A modular kitchen is fitted in a third-floor flat on a Saturday. The carcasses are square and the shutters arrived without a scratch. But the installer skips the dust sheet, leaves granite chips in the sink and drives off with two drawer channels still binding. The homeowner never saw the factory. She saw him. Her review says the company is careless.
Installation is where furniture makers are judged, and it happens out of sight. One site lead may cover five flats, a school block and an office floor in the same week. Nobody can stand behind each fitter. The answer is to send the standard with him.
What clients notice
- Arrival time, a call before reaching the society gate, and shoe covers at the door.
- Dust sheets over the floor and hob, and a vacuum at the end, not a broom.
- Shutter gaps that are even, hinges set so doors close quietly, drawers that glide.
- Filler panels scribed to a crooked wall instead of a gap hidden with silicone.
- How the fitter speaks when the countertop is late or a panel does not fit.
- Whether the handover includes a walk round, a care sheet and a name to call.
What poor fitting costs
Every revisit costs a crew day and a vehicle. Clients hold back the final instalment until snags close, which strains cash. Builders and interior designers stop sending work. And the fitter who impressed a family is often asked to do their wardrobe privately next month. Some say yes, and soon set up on their own with your client list.
Why more supervision is not the answer
Sites are spread across a city and installation days are long. Fitters are usually trained on tools, not on conduct. Many begin as helpers and learn by copying whoever they were sent with, habits included. Pay is often per kitchen or per workstation run, which rewards a fast exit over a clean finish. And the factory rarely writes down what a finished site should look like, so each crew invents its own standard.
The fix in six steps
- 1
Check first: sort the recent call-backs
Take the past quarter and mark each as a factory fault, a measurement fault, a fitting fault or a conduct complaint. The mix tells you where to begin.
- 2
Issue a job card for every site
One sheet listing the address, contact, items, drawing revision, special notes and the finish checks. The fitter carries it and the client signs it.
- 3
Start and close with photos
Photos of the site on arrival, the protected floor, and every finished elevation, sent to one office number. It takes minutes and settles many disputes.
- 4
Train a site lead for each crew
Choose a steady fitter and teach him the finish checks, how to brief a homeowner, and how to stay level when a complaint lands. Pay him for the role.
- 5
Give the crew a help number
One person at the factory who answers when a panel is short or a wall is out of plumb, so fitters do not improvise.
- 6
Review a few finished sites each month
Look at the photos and job cards with the crew. Praise the clean ones by name. Walk through one weak site without blame.
What the site lead does on a visit
- Arrives unannounced at one site a day, mid-job, and looks at protection and tidiness first.
- Checks the drawing revision on the job card against what is being fitted.
- Opens every third shutter and drawer, checks gaps, plinth level and edge banding chips.
- Asks the client one question: is anything bothering you so far?
- Notes one thing done well and one to fix, and tells the fitter before leaving.
Order number, client name and phone, site address, floor and lift timing.
Drawing revision and date, signed by the client.
Items: carcasses, shutters, panels, hardware bags, countertop and appliance dates.
Special notes: pipes, sockets, crooked walls, gas point, pets, working hours allowed.
On arrival: photo of site, dust sheets laid, shoe covers on.
Finish checks: shutter gaps even, hinges adjusted, drawers glide, plinth level, edges clean.
Snags left open, with reason and expected closing date.
Handover: walk round done, care sheet given, client signature and remarks.
Fitter and site lead names, time in and time out.Pay, travel and private work
If fitters are paid per kitchen, link the final part of the payment to a signed job card with no conduct remarks. Pay site and travel allowances on a fixed day. Set out in writing whether fitters may take private work from your clients, and talk it through at joining. Many will respect a clear line. Few respect one they discover only after the fact.
First moves
Sort the call-backs this week. Print the job card next week and try it with one crew. Pick a site lead after a month of watching who uses it well. The kitchen cabinet makers' page covers fitters working alone in occupied homes. To fold site quality into each fitter's review, see installer reviews in kitchen units. Our training for client-facing conduct prepares crews for awkward conversations. The wood and furniture overview links the rest.