A new operator rarely crashes a machine on day one. The costly mistakes come on day three or four. By then the person feels confident, nudges a work-offset, loads a worn insert and presses cycle start without a dry-run. A good first week stops that curve before it bends. It is a sheet, taped inside the supervisor's drawer, that says what the newcomer sees, does and signs on each day.
This post gives that sheet in full, then explains who fills it and how it is used. It suits turning, milling and VMC floors in the group on the CNC machining and precision engineering hub. It assumes the person can read a drawing and use a micrometer. Swap in the machine names from your own floor.
The one-page sheet
Name, token number, machine allotted, buddy named.
Day 1: gate pass, canteen, PPE issue, safety walk, door interlock and chip-conveyor guard demonstration.
Day 1: how to find the job-card, drawing-revision and setup-sheet for a part.
Day 2: sit beside the buddy through one full cycle. Write down the tool list and offsets.
Day 2: gauge handling. Vernier, micrometer, bore-gauge, ring-gauge and go and no-go plug-gauge, with calibration tag check.
Day 3: load and unload under supervision. Dry-run, single-block, feed-override.
Day 3: first-off inspection explained. Who signs, where it is recorded, and how a scrap-note or rejection-note is raised.
Day 4: run ten parts with the buddy standing by. Measure each with the height-gauge or dial-indicator and record it.
Day 5: swarf, coolant and chip conveyor housekeeping. Handover note practice.
Day 5: review with supervisor: what was easy, what was unclear, which task needs another week.
Sign-off: operator, buddy, supervisor, HR. Date each line.Ownership of each line
- The shift supervisor holds the sheet and fills it before the shift ends.
- The buddy initials a line only after showing the task, never ahead of it.
- The operator signs to say he or she understood.
- HR collects the sheet on Friday and files it in the joining record.
A sheet that stays in a drawer does nothing. Review it on Friday, even if that is a short talk beside the machine.
Day by day, with the reasons
- 1
Day 1: the gate and the guards
Shows the person where danger sits before any part is touched. Walk the door interlock, the emergency stop, the chuck guard and the coolant splash zone. Many first injuries are slips on oily floors, so show the swarf bin and the mop routine.
- 2
Day 2: watch a full cycle
The newcomer sees offsets, tool changes and the first-off. Hand over a blank notepad and ask for the tool list. It exposes whether he can read a setup sheet.
- 3
Day 3: hands on, with limits
Allow loading and unloading. Allow dry run and single block. Do not allow edits to offsets or the program. Say it plainly.
- 4
Day 4: ten measured parts
Measuring each part trains the habit of checking the drawing revision against the job card. It also shows drift in a bore or a shoulder length.
- 5
Day 5: the review
Ask what the person would stop doing. A quiet newcomer often reveals that the gauge was not zeroed or that the buddy showed a shortcut.
Know the machine before the part
Each type of machine brings its own first-week lesson. Put it on the sheet as an extra line, so the buddy does not have to remember.
- Turning with a bar-feeder: collet change, bar stock straightness, tailstock pressure and what the sub-spindle hand-off sounds like when it is wrong.
- Turret and live-tooling lathes: tool numbering, parting-off warnings and chipbreaker choice for steel versus aluminium.
- VMC and milling: fixture-plate or vice clamping, T-slot hygiene, touch-probe routine, and why a tool-presetter reading matters more than a guess.
- Five-axis: trunnion and rotary-table limits, plus the rule that only a programmer edits a post-processor or a macro-program.
- Wire EDM: wire-threading, dielectric level, brass-wire spool change and a skim-cut warning.
- Grinding: wheel-balancing, dressing and spark-out, with a clear rule on never touching the wheel guard.
A good buddy also teaches the vocabulary of faults. Runout, concentricity, roundness, cylindricity, chatter marks and burrs are all words a newcomer should hear and see on a real part during the first week, not on a slide.
Adjusting for the floor
In a tool room, add slip-gauges, parallels, the sine-bar and surface-plate handling. Keep every such line as an add-on to the one sheet, not a fresh sheet for each cell. That keeps filing simple for HR.
The VMC machining onboarding page gives a view of what a longer joining process can cover. For the wider design of joining, see the employee onboarding process service, and the joining checklist template for the paperwork side.
If the week goes badly
- If the operator cannot read a setup sheet by day three, extend the buddy period.
- If gauge readings keep differing from the buddy's, retrain on the gauge before anything else.
- If the person skips the dry run, stop and repeat day three.
- If safety rules are broken, record it and have the conversation the same day, not on Friday.


