In many component plants a new operator spends the first morning waiting at the security cabin and the first afternoon beside a machine, watching someone who never said hello. By Saturday he knows where the canteen is and little else. A few never come back after the first salary. Others stay and copy whatever the nearest operator does, good or bad.
A written first week fixes both. The sheet below fits one printed page and is filled by hand at the station, not typed up afterwards. It works for heading shops, grinding bays, hobbing lines, coiling sections, valve assembly and cylinder plants alike, the trades covered on our component makers' overview. Rename the machines to match your own sections.
The one-page sheet
Recruit's name and code, section, shift, date joined, buddy, supervisor.
Before arrival: safety shoes and gloves in the right size, ear plugs or muffs, goggles.
Before arrival: leather apron and face shield as well, if the section has a furnace, quench tank or plating bath.
Before arrival: shift timing, bus pick-up point, canteen card, locker key, ID card and gate pass ready.
Before arrival: matrix row opened at letter I for the first machine family.
Day 1: safety walk with the supervisor, covering guards, mushroom stop buttons, extinguishers, the first aid box, eye wash and the near-miss book.
Day 1: follow a part from the raw material yard to the despatch bay; see the red bin, the hold cage and the rework bench.
Day 1: told who may halt a machine and how to reach the shift lead.
Day 2: measuring with quality, covering vernier, micrometer, plug gauge, thread ring gauge and how to read the gauge card at the machine.
Day 2: read a lot tag and match it to the drawing number; practise tagging a suspect bin.
Day 3: load and unload the first machine beside the buddy; clear chips with a hook, never a hand.
Day 3: watch a first-off approval; write one patrol reading on the sheet.
Day 4: run under watch for part of the shift; stop on a planted bad piece and tag it.
Day 4: size-change clear-down, with chute, bins and trays emptied and checked.
Day 5: supervised production run with patrol readings written by the recruit.
Day 5: housekeeping and end-of-shift handover to the next operator.
Day 6: review with supervisor, buddy and HR; the recruit's questions answered.
Day 6: target week for letter L agreed; signatures of recruit, buddy and supervisor.Extra lines by section
- Cold heading and thread rolling: coil cradle and straightener hazards, hearing protection worn throughout, how a mixed size is cleared from the chute.
- Heat treatment: furnace door drill, quench oil fire risk, hot trays and baskets marked, never reaching across a conveyor belt.
- Plating and coating: acid and alkali splashes, eye wash location rehearsed, gauntlets and apron before entering the bath area.
- Grinding and honing: wheel guard and dressing rules, coolant mist, why nobody stands in line with a wheel at start-up.
- Hydro and leak test benches: shield closed before pressurising, bleeding air, never loosening a fitting under pressure.
- Assembly: seal picks and grease, O-ring handling, keeping a cylinder bore covered once cleaned.
Add the relevant block to the day-one and day-three lines. A recruit for the plating line and one for the heading shop should not leave the first week with the same safety knowledge.
Measuring before machining
Repeat-batch work rarely fails on one bad part. It fails on a whole bin of them, made quietly while nobody checked. A recruit who can use a thread ring gauge or a micrometer on day two can warn the buddy something is off long before he could fix it. Putting gauges first also tells the newcomer what the plant values. Output comes later. Checking comes first.
Who signs which lines
- Time office: the before-arrival lines, closed the day before joining.
- Supervisor: the safety walk, the part-flow walk and the day-six review.
- Buddy: machine lines from day three to day five, initialled at each shift end.
- Quality: the day-two measuring lines, with a quick check that each gauge is read correctly.
- Recruit: signs at the day-six review and keeps a photocopy.
Picking the buddy
Choose a U-letter hand from the same machine family, patient by nature, rostered alongside the recruit for all six days. Avoid the section's star setter. He is pulled away constantly and tends to teach shortcuts. Pay the buddy a small allowance or write the role into his grade card, so teaching counts for something. Swap the buddy if the pair have not settled by day three.
Keeping the sheet in use
- 1
Keep a printed pad with the supervisor
Sheets stored in the HR office get completed from memory. Sheets kept in the section get completed at the machine.
- 2
File each signed sheet in the personnel file
It opens the person's training history.
- 3
Look through the sheets every quarter
Lines that are always skipped show where the plan does not match the floor.
- 4
Ask leavers about their first week
One question in the exit conversation shows whether the sheet was followed or merely signed.
After day six
The sheet ends on a plan, not a finish line. Next comes the move from I to L on the I-L-U-O grid. Keep a weekly word with the buddy through the first month, and a short talk with HR after the first salary, when many newcomers decide whether to return. Sections with long learning curves, such as honing and seal fitting, can borrow the staged route on the hydraulic makers' learning page. Office and floor roles together are covered by our general joining list.