Skip to main content
GullyHR

Only one engineer knows that package or code section: HR for engineering consultancies

How an engineering consultancy builds a second person for critical software and code knowledge, without waiting for a quiet year.

Ganesh HS · · 7 min read

Professional services colleagues discussing associate workload and progression around a meeting table

In brief

  • List the packages, code sections and client standards that only one engineer can handle.
  • Train a named second person on live project work, with a reviewer signing off.
  • Protect checking days and hold a monthly technical hour so code changes reach everyone.
  • A training catalogue and learning software can wait until cover exists for critical work.

A structural submission is due on Friday, and the only engineer who understands the firm's finite element model is off sick. The discipline lead opens the file, finds assumptions nobody wrote down, and spends two evenings reconstructing them. The client hears that the issue date has moved.

Who covers the model when its author is away?

Pick the few pieces of knowledge that would stop an issue, name one learner for each, and have that person do real project tasks on them while the current expert checks. Book the hours in the project plan. Count the cover as real only when the learner has produced work that passed review without rescue.

Find the single points first

Do not start with a training wish list. Start with the last year of deliverables and ask each discipline lead where work waited for one name. The answers in civil, structural and MEP teams differ, but they fall into a few kinds.

  • A design or analysis package that one engineer set up and everyone else avoids.
  • A code section such as fire, seismic or foundation design that is always passed to the same desk.
  • A client or authority submission format learned through years of rejected drawings.
  • The coordination model, templates and clash rules held by one BIM modeller.
  • Site history on a live job that only the resident engineer remembers.

Score each by two plain questions: would a deadline be missed if this person were away for a fortnight, and how long would a capable colleague need to take over? Work on the entries where the first answer is yes and the second is long. Leave the rest on the list for later.

The cover map a discipline lead can keep

Second-person cover map
Discipline:
Skill, package or code part:
Current holder:
Learner named:
Project used for practice:
Tasks learner does first:
Reviewer for learner's work:
Hours booked per week:
Notes written and saved at:
Solo task passed on (date):
Next review date:

Keep one sheet per item and review the set at the monthly meeting of principals and leads. A sheet with no booked hours is a hope, not a plan.

Teach through the project, in stages

  1. 1

    Capture the assumptions

    Ask the holder to write a short basis note for one live model or calculation: inputs, simplifications, checks run and known traps. Save it with the project files, not on a personal drive.

  2. 2

    Let the learner watch and question

    Pair them for a defined task, such as a load case revision. The learner records each decision and why it was taken.

  3. 3

    Swap the seats

    The learner does the next similar task while the holder sits as reviewer and resists taking the keyboard.

  4. 4

    Test under normal pressure

    Give the learner a package inside a real issue cycle, with the usual checker. Review comments show the remaining gaps.

  5. 5

    Rotate the next item

    Once solo work passes, move the pair's booked hours to the following entry on the cover map.

Experts resist this when it feels like being replaced. Say plainly that carrying a second person is part of senior work, credit it at review time, and give the holder something worth doing with the time it frees, whether that is checking harder problems or leading a new service.

Where do the hours come from?

Fees arrive at stage milestones, and the weeks before a drawing issue leave no room. Plan learning around that shape. Use the approval waits for basis notes and practice tasks, and schedule lighter pairing during crunches. Ask project coordinators to show learning hours on the resource plan next to billable ones, so a lead has to decide openly before removing them.

Protect checking days the same way. A review squeezed into the final evening teaches the designer nothing and lets errors reach site. Fix a review slot in each programme, and have the checker spend part of it explaining the two or three comments that matter.

Second job: stop code updates arriving by chance

Give each standard your firm relies on an owner who watches for revisions. At a monthly technical hour, that owner explains what changed, which live projects are affected and what happens to templates and calculation sheets. Record the decision on transition dates for each job. Resident engineers should join remotely or receive the note, and bring back one site lesson for the same session.

Third job: show a technical route upward

Engineers share knowledge more readily when depth is rewarded. Describe a technical grade with its own expectations: owning standards, reviewing difficult designs, teaching a second person and advising on bids. Place it alongside the management grade, so a strong checker is not forced to run a team to progress. The Learning and Development Process page sets out how training needs, plans and evidence of skill fit together.

Treat the resident engineer as a source, not an afterthought

Site knowledge disappears faster than office knowledge. Agree a short weekly note from each resident engineer covering queries raised by the contractor, details that proved hard to build and decisions taken verbally. Name a design engineer to read it, reply and update the standard detail or checklist where needed. Once in each major stage, bring that designer to site. The visit gives the resident engineer a colleague who understands the pressure, and gives the designer a lesson no drawing review supplies. Both belong on the cover map when only one person knows the history of a live job.

Before a resident engineer rotates off, book overlap with the successor. Walk the open queries, the disputed items and the people who need a call. Treat that handover as project work with its own hours.

What can wait

A long course catalogue, a learning platform and a skills rating for every engineer on every task will absorb effort without reducing this week's risk. External courses help when they close a named gap, so book them against a cover map entry. Soft skills programmes have their place for resident engineers and leads, but not before the critical models have a second reader.

Signs the cover is holding

Ask at each monthly meeting whether any issue waited for one person, whether the learner completed the booked task and whether the basis note was updated after the last revision. A leave request from a key engineer should lead to a calm handover, not a negotiation. If the same name still answers every query, check whether colleagues are being sent to the learner first.

Where to go next

Fill in three cover sheets with your discipline leads this week. For the broader view of roles and pressures in the sector, read HR for engineering consultancies. If you would like help designing the learning process around your project calendar, send us your requirement. The first conversation is free.

Questions we are asked

Start with one item, the one that would stop the nearest issue. Ask for a short written basis note first, because it takes the least time and helps immediately. Book pairing hours for the next approval wait and show them on the resource plan.

Related service

HR for Engineering Consultancies: Designers, Checkers and Site Engineers

HR for engineering consultancies: design and checking teams, site supervision, project peaks, chartered-engineer progression and retaining specialists.

Talk to us about this

Read next

Start with your business need

What does your HR team need to solve?

Tell us your industry, team size and the issue you want to address. Bring one example of where work gets delayed or ownership is unclear, and the deadline or decision you are working towards.

  • A free first conversation with an HR practitioner
  • A clear scope and fee before any paid work
  • A practical next step for your business

Let’s start with your business

Share your contact details and the HR challenge on your mind. We’ll help you find the right starting point.

Include your country code, for example +44 or +1. Indian numbers can be 10 digits.

Your details stay private. Privacy policy