Skip to main content
GullyHR

Water infrastructure contractors · Role design and job descriptions

Role design and job descriptions for Water infrastructure contractors: supervisors, gang leaders and plant technicians

On a pipeline job the supervisor, the gang leader and the engineer all give orders. Written roles settle who decides what, and keep plant technicians from being managed like diggers.

Construction supervisors and an HR coordinator reviewing crew deployment in a site office

Not sure what you need? Tell us about your business in six short steps and we will come to the first meeting prepared.

Share your requirements

Why role design and job descriptions matters in water infrastructure contractors

A pipeline project grows around people. The site engineer plans, the supervisor runs the day, the mestri controls his gang and the billing clerk waits for quantities. Nobody has a written list of what each may decide. A gang leader orders extra pipe, a supervisor moves workers to another stretch and the engineer finds out afterwards. Plant technicians who test pumps are lumped with the same supervisors although their work is entirely different.

Role design is a plain exercise. For each role on the project, write the purpose, the daily duties, who they report to, what they may decide and what they must refer upwards. It is not meant to create paperwork. It is meant to reduce arguments, make hiring easier and give people something to grow into.

How to set it up

  1. 1. List the roles on a typical project

    Write down every role from the project head to the pipe layer, including gang leaders and commissioning staff. Mark overlaps and gaps, such as two people checking quantities or no one checking safety.

  2. 2. Describe each in one page

    Purpose, duties, reporting line, decisions allowed and decisions to be referred. Use plain words and examples from the route, such as who may move a gang or order extra material.

  3. 3. Separate route work from plant work

    Write different roles for supervisors on the route and technicians in plant commissioning, with their own skills, tools and handover steps.

  4. 4. Agree gang leader terms in writing

    Say what a leader is responsible for, how his people are recorded and how disputes are raised. Respect his place, and keep records of the people under him.

  5. 5. Use the roles in hiring and review

    Take the descriptions into interviews and appraisals. After the first project, correct them with what the team learnt. The manager development programme can use them as a base.

Check these first

Before changing anything, find out what is true today. These take an afternoon and use your own records.

  • Ask a supervisor and an engineer separately who decides to move a gang, and compare answers.
  • Read your current job descriptions and check whether any mention gang leaders or commissioning.
  • List decisions made on the last project that were later reversed.
  • Ask a plant technician how his role differs from that of a route supervisor.

GullyHR can do this with you. Read how we approach role design and job descriptions in general, or share your requirements and we will tell you where to start.

Questions owners ask

Because new people join all the time and projects repeat. A written role is quicker to explain, easier to hire against and reduces arguments over who decides. You can reuse it on the next project.

Your next chapter

Let’s make HR work better.

Tell us what is slowing your team down. We’ll help you find a practical way forward, starting with a conversation.

  • A free first conversation with an HR practitioner
  • A clear scope and fee before any paid work
  • A practical next step for your business

Let’s start with your business

Share your contact details and the HR challenge on your mind. We’ll help you find the right starting point.

10-digit Indian mobile, without +91.

Your details stay private. Privacy policy