Skip to main content
GullyHR

The first HR basics an architecture or interior design practice needs

Where to start with HR in an architecture or interior design practice: project roles, written terms, recorded hours, studio rules and what can wait.

Ganesh HS · · 7 min read

Workplace scene for Architecture Firms: Principals, Drawings and Site Teams

In brief

  • Name one accountable person for every live project and fee stage before writing any policy.
  • Put terms for staff, interns and freelancers in writing, including who owns drawings and models.
  • Record hours against project and stage so the principal can compare effort with fee.
  • Leave elaborate appraisal forms, bonus formulas and thick handbooks until the basics are in weekly use.

Picture a Monday in a small studio: a submission set is due on Thursday, the project architect is on site, and the junior designer cannot say whether the client approved the revised layout. A freelance visualiser is asking who signs off the extra views. Nothing here is a design problem.

In architects & interior design firms: what should the owner set up first in HR?

Start with ownership of projects, then written terms for everyone who touches them, then a simple record of hours by stage, then clear rules on leave and studio days. Add induction, probation and review habits next. Each step makes the following one easier, and none needs an HR department or new software.

The order matters because a design practice sells the time and judgement of a small team. A gap in who decides, or in who was meant to be on a drawing package, shows up quickly as unpaid revision rounds, late nights and a site team working from an old issue. Fix the points where people confusion costs fee, and leave the paperwork that only looks tidy.

The order of work for a studio

  1. 1

    Name an owner for every live project

    List each job, its current fee stage and one accountable person. Add who drafts, who checks drawings before issue, who speaks to the client and who visits site. In a small studio one name will appear several times, and that is useful to see in writing.

  2. 2

    Write down what each role does

    A short page per role is enough: principal, project architect or lead designer, junior designer, draughtsperson, visualiser, site coordinator, admin. State what each may approve alone, such as a finish substitution or a drawing reissue, and what goes to a principal. Role design and job descriptions explains how to build these.

  3. 3

    Put terms in writing

    Every employee and intern needs a signed letter covering duties, working hours, notice, confidentiality and ownership of work. Freelancers and visiting consultants need a one-page brief per job: scope, revision rounds, file formats, deadline, ownership of source files and payment timing.

  4. 4

    Record hours by project and stage

    Use the same short list of stage names on the fee proposal and the timesheet, for example concept, design development, working drawings, approvals and site. Include a line for unbilled client changes. Staff fill it in at the end of the day, and the project owner reads it weekly.

  5. 5

    Agree leave, studio days and site visits

    Say how leave is requested, how far ahead, and what happens in submission weeks. Set the days everyone is in for critique and coordination, the expected reply time when working from home, and how a site visit counts in the working day.

  6. 6

    Give joiners and juniors a first path

    For each new starter, name a buddy, a first task with checking, and a date to talk about progress. Put probation review dates in the calendar on the day the offer is accepted, so they do not slide past during a deadline.

The first week of setting this up

Take the live jobs first. Sit with the project architects and lead designers for one session and fill in a sheet for each job, noting every point where two people give different answers. Those disagreements are your real starting list: an unconfirmed client approval, a site visit nobody planned, a drawing package that two juniors both think belongs to the other.

Next, collect the letters and briefs you already hold. Mark who has none, whose terms no longer describe the role, and which freelancers are working from a message thread. Put missing signatures ahead of better wording, after your adviser has checked the text. Then pick a start date for timesheets that falls outside a submission week, so the habit begins on ordinary days.

How the first priority shifts across the group

An architecture practice or structural consultancy should put checking and sign-off high on the list, because a drawing or calculation issued without review carries real consequences. Write down who may issue, who checks, and what happens when the checker is away.

Interior design firms and modular kitchen studios feel the handover between sales, design, factory or vendor, and installation. Record who confirms site measurements, who freezes the design and who closes snags. Installers and fitters also need site safety instruction and a named supervisor from the first day.

Garden and planting designers should plan around weather and planting seasons, with a clear arrangement for outside irrigation, lighting and soil specialists. Visualisation studios and MEP design consultants depend on queue discipline: one intake point for requests, an agreed number of revision rounds, and a named person who decides which job moves first.

One sheet to copy per project

Fill this in when a job is won, keep it where the whole studio can see it, and update it at each stage change. It works on paper or in a shared file. If a line stays blank, you have found a decision that nobody has taken yet.

Project people sheet
Project:
Current fee stage:
Hours allowed for this stage:
Accountable owner:
Drafting and modelling:
Checker before issue:
Client contact:
Site visits by:
Freelancer or consultant:
Brief signed (yes / no):
Source files owned by:
Cover if owner is away:
Next review date:

What can wait

  • A detailed appraisal form with rating scales. A short monthly conversation about real drawings and site issues does more at this size.
  • A bonus formula. Until hours and fee stages are recorded reliably, any incentive rests on memory and favour.
  • A thick staff handbook copied from a large company. Write the few rules people ask about, then add as questions arise.
  • A new HR system. A shared sheet shows you which fields you need, and the habit matters before the tool.
  • Elaborate grade titles. Plain role pages come first; grades make sense once you can describe the difference between levels.

A common mistake is to start with whatever annoyed the principal last, such as lateness, and write a strict rule about it. If lateness follows three nights of rendering before a client meeting, the rule treats the wrong problem. Look at allocation and approvals first.

How to tell the basics are working

Ask three people, separately, who owns a particular project, who checks its next issue and what hours the stage has left. Matching answers mean the sheet is alive. Then ask a recent joiner how to request leave. If the answer is to catch the principal in a good mood, that rule still needs writing.

Where to go next

See the wider picture for architects and interior design firms. If you want an outside view of what is missing and what to fix first, GullyHR offers a paid HR audit for growing businesses. The first conversation is free: tell us your requirements.

Questions we are asked

No. A principal and a capable studio manager or admin lead can set up project ownership, written terms, timesheets and leave rules. Give one person responsibility for keeping them current, with protected time each week, because shared responsibility in a busy studio means the records quietly lapse.

Related service

HR for Architects and Interior Design Firms: designers, deadlines, utilisation and freelancers

HR for architects and design firms: designer hiring, project timesheets, utilisation, team allocation, freelancers and performance reviews.

Talk to us about this

Read next

Start with your business need

What does your HR team need to solve?

Tell us your industry, team size and the issue you want to address. Bring one example of where work gets delayed or ownership is unclear, and the deadline or decision you are working towards.

  • A free first conversation with an HR practitioner
  • A clear scope and fee before any paid work
  • A practical next step for your business

Let’s start with your business

Share your contact details and the HR challenge on your mind. We’ll help you find the right starting point.

Include your country code, for example +44 or +1. Indian numbers can be 10 digits.

Your details stay private. Privacy policy