Monday, A shift, the week after Ganesh Chaturthi. At six the turnstile shows fourteen board workers missing across three harness lines. A customer has pulled a variant forward. The in-charge borrows two crimpers, moves the continuity tester operator onto taping and asks the final inspector to help route wires. By nine a stand-in runs the tester. Two hours later a loom with a swapped terminal reaches packing.
Such days are not accidents. The festival calendar, wage credit dates and customer revisions schedule them. Our supplier-side HR overview says attendance and shift planning decide how steady a line really is. The rules below keep working when absence and demand spike together.
A rotation posted early
Presses, moulding halls and machining cells usually run A, B and C shifts. Stores, the quality office and maintenance planning keep a general shift. Rotate weekly or fortnightly. Pin the next cycle on the attendance board and in the operators' phone group a week ahead. Each line's roster belongs to one named in-charge. A late move needs that person's approval and a reason in the register.
Headcount before the siren
Count heads fifteen minutes before start, from biometric or turnstile data, never by eye. The time office rings absentees from a short call list. By the siren, the in-charge knows who is missing, which stations are hit and who covers each.
Cover by qualification, in a fixed order
- 1
Flex pool first
Operators trained on several stations of that line, visible on the skill matrix.
- 2
Named relief pair next
Every critical station has a partner signed off on it, listed on the cover board.
- 3
Line leader briefly
Only while other cover is arranged, and only on stations where the leader holds a sign-off.
- 4
Inspectors stay put
Final and patrol inspectors remain on inspection. Pulling them onto production is how busy-day escapes begin.
- 5
Shrink the plan when cover runs dry
Close a station rather than staff it with untrained hands. Warn planning early so dispatch can be re-sequenced.
Line and shift: harness line 2, A shift.
Turnstile headcount: planned, present, absent.
Absentees and stations: who is missing, and from where.
Cover given: station, cover name, source (flex pool, relief pair or line leader).
Stations closed: which, and why.
Signed: in-charge, with time.
Checked: time office, before the mid-shift tea break.Leave, festivals and wage week
- Planned leave. Apply a week ahead through the in-charge, with an answer inside two working days.
- Festival quota. For Diwali, Pongal, Onam, Eid, Ganesh Chaturthi and sowing or harvest weeks, publish how many per line may be away each day. Allocate by rotation across years, not by first request.
- Wage-credit Monday. Expect thinner turnout and roster the whole flex pool. Chart it by line so the trend is plain.
- Emergency leave. Grant it, log it that day and ask for a quick call to the in-charge before shift.
- Return after long absence. One supervised shift on critical stations before working alone.
Swaps, extra hours and rest
Permit operator-to-operator swaps only between people signed off on identical stations. The in-charge approves and logs each one. Cap back-to-back shifts and protect a rest gap before the next rotation. Enter every overtime hour against a name in a rotation register, so the same volunteers are not drained during each revision week. Our guide to fatigue caps for back-to-back shifts explains how to set those limits.
Nights need their own arrangements
After ten, the time office is dark, the canteen serves a reduced menu and the company bus leaves at a fixed hour. Name a night duty officer who may approve emergency leave and late cover changes. Leave a printed relief-pair list at the security cabin in case phones fail. Before handover, the night in-charge closes the cover board, so the morning clerk can reconcile punches against it. Rotate the plant head's night walk monthly, so nights never drift into a separate company.
Late arrivals and punch fixes
Fix a short grace window and enforce it the same way on A, B and C. Log late company buses separately, since that is a transport fault, not indiscipline. Repair missed punches the same day, confirmed by the in-charge, so month-end payroll inputs stay clean. A simple routine for this sits in our post on regularising missed punches.
Rolling the rules out
Fit the rules on two pages. Brief every in-charge in one short session. Read the cover boards weekly for a month. Our rostering and leave service builds this framework with you. Press and weld lines get their own treatment in the call-off attendance version for parts lines. Forging shops feeding the same customers appear on the forged parts attendance page. EV lines facing launch swings can add the EV workforce planning view.