The sales head of a third party logistics company signs a new client on a Thursday, and operations hears the go-live date the following Monday. By the first week of live orders the shift manager is picking alongside new starters, the inventory controller is covering two accounts, and the client account manager is explaining mis-picks on a call.
What should a 3PL set up first for a new client start-up?
Set up a one-page staffing sheet that is completed before the contract is signed. It states the roles by shift, who is moving across from existing accounts, who must be hired, what each person must show before touching live orders, and who owns each line. Hiring, training and rostering all follow from that sheet.
The trouble starts when the client proposal describes volumes, service levels and a go-live date, while the people behind those figures sit in someone's head. HR for third party logistics companies covers the wider picture. This article stays with the start-up, because a weak one shows up as penalties, tired supervisors and an existing client whose service slips because the best people were borrowed.
Order of work, from tender to steady running
- 1
Translate the contract into shifts
Take the expected order profile, cut-off times, receiving windows and returns flow, and write down who is needed on each shift in the peak week and in an ordinary week. Include the client's system access and any special handling such as batch, expiry or serial capture.
- 2
Name the anchor roles
Decide who will be shift manager, inventory controller, dispatch coordinator and trainer for the account, and which equipment operators it needs. These people shape how everyone else works, so settle them before the picking and packing crew. If an anchor moves from a live account, name the replacement on that account too.
- 3
Split the rest by source
For each remaining place, mark internal transfer, returning worker, vendor worker or new hire. Give every line a person responsible and a latest date for a decision. A vendor request that says only a headcount will bring a headcount, so state the tasks, shift timings and training days required.
- 4
Set the training gates
Define what a worker must show, watched by a named person, before moving from classroom to shadowing, from shadowing to supervised live orders, and from there to working alone.
- 5
Hold a daily start-up huddle
For the opening weeks, spend a short slot each day on attendance, gate progress, error types and who is stretched. Decide on moves there, while the facts are fresh.
The sheet to complete before the go-live date is agreed
Keep it short enough that the sales head will read it. If a line cannot be filled, that is the conversation to have with the client now, whether about a phased start, a later date or fewer product lines in the first wave.
Client:
Go-live date:
Peak week and why:
ANCHOR ROLES (name each)
Shift manager:
Inventory controller:
Dispatch coordinator:
Floor trainer:
Lift truck operators:
Cover on donor account:
CREW BY SHIFT
Shift | Task | Places
Internal transfers:
Returning workers:
Vendor workers:
New hires:
TRAINING GATES
Safety walk passed:
Scan process observed:
Client rules checked:
Cleared to work alone:
Decision owner:
Latest date to change plan:Where start-ups go wrong
- The strongest people are lifted from a stable account with no cover, and that client starts missing cut-offs while everyone watches the new one.
- Vendor workers arrive on the first live day, attend a talk and go straight to the pick face. Put their training days into the vendor order and the budget.
- Training happens on a quiet floor with clean stock, so nobody has practised short picks, damaged cartons or a system that rejects a scan. Rehearse the exceptions.
- Speed targets apply from the first shift. New starters learn to skip the check scan, and the habit stays after the start-up ends. Give accuracy a gate before pace gets a target.
- Penalties arrive and the supervisor passes them down as blame. Ask what in the process, layout or training allowed the error, then fix that.
Second: a process card for every client
Once the start-up has a shape, tackle the confusion that follows when one worker serves several clients. Write a card for each account covering what differs from the site standard: labels, packing material, batch or expiry rules, photographs required, cut-off times and who to call. Use pictures of the right and wrong carton. Put the card at the station, give it an owner and date each change.
When a client changes a rule, the shift teams hear it at handover from the card owner, and the old card is removed. A rule that lives only in an account manager's inbox will be broken on the night shift.
Third: decide what happens when a contract ends
Keep a simple list of floor and support staff showing which client rules, systems and equipment each has been cleared on. When notice arrives, that list shows who can move where and what top-up training they need. Tell the affected team early what is known, what is not yet decided and when they will next hear. Trust on a shared site depends heavily on how the last exit was handled, and vendor workers are watching too.
The same list helps the next start-up, because internal transfers become a known pool. If hiring itself is the weak link, look at your workforce and recruitment process: who raises a vacancy, what the role needs, how candidates are assessed and how long each stage waits.
What can wait
A detailed grading structure, an annual appraisal redesign and new HR software can all follow. So can a long competency dictionary. During a start-up the floor needs a named owner for each line, a few observed gates and a daily decision slot. Review the sheet after the account settles, note where the plan and the floor differed, and use that note on the next tender.
Where to go next
Take your last client start-up and fill the sheet in backwards: who was missing, which gate was skipped and how long the floor took to reach target. If you would like a second pair of eyes on the plan or the hiring steps behind it, tell us your requirements.