A factory's safety officer stops your technician at the substation door and asks to see authority for the work. The technician has years on the tools, but your office has only a photocopy of a licence in an old tender folder, and nobody can say when it runs out. The shutdown window is ticking while someone searches their phone.
What should an electrical contractor record before sending someone to site?
Record, for each person, the licences or permits they hold with expiry dates, the tasks a competent senior has watched them carry out safely, the voltage and equipment limits that apply, and who authorised them. Keep it in one place that supervisors can read from site, and check it before names go on the job.
A licence shows that an authority once found someone qualified for a class of work. It says little about whether that person has racked out your customer's breaker, tested a changeover panel or worked in a riser shaft. Your record has to hold both, and keep them apart.
Build the authority record first
Begin with the people who work alone or lead a crew: licensed electricians, maintenance technicians and supervisors. Ask each to bring originals. Note the class of licence, the number, the expiry and what it permits. Then ask the senior engineer to mark the tasks that engineer has personally watched. Blank spaces are the useful part. Do not fill them from reputation.
Name and role:
Licence class and number:
Expires on:
Other permits and expiry:
TASK (A=alone S=watched N=no)
Isolate and lock off:
Prove dead with tester:
Terminate cable and glands:
Insulation and earth testing:
Fault-finding on panels:
Work at height / shaft entry:
Client permit receiver:
Seen by (senior) and date:
Limits to note:
Next review date:Hang one rule on the record: no one is allocated to a task marked supervised or no unless the named supervisor is on the same site. The person who assigns jobs needs to see the record at the moment of assigning, so a shared sheet beats a locked file in the accounts room.
Use the record at allocation, not after an audit
Take an ordinary morning: a lighting fit-out, a switchboard shutdown at a hospital and an urgent fault call at a plant. The scheduler should be able to see that the shutdown needs a person marked alone for isolation and proving dead, named as permit receiver for that client, with a second person on site. If only one person on the books qualifies, the owner has found a gap in cover before the customer does.
Agree who may overrule the record. The sensible answer for energised or high-voltage work is nobody by telephone. A senior engineer who wants to widen someone's tasks should attend, watch, sign and date it. For subcontracted electricians and hired hands, ask for the same originals and record the same blanks, since the customer sees them as your crew.
Give helpers a ladder with signatures on it
Helpers and apprentices learn by standing next to whoever is free. One mentor lets them terminate sockets; another will not let them hold the tester. Replace that with a short ladder of stages, each signed by a senior who watched the work.
- 1
Carry and prepare
Site induction, personal protective equipment, ladder checks, cable pulling and conduit work on circuits that have never been energised. No work inside any panel.
- 2
Wire under watch
Terminations and accessory fitting on dead circuits, with the supervising electrician proving dead and the helper watching and repeating the method aloud.
- 3
Test under watch
Continuity, insulation and earth readings taken by the helper, with results checked and countersigned. The helper learns when a reading means stop.
- 4
Named solo tasks
A written list of low-risk jobs the helper may do alone, only where licensing rules permit it, reviewed at each stage and withdrawn if shortcuts appear.
Make isolation and proving dead a stop point
Lock-off, testing the tester, proving dead and wearing the right gloves are known by everyone and skipped when the client is impatient. Write the sequence on one card. State that any person may stop a job when a step is missing, and that the supervisor who is told so thanks them in front of the crew. Provide locks, tags and working testers in each kit, because a rule without equipment teaches people to ignore it.
Then check it. A supervisor or director visits a job start unannounced and watches the first ten minutes. Record what was done, what was skipped and why. The reason matters: a missing lock is a purchasing fault, a shared tester is a stores fault, and a rushed start is a planning fault. Treat near misses the same way, with a short report on the day and no blame for filing it.
Then protect the maintenance rounds
When an installation falls behind, the nearest source of skill is the maintenance team, and the factory or hospital customer notices the missed visit. Put contracted rounds into the schedule before project work is allocated. Name who may release a maintenance technician to a project, and require that a replacement date is agreed with the customer first. Tired technicians borrowed for a night shift on one site and a morning round on another are also a safety matter.
Issue testers and cable against a name
- Give each insulation tester, clamp meter and voltage tester a number and a holder
- Log calibration and proving-unit checks beside that number
- Record cable drums out and returned, with the site and the person signing
- Quarantine any damaged instrument the day it is reported, with a spare ready
Pay schedules, appraisal forms and staff software can follow. So can a long handbook. None of them tells a supervisor on a Saturday whether the person in front of the board is allowed to open it. A paper or spreadsheet record, reviewed at a monthly meeting between the owner, the senior engineer and the scheduler, will show expiring licences and stalled helpers early enough to act.
That record also changes the conversation with skilled people. An electrician who can see the next stage, and who is named as the trainer for helpers with time set aside for it, has a reason to stay that goes beyond the daily rate. It will not stop everyone who wants to set up alone, so keep customer contacts, drawings and test results in the firm's files.
Where to go next
This week, pick one crew and complete the record for each member, leaving unknowns blank. Read more on HR for electrical contractors and on safety induction, training records and incident reporting. To have the records and ladder built with you, share your requirements.