Skip to main content
GullyHR

What a facility management and housekeeping firm should set up first in HR

What to set up first in a facility or housekeeping firm: site register, joining files, attendance, standby cover, site wages and supervisor duties.

Ganesh HS · · 7 min read

Cleaning supervisor briefing a team at a client building

In brief

  • Start with a register of every site, its shifts, its headcount and the person who runs it.
  • Attendance by site and a named standby list come before any policy document.
  • Write down what each worker is paid at each site, including extra shifts and moves.
  • Appraisal forms, a thick handbook and large software projects can wait until the daily records hold.

Picture a quarter to seven on a Monday. A floor attendant at an office tower has not arrived, the area coordinator is ringing round, and nobody can say which reliever worked there last week or what rate was agreed for covering. The client's reception staff arrive in two hours.

In facility management & housekeeping: what should the owner set up first in HR?

Set up, in this order, a register of sites, a joining file for every worker, daily attendance by site, a standby routine for absence, written wage terms and a simple set of supervisor duties. Each one feeds the next, so a gap early on turns into wrong pay or an empty post later.

The order matters because your business is built from sites. A worker exists in your records as someone who turns up at a particular building, at a particular hour, to a particular standard, for a rate that depends on that client. Start anywhere else and you end up with tidy files that cannot answer the question your coordinator is asking at seven in the morning.

The six pieces, in order

  1. 1

    List every site

    For each client building, record shift timings, posts by role, uniform, entry pass rules, areas needing special care, the supervisor in charge and the client contact who signs off attendance.

  2. 2

    Open one file per worker

    Hold identity and address proof as local rules require, bank details, emergency contact, uniform and shoe size, the date of joining, the sites they are trained for and the terms they accepted.

  3. 3

    Fix one way to mark attendance

    Register, phone check-in or device at the gate: pick what your supervisors will really use. The supervisor closes each shift the same day and names the post that stayed empty.

  4. 4

    Build the standby routine

    Keep relievers listed with the sites they can reach and the work they know. Set a call order and say who may move someone between sites without waiting for approval.

  5. 5

    Write the wage terms

    Show base pay, site allowances, night and rest-day rules, extra shift rates and any deduction, in the language the worker reads. A move to another site should state which rate applies.

  6. 6

    Give supervisors a short duty sheet

    Cover shift opening, attendance close, material issue, complaint logging, safety checks and what to pass up to the coordinator.

Why the first week at a new site is the test

Mobilising a contract shows which pieces are missing. Workers arrive from different places, the client expects a clean lobby on the first morning, uniforms may be the wrong size and the gate may not have the names. A mobilisation coordinator who holds a site sheet, a checked list of joiners and a standby order can solve these in minutes. Without them the founder spends the week at the gate.

Write a short handover from sales to operations before each start. It should state the posts the client is paying for, the timings promised, the materials and machines included, any health or identity checks the client requires and the date wages begin. Differences between the sold headcount and the working headcount are far cheaper to settle before anyone is hired.

A site sheet to start with

One page per site is enough to begin. Fill it in at mobilisation, keep a copy with the supervisor and update it when the client changes timings or headcount.

Site sheet
Client and building:
Supervisor:
Client sign-off contact:
Shift one: time / posts
Shift two: time / posts
Night: time / posts
Special areas:
Pass or gate rules:
Rate basis for this site:
Standby names:
Call order:
Last updated:

Decide who may decide what

Supervisors work alone, so spell out their limits. They can reasonably allocate areas, approve a swap between two trained people and call the first standby name. Hiring terms, advances, a new rate, a written warning and ending someone's work should sit with a named person at the office. Give a second contact for nights and rest days, because absence does not wait for office hours.

Add one complaint route that does not pass through the supervisor, such as a phone number answered by the office. Cleaners and attendants who have a problem with the person running their site need somewhere else to go, including for reports of harassment by client staff or visitors.

Where new firms go wrong

The first mistake is letting each supervisor keep records in a personal notebook or phone chat. It works while the founder can ring everyone. When a supervisor leaves, the attendance history, the promised rates and the list of reliable relievers leave too.

The second is treating a site move as an informal favour. A pantry attendant sent to cover a hospital corridor may need different training, different protective equipment and a different rate. Record the move, check the person is cleared for that area and state the pay before the shift starts.

The third is closing wages from memory. Reconcile attendance with the client's signed record while the month is still fresh, and settle disagreements before pay is calculated. A worker who finds a shift missing from their wages will tell everyone on the site.

What can wait

  • A formal appraisal cycle. A short monthly conversation with each supervisor does more at this stage.
  • A long employee handbook. Begin with two pages covering attendance, leave, conduct on client premises, safety and how to complain.
  • Elaborate software. Move to a system once your site register and attendance habit are steady, because a tool copies whatever discipline already exists.
  • Engagement events. Paying correctly, issuing uniforms on time and answering questions earn more goodwill.

When these basics are in place, our guide to an attendance, shift and leave process shows how to firm up the rules around swaps, extra shifts and rest days.

How to tell it is working

Ask three questions on any morning. Which posts are empty right now? Who is covering each, and at what rate? Could a new coordinator find both answers without phoning the founder? If the answer to the last one is no, find which record is missing and repair that piece before adding another.

Where to go next

Read how this applies across facility management and housekeeping. If you want an outside view of your current records before changing them, a paid HR audit shows which gaps to close first. To start a conversation, tell us your requirements.

Questions we are asked

Not necessarily. A consistent site sheet, one attendance method and a single wage record matter more than the tool. Choose software when manual consolidation delays your month end or when coordinators cannot see empty posts across sites on the same morning.

Related service

HR for Facility Management and Housekeeping: client-site attendance, shift cover, worker replacement and supervisors

HR for facility management and housekeeping firms: client-site attendance, shift allocation, worker replacement, supervisor approvals and site-wise wages.

Talk to us about this

Read next

Start with your business need

What does your HR team need to solve?

Tell us your industry, team size and the issue you want to address. Bring one example of where work gets delayed or ownership is unclear, and the deadline or decision you are working towards.

  • A free first conversation with an HR practitioner
  • A clear scope and fee before any paid work
  • A practical next step for your business

Let’s start with your business

Share your contact details and the HR challenge on your mind. We’ll help you find the right starting point.

Include your country code, for example +44 or +1. Indian numbers can be 10 digits.

Your details stay private. Privacy policy