Skip to main content
GullyHR

Idle days and long site runs surface too late: HR for quality consulting firms

Quality consulting firms can see bench days, long site runs and unproven method skills early with daily time codes and a one-page monthly people report.

Ganesh HS · · 7 min read

Workplace scene for Consulting Firms: Utilisation, Travel and Career Steps

In brief

  • Fix daily time entry with a short set of activity codes before building any report.
  • Record who has used each quality method on a real assignment, with the evidence.
  • Review one page each month covering bench days, unbroken site weeks, learning and late claims.
  • Attach a decision and an owner to every figure, or stop collecting it.

At the partner meeting, utilisation looks acceptable. That afternoon a senior consultant resigns after a long unbroken run of plant visits, while an associate down the corridor has had little billable work for weeks. Both facts sat in timesheets, travel bookings and one manager's head, and nobody had put them side by side.

Which people figures should a quality consultancy see before trouble arrives?

Start with four: days between assignments by person, consecutive weeks on client sites, method skills backed by real assignments, and learning time actually given to associates. All depend on daily time entry with clear activity codes. Review them monthly on one page, with a decision recorded against anything that has moved the wrong way.

Revenue and billed days tell you what happened to the firm. They hide what happened to people. A team average can look healthy while two principals are overbooked and three associates wait for work. Your consultants teach clients to look at variation and root causes; apply the same discipline to your own deployment.

Repair the timesheet first

A week filled in on Friday from memory blurs client work, proposal writing, travel and training. Ask for entry at the end of each day, from a phone if the consultant is on a plant floor, and keep the codes few enough to remember.

Daily activity codes
SITE  client work on site
REM   client work off site
TRV   travel on a working day
PRP   proposals and pre-sales
TRN   learning received
COA   coaching a colleague
INT   internal work
BEN   available, unassigned
LVE   leave and holidays

Each entry:
Date | code | project | hours
Site name if SITE
Method used, if SITE or REM
Night away: yes / no

Enter the same day.
Lead checks every Monday.

Explain why you are asking. If consultants believe the bench code will be used against them, they will bury idle days under internal work and the report will mislead you. Say that unassigned time is a planning signal for the people who sell and schedule, and behave that way the first time it shows up.

Have project managers check the previous week every Monday. Gaps are easy to fill after a few days and nearly impossible after a month. Match the site code against visit reports, so that a half day at a client plant followed by report writing at the hotel is split correctly. Review the code list after the first month and remove any code nobody uses.

Build the report in stages

  1. 1

    Agree definitions in writing

    Decide what counts as an available day, a site week and a bench day, and how leave and public holidays are treated. Settle whether a weekend away counts. Without this, partners argue about the figure instead of the cause.

  2. 2

    Check a month of entries

    A project manager compares entries with travel bookings, visit reports and invoices. Correct mismatches with the person concerned. Expect rough data at the start and fix the code list where it causes confusion.

  3. 3

    Record method evidence

    For each consultant, list methods such as process capability studies, failure mode analysis, measurement system checks or audit preparation. Note the assignment, the role played and who saw the work. Mark each as observed, assisted, led or taught.

  4. 4

    Produce the monthly page

    One owner assembles it by a set day. Show each person as a row, not only a firm average, and mark changes since last month. Keep access limited to those who plan work.

  5. 5

    Decide and follow up

    For each flag, record an action: a swap between sites, a week at base, an associate paired onto a study, a proposal pushed toward an idle skill. Open next month's meeting with last month's actions.

What belongs on the one page

  • Bench days by person, with the reason: gap between projects, cancelled visit, skill not in demand or waiting on a client.
  • Longest unbroken run of site weeks and nights away, compared with a limit your partners agree.
  • Upcoming assignments where only one person has led the required method.
  • Associates with learning or coaching time recorded, and those with none.
  • Expense claims still open past your submission date, and pass-through costs lacking written client agreement.

Leave out attrition forecasts, engagement indices and dashboards with dozens of tiles. A small firm has too few people for percentages to mean much, so show names and counts to those entitled to see them. A spreadsheet is adequate until assembling it becomes the burden. Our note on HR reporting and analytics explains how to choose measures that lead to a decision.

Read the page for causes, not culprits

A bench figure has several possible stories. A client postponed a certification visit. Sales promised a method that only one principal has led. An associate was never put forward because nobody had seen their work. A project ended early and no one told the scheduler. Ask which it was before drawing conclusions, and note it in a few words. After several months the reasons repeat, and they point to a decision about training, selling or planning. Treat a single odd month as a prompt to look, not as a trend.

Share the actions with the consultants concerned. People who supply data every day should hear what it changed.

Test the report after a quarter

At the end of the first three months, ask partners which decision the page changed. Perhaps a principal was relieved of a fourth consecutive site week, or a proposal was timed to fill a coming gap. Keep the measures that led to action. Drop or redefine the ones that only prompted discussion, and resist adding a new figure unless someone can say what they would do differently on seeing it.

Use the findings on the next two problems

First, write a deployment rule: how far ahead site visits are confirmed, what rest or base time follows a long run, who may override it and how a consultant raises a clash. The site-week figure shows whether the rule is kept.

Second, give associates a learning route built from the method record. Name the next method, the assignment where they will practise it and the senior who will explain the reasoning, so that data collection stops being the whole job.

Where to go next

Introduce the codes at the start of a week and review the first full month before adding anything. The page on HR for quality consulting covers the surrounding people issues. To have the report and its definitions set up with you, tell us your requirements.

Questions we are asked

Make entry quick, keep the code list short and show what changed because of the data, such as a rotation off a long site run. Chasing works poorly when people see no use. Principals should enter their own time on the same terms.

Related service

HR for Management and Business Consulting Firms: deployment, utilisation, travel and skill growth

HR for consulting firms: consultant deployment, project timesheets, utilisation, travel, competency matrices and performance.

Talk to us about this

Read next

Industries

HR for Strategy consulting: what to set up first

A set-up order for a strategy consulting boutique: mid-engagement feedback, coaching for engagement leads, a skill ladder, plain pay logic and sector notes.

6 min readRead article
Start with your business need

What does your HR team need to solve?

Tell us your industry, team size and the issue you want to address. Bring one example of where work gets delayed or ownership is unclear, and the deadline or decision you are working towards.

  • A free first conversation with an HR practitioner
  • A clear scope and fee before any paid work
  • A practical next step for your business

Let’s start with your business

Share your contact details and the HR challenge on your mind. We’ll help you find the right starting point.

Include your country code, for example +44 or +1. Indian numbers can be 10 digits.

Your details stay private. Privacy policy