Skip to main content
GullyHR

A monthly people review for architects and interior design firms

A short monthly review for design practice owners covering hours against fee, workload, juniors, freelancers and the action each answer should trigger.

Ganesh HS · · 7 min read

Workplace scene for Architecture Firms: Principals, Drawings and Site Teams

In brief

  • Review a short fixed set of questions on the same day each month, with facts gathered beforehand.
  • Start with hours against fee by stage, then look at who is overloaded or waiting for work.
  • Give every worrying answer an action, one owner and a date.
  • Keep private concerns for one-to-one conversations and out of the group sheet.

At month end a principal learns that the villa interiors job has used its working-drawing hours before the joinery set is half done. The same week, a junior who spent that time redrawing wardrobes asks for a private word. Both signals had been visible for weeks.

In architects & interior design firms: what should the owner check about people each month?

Check six things: hours used against fee on each live stage, workload for the weeks ahead, extra hours and leave, progress of juniors and new joiners, freelancer commitments, and signs that someone is unsettled. For each, read a named record, decide whether action is needed, and give that action an owner and date.

Collect the facts before the meeting

Ask the studio coordinator or admin lead to fill one page a couple of days ahead. The sources are the timesheet, the fee proposal, the allocation sheet, leave records, drawing issue and revision logs, site visit notes, freelancer briefs with invoices, and the dates for probation reviews. Missing data is a finding in itself. Do not spend the meeting reconstructing who worked on what.

Keep the attendance small: the owner, one project lead and whoever prepared the page. Health, family matters, grievances and pay disputes stay out of the shared sheet and go to a private conversation with only the people who need to know.

Six checks and what each one triggers

  1. 1

    Hours against fee

    From timesheets and the proposal, compare hours used with work actually complete on each stage. If hours run ahead, find the cause: client changes, late consultant information, weak briefing or an optimistic fee. Raise a variation, reset the brief, add checking or correct the next estimate.

  2. 2

    Workload ahead

    From the allocation sheet and submission dates, mark who is overloaded and who is waiting over the coming six weeks. Move a package, change a date with the client or book a freelancer early. A silent client is a signal to plan other work for that team now.

  3. 3

    Extra hours and leave

    Look for repeated late evenings, weekend site visits, cancelled leave and leave nobody has taken. If one project or one person keeps appearing, fix the plan or the approval route. Confirm that time owed is recorded and honoured.

  4. 4

    Juniors and joiners

    Ask each lead what a junior did for the first time this month, what still needs checking and which stage comes next. If the answer is more of the same sheets, assign a site visit, a client meeting to observe or a detail to own. Hold probation conversations before their dates.

  5. 5

    Freelancers and consultants

    Match each engagement to a signed brief, delivery date, revision count, file handover and invoice status. Chase overdue payments you owe, close unwritten arrangements and note any freelancer who has become a permanent part of the team, then take advice on it.

  6. 6

    Signs of strain

    Note withdrawal from critique, a rise in drawing errors, clashes between design and site staff, or a once-engaged person asking only about the notice period. These prove nothing alone. Arrange a calm one-to-one, listen, agree one change and return to it.

The one-page sheet

Copy this and change the wording to match your stage names. Mark each line steady, watch or act. Discuss only the last two, and carry open actions to the top of next month's page.

Monthly studio people check
Month:
Prepared by:
Open actions from last month:
Mark: steady / watch / act
1. Hours vs fee by stage:
2. Revision rounds over scope:
3. Overloaded people:
4. People waiting for work:
5. Late evenings and weekends:
6. Leave refused or unused:
7. Junior firsts this month:
8. Probation dates due:
9. Freelance briefs unsigned:
10. Skills held by one person:
11. Private follow-ups booked:
Top three actions:
Owner and date for each:

Read the pattern, not a single month

A submission peak will distort any one page. Compare three months. Overruns that cluster on one fee stage point to pricing or process. Overruns under one lead point to briefing, client handling or support that the lead needs. Overruns on one client call for a commercial decision about scope. A person who is always the cheapest explanation, such as a slow junior, deserves a closer look before you accept it.

Different practices will weight the lines differently. A kitchen studio should read installation delays and snag revisits beside attendance. An engineering consultancy should watch the checker's queue. A visualisation studio should count revision rounds and night rendering. A garden design practice should look ahead to planting windows and the specialists needed for them.

A worked example of one line

Suppose the revision line is marked act on a residential interiors job. The timesheet shows hours building up in design development, the issue log shows repeated kitchen layouts, and the approval email names one family member while another keeps sending changes. Slow drafting is a poor explanation. The action is for the project owner to agree a single approver, confirm the frozen layout in writing and price further changes before work starts. The junior drafter gets a clear instruction to log new requests and pass them on.

Next month, check the result. If changes have stopped or are now billed, mark the line steady. If the owner has not held the client conversation, ask what is in the way. A principal joining that meeting is a better response than adding the same action to the sheet again.

What to leave off the page

  • Individual league tables of billed hours, which invite padded entries and discourage people from helping colleagues.
  • Long lists of measures that no one will act on. Remove a line that has changed nothing across several reviews.
  • Annual appraisal topics squeezed into the meeting. Development and feedback need their own conversation.
  • Design critique. Once the table starts discussing a facade or a finish, the people review has ended.

Finish by choosing no more than three actions. Tell the team what will change, particularly when they supplied the information. If timesheets lead only to questions about slow work, accuracy will fade; if they lead to a renegotiated scope or extra help, people have a reason to record them properly.

Where to go next

Explore related topics for architects and interior design firms. If you want regular feedback and review habits that connect to this page, read about the performance management process, or tell us your requirements.

Questions we are asked

Aim to keep it within an hour, with facts read beforehand. If it overruns, the page is too long or the meeting is solving design and client problems on the spot. Record the issue, name who will take it, and move to the next line.

Related service

HR for Architects and Interior Design Firms: designers, deadlines, utilisation and freelancers

HR for architects and design firms: designer hiring, project timesheets, utilisation, team allocation, freelancers and performance reviews.

Talk to us about this

Read next

Start with your business need

What does your HR team need to solve?

Tell us your industry, team size and the issue you want to address. Bring one example of where work gets delayed or ownership is unclear, and the deadline or decision you are working towards.

  • A free first conversation with an HR practitioner
  • A clear scope and fee before any paid work
  • A practical next step for your business

Let’s start with your business

Share your contact details and the HR challenge on your mind. We’ll help you find the right starting point.

Include your country code, for example +44 or +1. Indian numbers can be 10 digits.

Your details stay private. Privacy policy