The new helper reached the moulding hall at eight. By nine he was packing caps beside an injection machine, with no gloves and no one assigned to him. Before lunch he reached for a sprue that had just dropped and burnt two fingers. He came back the next day, then not again. The supervisor recorded it as 'left without notice'. The plant had spent a week finding him and lost him in three shifts.
The sector page on packaging HR notes that machine safety and handling practice must be taught before a new hand joins a crew. GullyHR's joining and induction service is the wider frame. This guide narrows it to the first thirty days on a packaging floor.
The week before he starts
- Pick a buddy who works the joiner's own machine and shift, usually a senior helper with patience.
- Keep the PPE kit ready in the right sizes: safety shoes, ear plugs or muffs, cut-resistant gloves and, for food packaging halls, hairnet, coat and overshoes.
- Tell the shift in-charge the joiner's name, start time and first machine.
- Prepare the locker, ID card and attendance enrolment so the gate does not hold him up.
- Run through the joining checklist for documents and pay details.
Day one: from the gate to the machine
- 1
Gate, ID and PPE
Issue the ID card and the PPE kit, show how each item is worn and record the issue against his name.
- 2
The floor walk
Walk the painted forklift aisles, reel and pallet storage, chocked reel stacks, emergency stop buttons, fire points, first-aid box and the assembly point. Show where he must never stand.
- 3
House rules
Timings, breaks, canteen, leave and absence calls, phone use on the floor, and in food packaging the hand wash, jewellery and chewing rules.
- 4
Meet the buddy and the crew
Introduce him at the machine. The buddy shows the machine's guards, nip points, hot surfaces and blades before anything else.
- 5
Watch a full cycle
He watches a full job or changeover from a safe spot, with the buddy explaining in his language.
- 6
End-of-day check
The in-charge asks three questions: what was clear, what was confusing, and does anything hurt.
Days two to seven: watch, carry, ask
The first week is for learning the floor's rhythm. The joiner carries cores, stacks bundles or packs product under the buddy's eye. He learns safe lifts for reels and board, how to call a forklift rather than drag a pallet, and when to hit the stop. He runs nothing alone yet. The in-charge checks on him briefly each day. On day seven, the buddy and in-charge agree whether he is ready for his first solo task.
By the day-seven check, the joiner should be able to show or say:
- Where the nearest emergency stop and pull-cord are on his machine.
- Which painted lane belongs to forklifts and clamp trucks.
- Why reels stay chocked and are never rolled by hand down a ramp.
- Whom to tell about a cut, a burn or a near miss, and where the first-aid box hangs.
- How to hand a doubtful cup, cap or carton to the checker instead of packing it.
Weeks two and three: one solo task at a time
Add solo tasks one by one, each shown, tried under watch and then signed off. Good first tasks differ by section:
- Corrugated converting: catching and stacking at the printer-slotter delivery, bundle tying, pallet labelling.
- Flexible packaging: core loading on the slitter-rewinder under watch, reel weighing and labelling, pouch counting.
- Rigid moulding: trimming and visual checks against the sample board, packing to count, carton labelling.
- Carton and label finishing: stripping waste, sorting by eye against the approved sample, case packing with lot slips.
- Food packaging halls: gowning routine, tray stacking, sample bagging for the checker.
Injuries new hands meet first
Most first-month injuries on packaging floors come from a short list of hazards. Show each one at the joiner's own machine in week one, and repeat it when he moves sections.
- Hot sprues, runners and nozzles around injection presses and blow moulders.
- Slitter knives and razor holders during core changes on the slitter-rewinder.
- In-running nips on laminator, coater and calender rollers.
- Strapping and banding that snaps back when cut under tension.
- Reels rolling off a stack that was never chocked.
- Hand pallet trucks on loading-bay ramps.
- Platen and guillotine areas while stripping waste.
- Hot-melt nozzles and glue pots on folder-gluers and carton erectors.
Day thirty: a short review
Name, machine, shift, buddy and in-charge.
PPE worn correctly every shift: yes, mostly, no.
Safety habits seen: lifting, guards, aisles, stops.
Tasks signed off so far, with dates.
Attendance and punctuality in the month.
Joiner's own view: what helps, what is hard, anything that hurts.
Next tasks to learn, and who will teach them.
Decision: continue on plan, extra support, or concerns to discuss.
Signed by the in-charge and the joiner.Who does what in the first month
- HR or admin: documents, ID, PPE issue, locker, attendance enrolment and the joining file.
- Shift in-charge: day-one rules, daily check-ins, the day-seven decision and the day-thirty review.
- Buddy: machine safety points, watching, carrying, first solo tasks and honest feedback.
- Safety lead: confirms the floor walk was done and the joiner knows the stops and exits.
- Trainer, where there is one: sign-off of tasks against the skill route.
Going further
The rigid packaging joining notes explain sample boards and hot-barrel safety for moulding joiners. The food packaging onboarding page covers hygiene briefings before any helper reaches a sealer. For the months after this one, use a ninety-day version of this plan. To get a first-month plan written for your sections, list your sections and shifts for us.