A moulding trainee survives his first week. He learns to purge the barrel, nick gates off with a deflashing knife and spot sink marks under the inspection lamp. On day eighteen the night operator phones in sick, and the trainee is left minding three presses alone. A heater band trips at two in the morning. His frantic call goes unanswered for twenty minutes. On day twenty-two a crumpled wage slip arrives, thinner than he expected, and nobody explains the proration. By day twenty-four his locker is empty.
Many plants now manage a tidy first week. Far fewer script days eight to thirty, the stretch in which trainees quietly make up their minds. The people page for parts suppliers asks for safe, structured early weeks with a named buddy. What follows maps the whole month so an in-charge can work through it line by line.
Ready before arrival
- Ring the joiner two days ahead to confirm date, shift and gate timing, in Kannada, Tamil, Hindi or Odia as needed.
- Note shoe and glove sizes, then stock steel-toe shoes, foam ear plugs, goggles, cut-resistant gloves or a leather apron to suit the section.
- Allot a locker, a canteen card and a place on the right bus route.
- Pick a buddy from the same crew and rotation, and brief them a day early.
- Warn security and the time office about the arrival.
The month at a glance
Day 1: welcome from the in-charge, plant walk, exits and assembly point, PPE fitting, canteen and first-aid room.
Day 1: shift timings, punching, leave rules and who to ring when unwell, explained simply.
Day 1: safety induction signed before entering any production bay.
Days 2 to 5: dojo practice on trial shots, scrap terminals, spare blanks or dummy packs; gauges and the defect library.
Days 6 to 14: supervised running on one station, buddy alongside every shift.
Day 15: trainer watches a full cycle and decides on more supervised running or solo work with spot checks.
Days 16 to 23: steady output on the first station; an hour daily observing a second station.
Days 22 to 25: first wage slip explained line by line by the time office.
Days 24 to 29: supervised practice on the second station, never alone on nights.
Day 30: review with HR and the in-charge; sign-off entered in the matrix and training file that afternoon.Days two to five: practice, not production
Every section needs its own dojo drill. Each ends with the same instinct: a doubtful part goes aside and the line leader gets called.
- Harness boards: strip length, wire crimp and insulation crimp on scrap terminals, checked with a crimp micrometer and the pull tester.
- Moulding halls: purging the barrel, using the sprue picker safely, trimming gates and sorting trial shots against flash and sink-mark samples.
- Press and weld shops: two-hand controls, light curtains, spot weld chisel tests and electrode tip dressing on spare blanks.
- Engine parts: bore gauges, air plug gauges and the wash stage, practised on rejected liners or pistons.
- Brake discs and pads: runout on a dial indicator, the balancing machine and the dust mask fit check.
- Fastener sorting: thread ring gauges, length gauges and the rule for mixed-grade cartons.
- EV packs: busbar torque sequence with insulated tools and static wrist straps, on a cell-free dummy pack.
Days six to fifteen: one station, one buddy
- 1
A single station
Plugging gaps elsewhere teaches nothing and makes the matrix lie later.
- 2
Buddy runs alongside
The buddy explains each check, lets the joiner lead more cycles each day and writes a two-line daily note.
- 3
Speed arrives last
Loading, gauging and guarding habits come before cycle time. Targets rise gradually after day ten.
- 4
In-charge stops by
Two minutes per shift: one question, one word of encouragement, one glance at the buddy's note.
Day fifteen: the first real check
The trainer watches a complete cycle, including gauging and one planted doubtful part. Outcomes are simple. Either more supervised running with a named gap, or solo work with spot checks twice a shift. Write the result in the training file that day.
Weeks three and four: where joiners decide
Weeks three and four deserve the same attention as the first. Never leave a joiner alone on nights or minding several machines before day thirty. Bring in a second station by watching first, then supervised practice. Have the time office walk through the first wage slip, covering proration, deductions and when overtime shows up. Plenty of silent resignations start with a baffling payslip.
Day thirty and after
On day thirty HR sits with the in-charge and the joiner for twenty minutes, somewhere quieter than the line. Ask how the job compares with the promises at interview, what felt toughest and whether anything frightened them. Note the sign-off level and the next station. Afterwards, plot early exits by week since joining, so any bulge around weeks three or four stands out.
Plants wanting help to build this month can start with our joiner induction design work. Board workers get a staged path on the staged first month for harness board workers. Hot shops are covered on the forged parts onboarding page. For the opening days specifically, use the six-shift checklist for newcomers.



