Most plants already run an induction. The trouble is that it often lives in a classroom on day one and then stops. By Wednesday the new operator is lifting granulation bags in a corridor, copying whoever stands nearest. What follows is a printable sheet that carries the induction past the classroom door and through all five days.
It suits a tablet, capsule, API or nutraceutical unit with small edits. Swap the room names for your own and keep the order. The order matters more than the wording.
The sheet itself
Name, employee code, block or room, joining date, buddy's name, shift officer's name.
DAY 1. Gate pass issued and personal locker allotted. Signed by: HR.
DAY 1. Change room walk: footwear swap at the step-over bench, primary and secondary change, hand wash, then the mirror check. Signed by: buddy.
DAY 1. Airlock rules shown at the door: one door open at a time, wait for the interlock, never prop it, glance at the differential pressure gauge. Signed by: buddy.
DAY 1. Gowning done three times while the buddy watches: bouffant cap, mask, overshoes, gloves pulled over the cuffs, goggles last,, and once unwatched with a check after. Signed by: shift officer.
DAY 2. Ink rules: blue or black pen only, no pencil, no correction fluid, no writing ahead of the step. Signed by: shift officer.
DAY 2. How to correct an entry: one line through, the new value beside it, initials, date, reason. Practised on a dummy logbook page. Signed by: shift officer.
DAY 2. Equipment logbook and area log shown for the room the joiner will work in. Signed by: buddy.
DAY 3. Status labels read aloud at three machines: cleaned, to be cleaned, under maintenance, in use with product name. Signed by: buddy.
DAY 3. Watches one full line clearance and one dispensing session from outside the booth. Signed by: shift officer.
DAY 3. Material movement: which pass box, which trolley, which route between the sifter, the rapid mixer granulator and the blender rooms. Signed by: buddy.
DAY 4. Read-and-understood training on the room procedures, with a short spoken quiz beside the equipment. Signed by: trainer or QA.
DAY 4. Spill, breakage and alarm drill: who to call, where the spill kit sits, what not to clean alone. Signed by: shift officer.
DAY 5. Supervised task on the actual machine, logbook entry written by the joiner and checked by the buddy. Signed by: buddy.
DAY 5. Friday talk: what felt unclear, what the joiner saw others do differently, which tasks stay off-limits next week. Signed by: shift officer and joiner.
Not yet cleared to work alone on: list the machines and steps here.Monday to Friday with the sheet
- 1
Print it before the joiner arrives
HR fills the top line and passes the page to the shift officer on the morning of joining. A blank sheet found on Thursday has already failed.
- 2
Sign at the place and on the day
Each line is signed at the bench, airlock or machine where it happened. If a line slips to the next day, the date beside it shows that honestly.
- 3
Let the joiner hold a copy
A photocopy in the locker lets the new operator see what comes tomorrow and ask about it. Beginners settle quicker once tomorrow's lines are visible.
- 4
Hold the Friday talk standing at the line
Ten minutes beside the granulator or blister machine beats half an hour in an office. The joiner points at what confused them, which is far more useful than a general question.
- 5
File the original the same week
It goes into the personal training file, next to the joining papers. Our page on joining checklists shows how the HR side of that file is laid out.
Why ink rules come on day two, not day ten
A joiner writes their first logbook line far sooner than most supervisors expect. Often it is a cleaning entry or a room temperature reading on day two or three. Whatever method they use for that first line becomes their method. If no one ever demonstrated striking through a wrong figure, they will overwrite it or scratch it out.
Plants that study their documentation slips usually find the same root: the person was never taught, only told. The post on paperwork errors and training goes deeper into that pattern. The dummy logbook page on day two costs nothing and heads off months of corrections.
Who signs which line
- The buddy signs most lines, because the buddy is beside the joiner all week.
- The shift officer signs the gowning, ink and Friday lines, since those habits form early and harden fast.
- QA or the trainer signs the read-and-understood line and keeps the quiz questions current when a procedure changes.
- HR checks every open sheet on Friday afternoon and chases any line left blank.
- The sheet is used once per joiner, and again when anyone moves to a new block or room, using only the room lines.
Picking a buddy
Steady beats senior here. A fast operator who skips the mirror check will teach that skip. Pick someone whose own gowning and entries the shift officer trusts, and lighten their target for the week. Shadowing eats time, and a buddy chasing output will cut it short.
Name the same buddy for all five days where the roster allows. Splitting the week between two people leaves gaps that neither notices. If the buddy is moved to another shift, the shift officer passes the sheet on before the following shift clocks in.
Off-limits for a joiner in week one
- Dispense or weigh any material, even when the booth is quiet.
- Sign as the checker on any entry, including cleaning.
- Start, stop or change settings on a machine without the buddy at the panel.
- Clean up a spill of active material or a broken glass item.
- Move a container out of a room without checking its label with someone.
After week one
The sheet closes the first week, not the induction. Weeks two to six move into machine training and sign-off, which the onboarding guide for pharma floors covers. Tablet and capsule plants may set their room lists beside the tablet joiner pages, as well as the capsule joiner pages. Other strains in this group, from poached analysts to fading gowning habits, are mapped on the pharma plant hub.
To have the sheet reworked around your own rooms and procedures, send us the plant details through the requirements wizard.



