider team in a short review.

Floor learning note
Site, date and shift:
Process observed:
Visitor and role:
Host on the floor:
What we assumed:
What actually happens:
Workarounds seen:
Conditions: gloves, light, signal:
Words the crew use:
Story or test to change:
Owner and review date:
Reply sent to host:

Learn between visits from people already there

Your implementation consultants and support engineers hold floor knowledge that seldom reaches a sprint review. Run a short regular session where one of them replays a real incident: what the user was trying to do, what the screen allowed and what the floor did instead. Remove blame. A support engineer who has absorbed angry calls about a design fault should be heard as a teacher, with that contribution recorded in appraisal.

Domain experts are scarce, so spend their time carefully. Ask them to build a plain glossary, record walkthroughs of two or three core processes and review stories where a wrong assumption would be expensive. Pair a newer developer with them for a release. This grows a second source of knowledge and reduces the queue at one desk.

Check that learning changed the product work

  • New stories describe the exception as well as the happy path.
  • Test cases include the floor conditions that visitors noted.
  • Developers ask consultants questions earlier in design, before code review.
  • Repeat tickets from the same cause are tagged and reviewed by the owning team.
  • Joiners can explain a client process in the crew's own words after their first weeks.

Skip a company-wide logistics course as the opening move. People retain little when it is detached from the screens they maintain. Also avoid sending the same keen developer every time, or treating a go-live crisis as training: an exhausted team firefighting at a loading bay has no room to observe.

Make remote and newer staff part of it

Floor learning fails quietly when the same city-based seniors collect all of it. Keep a simple roster showing who has seen which process, and offer the next place to someone who has not. For people who cannot travel because of health, caring duties or location, arrange a live walkthrough with a host who can move the camera as questions arise, followed by time with a real handheld device and the client's exception list.

Keep the notes where developers already work. Link each floor learning note to the module and its tickets, tag it by process and name the person who saw it. When someone picks up a story about cycle counting, they should find what a colleague watched and whom to ask. Retire or recheck notes after a site changes layout, devices or process, because an old observation stated confidently can mislead a design as badly as a guess.

Once a quarter, let the product lead ask a plain question of each team: which assumption did the floor overturn, and what did we change? An empty answer points to visits without preparation or without follow-through. Fix that before booking more travel.

The next two things to put in place

First, plan go-live rosters. Name who is on site, who supports remotely, when relief arrives and when recovery time is taken, and publish this before the weekend is booked. Add developers who know the changed module to the remote rota. They learn from the live floor, and the consultants stop carrying every question alone.

Second, connect sales with delivery. Before a feature is promised, someone who knows both the product and the floor should say whether it exists, needs configuration or must be built. Turn surprises found after signature into short cases for pre-sales learning. Putting these routines into a learning and development process gives each one an owner, a calendar slot and a review that survives a busy release.

Where to go next

Ask your developers when they last watched a user work, then pick the process behind the noisiest tickets and arrange one prepared visit. See HR for supply chain technology companies for the rest of the people picture. To discuss a learning plan for your teams, submit your requirement; the first conversation is free.

Questions we are asked

Ask for a narrow, hosted visit with a clear benefit to their users. Where that is refused, use recorded walkthroughs made with permission, consultant replays, ticket reviews and a practice corner with real devices, labels and gloves. Keep asking when a release gives the client a reason.

Related service

HR for Supply Chain Technology Companies: Developers, Implementation Teams and Client Support

HR for supply chain technology companies: developers, implementation consultants, support engineers, domain experts, on-site work and retention.

Talk to us about this

Read next

Start with your business need

What does your HR team need to solve?

Tell us your industry, team size and the issue you want to address. Bring one example of where work gets delayed or ownership is unclear, and the deadline or decision you are working towards.

  • A free first conversation with an HR practitioner
  • A clear scope and fee before any paid work
  • A practical next step for your business

Let’s start with your business

Share your contact details and the HR challenge on your mind. We’ll help you find the right starting point.

Include your country code, for example +44 or +1. Indian numbers can be 10 digits.

Your details stay private. Privacy policy