A cable jointing crew reaches a remote substation before sunrise. The client's gate officer finds that one jointer's electrical authorisation lapsed last week, the record is on the site engineer's laptop, and the engineer is at a bridge project a day's drive away. The outage window starts anyway.
Where should an infrastructure contractor start with HR?
Start with the things that can stop work or hurt someone: a central register of certificates and task authorisations, a dependable field attendance record, basic camp rules and a mobilisation check for every new site. Written contracts, grievance routes and project move planning follow closely. Appraisals and engagement programmes come after.
The first three foundations
- An authorisation register held centrally. For each person, list every certificate and client pass that controls a task: work at height, confined space, electrical isolation, crane signalling, welding qualification, heavy vehicle licence. Record the issuer, expiry, scanned proof and who checked it.
- A field attendance record. Note crew, work front, shift start and finish, travel where you count it, and the foreman's signature the same day. Decide what happens when there is no signal and a paper sheet has to travel in.
- A named camp in-charge with written rules on rooms, meals, water, sanitation, rest day, transport, visitors, medical help and how to complain without going through the person complained about.
These come first because their failures are immediate. A lapsed pass idles a crew and its plant while the penalty clause runs. A disputed shift record sours a foreman's relationship with the gang. A bad camp empties itself quietly, and the people with other offers go first.
Make the register stop the wrong deployment
A spreadsheet that nobody opens is a filing exercise. Give one person at head office ownership, let site engineers read it from the field, and run a look-ahead that lists everything lapsing soon enough to book retraining. Before a person is added to a task roster, someone compares the task with the register. If proof is missing, the answer is no until it arrives. Agree this with project managers beforehand so that the first refusal during a rush is not treated as head office interference.
Adapt the register to your kind of work
The columns are the same across the group while the rows change. Telecom firms need tower climbing and rescue authorisations for small crews that move daily. Electrical contractors need isolation, switching and live proximity permissions, which a utility client can withdraw. Plant installers need welder qualifications by process and position, plus rigging and hot work. Road, bridge and water contractors need operator authorisations, traffic control, excavation and confined space entry. Add client gate passes and medical fitness records where a client demands them, since a valid certificate is of little use to someone who cannot enter the site.
A mobilisation check for each new site
Use this before the advance party leaves. It forces the people questions into the same plan as plant and material.
Project:
Client site rules received:
Roles needed in first phase:
Staff moving from other sites:
Local labour source:
Sub-contractors and contacts:
Authorisations checked by:
Induction lead:
Camp in-charge:
Nearest medical help:
Emergency transport:
Attendance signer by shift:
Rest day and rotation:
Pay and expense queries to:
Demobilisation review date:Plan the camp before the beds fill
Camp decisions made after arrival become grievances. Settle room allocation, who cooks and who pays, drinking water, washing and toilets, power for charging phones, secure storage, transport to the work front and to town, and what happens when someone falls ill at night. Give the camp in-charge a small spending authority so that a broken pump does not wait for head office approval. Walk the camp on every site visit, speak to night shift sleepers about noise and heat, and ask a few residents what they would fix first. Write down the answer and report back.
Then close these gaps in order
- 1
Terms in writing
Give salaried staff a letter covering role, location, mobility, rotation, leave, allowances and notice. For local hires and sub-contracted crews, record who employs them, who pays, who supervises and who answers for safety training.
- 2
Induction at every site
Cover site hazards, permits, stop-work authority, camp rules and emergency movement. Repeat it for visitors who stay and for crews returning after a break.
- 3
Role clarity for site leads
Write what the project manager decides alone, what needs head office and who deputises. On a stretched site the same person faces the client, sub-contractors, labour and safety in one day.
- 4
A way to raise concerns
Provide two routes, one on site and one outside the site chain, and say how quickly someone will acknowledge a concern.
- 5
Project move planning
Review each site's closing date against the next bids. Tell each engineer and foreman what you know, including what you do not yet know.
Put the cost into the tender
People foundations cost money and time: retraining before expiry, travel for rotation, induction hours, camp facilities and a site administrator. Give estimators a short checklist so that these appear in the bid. Ask which authorisations the client demands, how early they must be shown, whether the camp is yours to build and what notice applies if the programme shifts. A cost left out of the tender returns later as pressure on the site manager, and the camp and training budgets are the first to be trimmed.
Test it before the next bid
Choose one live site and ask head office to answer, from records alone, who is there today, which of them may work at height, who signed yesterday's attendance, who runs the camp and when each engineer next goes home. Where the answer needs three phone calls, you have found the next job. Do the same with a crew sent out on a short breakdown call, since small mobilisations skip the checks that large ones follow.
What can wait
Leave detailed competency frameworks, annual appraisal ratings, culture campaigns and large software projects until the field records are believed. Software is worth considering once rules for offline entry, corrections and approvals are settled. An organisation chart for head office matters less than knowing who can sign a permit at a distant site tonight.
Where to go next
Compare your sites with the wider people patterns for infrastructure and engineering contractors. A paid HR audit can test records and responsibilities across sites after a free first conversation. To set out the problem in your own words, tell us your requirements.