An owner of a medical device business gets a thick monthly pack: headcount, attendance averages and a chart of training hours. Meanwhile the one person who can release sterilised loads has been working through weekends, and two assembly operators are overdue for reassessment. Neither fact appears on any page.
In pharmaceuticals and life sciences: what should the owner check about people each month?
Check whether work was done only by qualified people, which tasks depend on one person, what training or reassessment is overdue, how joiners are progressing, who left or may leave, where hours are piling up and whether concerns are being answered. Each exception gets a named action before the meeting ends.
Who attends and what they bring
Invite the quality head, the production or laboratory head, the sales head if you run a field force, and the person responsible for employee records. Each brings exceptions on a single page, prepared beforehand. Averages are left out unless someone will act on them. Individual health, grievance and disciplinary details are discussed only with those who need them.
Qualification and training
Source: the training matrix compared with rosters and signed batch, laboratory or assembly records. Sample some entries instead of trusting the matrix alone. If anyone performed or verified a task without current qualification, it goes to quality assurance at once under your deviation procedure. If reassessment is falling due, book assessor time and adjust the roster now.
Single-person dependence
Source: the shift cover list. Look for release authority, key instruments, sterilisation, utilities, regulatory submissions and study knowledge held by one name. Pick the riskiest, name a successor and set the first training session. Ask whether last month's chosen backup actually received time.
New joiners
Source: clearance cards or probation notes from trainers. Find those who are rostered ahead of their training or still waiting for a trainer. Speak to the supervisor, protect training slots and raise concerns with the joiner well before any confirmation decision.
Leavers and vacancies
Source: the people list, exit conversations and manager notes. Group by role, shift, manager and territory. A cluster of analysts leaving one section, or representatives leaving under one area manager, calls for conversations there. For each vacant territory or critical post, confirm temporary ownership and the hiring step in progress.
Hours and absence
Source: attendance records, overtime approvals and the roster. Look for the same people extending, rest shortened by swaps and absence rising on one shift. Redistribute work, train cover or change the schedule. Also ask about contract workers, whose hours may sit only in a supplier's sheet.
Error themes with a people cause
Source: deviation, complaint and audit finding summaries from quality. Where a report says "human error" and prescribes retraining, ask what made the error likely: an unclear procedure, interruption, fatigue, poor layout or weak supervision. Do not use this meeting to rank people by deviation count.
Concerns and promises
Source: the grievance and concern log, safety reports and actions promised to staff. Check that each has an owner and that the person who raised it has heard something. Silence after a safety or data integrity concern teaches the next person not to speak.
Contract workers and suppliers
Source: supplier files, gate entries and your own training records. Look for substitutes admitted without recorded clearance, expired documents and people on the floor who appear on no list. Give the supplier a written correction with a date, and keep the affected person off controlled tasks until your evidence is complete.
Turn an exception into an action
A weak action reads "improve training". A usable one names the gap, the person responsible and proof of closure. As an illustration: only the day lead can release the packing line, so the production head will have a second lead trained, observed and authorised, the quality head will record it, and the roster will show both names. The next review checks the roster itself, not a verbal update.
A distributor can apply the same pattern to cold store receipt and dispatch, and a research laboratory to instrument ownership and notebook review. A clinical research organisation can look at monitors carrying more sites than they can cover, delayed visit reports and handovers when an associate leaves a study.
Look ahead before you close
Spend the final minutes on what is coming. Ask about a planned inspection or customer visit, a new product, line or study, a seasonal order peak, shutdown work, long leave and contracts ending. For each, ask who will do the added work and whether they will be qualified in time. A technology transfer or equipment installation needs trained operators, analysts and maintenance staff before the first batch, so assessor time belongs on the project plan now. Where a post cannot be filled in time, the owner should decide openly what is delayed or reduced, with quality advice where product work is affected.
Month:
Chair:
Check / exception / owner / by
1 Unqualified work:
2 Reassessment due:
3 One-person tasks:
4 Joiners at risk:
5 Leavers and vacancies:
6 Heavy hours or absence:
7 Error themes:
8 Open concerns:
Last month actions:
Done:
Open and why:
Decision needed from owner:Run the meeting
- 1
Start with old actions
Each owner says done or not done. For anything open, remove the obstacle or reassign it.
- 2
Take product and safety exceptions first
Confirm that anything urgent has already entered the proper quality or safety process. The meeting supports that process and does not replace it.
- 3
Move through cover and people
Discuss only exceptions. If a check has nothing to report, record that and say how it was verified.
- 4
Decide what the owner must release
Approve assessor time, a hire, a schedule change or equipment access where managers cannot do it alone.
- 5
Send one page
List actions, owners and check dates on the same day, leaving out private personal details.
Keep to a handful of actions. If the same item returns for a third review, ask which resource or decision is missing and whether it sits with the owner.
What not to bother with yet
Skip training hour totals, attendance league tables and dashboards nobody questions. A full matrix can still hide someone signed off without demonstrating the task, so ask one supervisor how a recent qualification was assessed. Add a measure only when you can state what you would do if it changed.
Where to go next
Run the first review with whatever records exist and note which checks have no reliable source; fixing those is the first action. See HR for pharmaceuticals and life sciences and our performance management process page. If you want an outside view, tell us about your business; the first conversation is free.
