Onboarding new joiners in telecom and field technology services: the first thirty days

A thirty day onboarding plan for technicians, riggers, installers and NOC staff in telecom, fibre, ISP, CCTV and network maintenance businesses.

Ganesh HS · · 7 min read

A factory supervisor and colleagues discussing a shift handover in a workshop

In brief

  • Field joiners need a kit list, a named buddy and a ride along week before any solo ticket.
  • Teach safety at height and electrical points in week one, then add sub-sector skills for fibre, CCTV, ISP or maintenance.
  • Move from assist to first solo tickets with a call in rule, then review five jobs at week four.
  • Hold a written day thirty review with joiner, buddy and supervisor to decide on confirmation.

A fibre technician starts on Monday. By ten o'clock he is on a motorbike with a drop cable drum and a fusion splicer he has never used. His job sheet sends him to a society where the building secretary demands a gate pass. Nobody has told him who to ring when the optical power meter shows a weak reading. Field technology firms lose joiners in the first month more often than in any other period, and the cause is nearly always a hurried handover on day one.

This guide lays out a thirty day plan for new technicians, riggers, NOC executives and installers in telecom infrastructure, fibre, ISP, CCTV and network maintenance businesses. It follows the general employee onboarding process but bends it to the work of a field crew.

Before day one: what the van and the ticket queue need

  • Kit issued against a signed list. Harness, lanyard and helmet. Hand tools, cable cutter and crimping tool. A tester, or an OTDR for the senior. High visibility vest, torch and a phone with the job app.
  • Login for the ticketing tool and the stock app, with a read only role at first.
  • One senior from the same zone, on the same roster of early and late rounds.
  • Vehicle or fuel allowance rule written in plain words, plus the logbook.
  • A site pass or authority letter for entry into societies, towers and data rooms.

Days one to five: stay close, see the whole job

In the first week the joiner rides along. He watches a complete installation or a fault ticket from the call to the customer's signature. He learns the sequence. Confirm the appointment. Check the drop route. Read the power meter before and after the splice. Configure the ONT or router. Run a speed check, fill the handover form and photograph the finished work. Indoor roles such as NOC executives sit with the shift lead, read the alarm dashboard and learn the escalation ladder to the field supervisor.

Add two safety sessions. One is work at height, with a harness check done by hand. The other covers electrical points, battery banks, DG sets and the rule against touching live equipment. A site health and safety walk is in the workplace safety page for fibre companies.

A thirty day grid

  1. 1

    Week one: ride along and sign the basics

    Joining form, kit receipt, safety briefing, SOP read, buddy named, first look at the stock app. No solo visits.

  2. 2

    Week two: assist, then lead one step

    The joiner prepares the cable route, fixes clamps or runs the conduit under supervision. The buddy handles the customer conversation.

  3. 3

    Week three: first solo tickets, with a call-in rule

    Simple tickets such as router swaps or CCTV camera repositioning. He phones the buddy before leaving the site. Photos go to the group.

  4. 4

    Week four: full queue, supervisor review

    Usual ticket mix, with a sample of five jobs inspected by the field supervisor. Look at SLA compliance, repeat visits and customer remarks.

  5. 5

    Day thirty: written review

    Joiner, buddy and supervisor sit together. Record strengths, gaps, training items and the decision to confirm or extend.

Words a joiner must hear in week one

A new technician is lost less by the work than by the vocabulary. Spend an hour on the trade terms. Attenuation and dB loss at a splice. Pigtail, patch panel and jumper. Splice tray, closure and manhole. HDPE duct, microduct and the blowing machine that pushes cable through it. Azimuth and tilt when an antenna is aligned on a sector. Earthing, megger readings and genset diesel levels at a BTS shelter. Crimper, ferrule, gland and trunking for CCTV runs. Let the senior say each word while pointing at the item.

Skills to teach, by sub-sector

  • Fibre: stripping, cleaving, fusion splicing, loss readings, splitter box labelling, ONT activation, trenching and right of way etiquette.
  • CCTV: camera focal lengths, PoE switch limits, DVR or NVR set up, storage days, cable conduit and cable testing, customer privacy cautions.
  • Network maintenance: preventive maintenance schedule, battery and rectifier checks, fault log, spares custody, escalation to the NOC.
  • ISP support: PPPoE credentials, router firmware, Wi-Fi channel choice, bandwidth complaints, the apology script.
  • Telecom infrastructure: tower climbing clearance, rigger team roles, material lifting, permits from the site owner.

Paper a field joiner carries

  • Society authority letter and gate pass, so the watchman at the apartment complex lets the crew through.
  • Tower access permit and rooftop key register, signed at the landlord's office.
  • Vehicle logbook with odometer entries, helmet check and a fuel slip pouch.
  • Customer acknowledgement slip and the installation job card, carbon copy for the customer.
  • Stock custody sheet for ONT boxes, routers, adaptors, connectors and drop cable drums, countersigned at the store.

Faults a joiner will meet in the first month

  • A JCB bucket cuts a duct and the fibre goes dark for a whole lane.
  • A rat chews a drop cable inside a ceiling.
  • Pole fibre sags after a storm and a loose clamp swings in the wind.
  • A power cut trips the OLT and the battery bank in the cabinet runs flat.
  • Water gets into a PoE camera housing during the rains.
  • A customer's router sits beside a microwave and the Wi-Fi channel is crowded.

What the supervisor should watch

Zone supervisors are stretched across forty sites, so hand them a pocket card. Is the joiner using the harness every time? Does he phone before improvising? Does he close tickets with photos? Are spare parts returned the same day? Does the customer say he explained the work? Use it alongside the performance page for CCTV installation firms, which shows how performance for installers can be read.

Common weak spots

The first is a joiner sent solo because a technician resigned. The second is kit that is issued but never counted again, which leaves a tool shortage on a monsoon morning. The third is a buddy who is also carrying a heavy ticket load and has no time to coach. Clear part of the senior's daily load while he coaches. The fourth is paperwork nobody reads. If the handover form is dull, the joiner will learn to skip it.

For the wider picture see the telecom and field technology HR hub and the onboarding page for internet service providers. A tailored plan can start from our requirements form.

Questions we are asked

A week of ride along is common, followed by assisted work in week two. Solo tickets begin in week three, starting with simple jobs and a rule to call the buddy before leaving the site.

Read next

Your next chapter

Let’s make HR work better.

Tell us what is slowing your team down. We’ll help you find a practical way forward, starting with a conversation.

  • A free first conversation with an HR practitioner
  • A clear scope and fee before any paid work
  • A practical next step for your business

Let’s start with your business

Share your contact details and the HR challenge on your mind. We’ll help you find the right starting point.

10-digit Indian mobile, without +91.

Your details stay private. Privacy policy