Kilos of wire and sheets cut tell an owner little. Which fabrication numbers reflect what buyers feel, which to drop, and a Friday bay board that keeps the useful ones in sight.

Ganesh HS · · 7 min read

A manager and employee having a constructive performance review with a shared notebook.

In brief

  • Watch what the next station and the buyer feel: clean first passes, correction hours caused, gate-out against the promised date, signed first-offs and grade tests passed.
  • Demote raw activity counts such as kilos of wire burned, hours on the premises, joints welded, sheets cut and strokes per shift.
  • Judge flow work by bay and station; keep personal figures for isolated roles like nesting, polishing or die setting.
  • A Friday board beside the bay and a short monthly sit-down per person turn figures into habits instead of blame.

An owner starts ranking his welders by kilos of MIG wire drawn from stores each month. Top of the list is a quick, cheerful hand. He is also the one laying fillets twice the drawn leg, leaving a carpet of spatter for the grinder and re-welding his own wormholes every other week. At the bottom sits a quiet welder whose correctly sized joints never return. The ranking crowned the wrong man.

A fabrication shed throws off tallies all day: spools issued, sheets cut, tonnes loaded, strokes counted. Most describe activity. A handful describe what matters: whether parts fit at the next station, whether jobs leave on the promised day, whether skill is growing. Picking that handful sits at the centre of how we run a performance management process. It grows straight out of the rework pattern on the hub for fabrication HR.

Readings worth watching

  • Clean first passes, by bay: jobs clearing your final check with no correction slip. Taken from slips and the gate-out file.
  • Correction hours caused, by station: from the slips, filed under the station where the fault started, not where someone spotted it.
  • Gate-out against promise: each job's promised date beside the date on its delivery challan.
  • First-offs signed before bundles ran: signed and unsigned first-offs at every changeover.
  • Changeover time on the bottleneck: press brake tooling swaps or stamping die changes, clocked by the operator himself.
  • Beam-on hours for lasers: cutting time against staffed time, read off the controller and discussed carefully.
  • Grade tests passed: retests sat and cleared each quarter.
  • Near misses reported: read as a sign of trust, not of danger.
  • Snag items at erection or installation: for site jobs, the client engineer's snag sheet per job.

Tallies to drop or demote

  • Kilos of wire or electrode packets per welder. Heavy use can mean oversized fillets, spatter and repairs.
  • Hours on the premises. Someone staying late redoing his own fit-up looks devoted and costs you twice.
  • Joints, brackets or panels counted alone. Without acceptance, the count pays for haste.
  • Raw tonnes loaded. It hides whatever the erection gang sent back.
  • Strokes per shift on a power press. Handy for planning, hazardous as a personal target.
  • Sheets cut per shift. Silent on nest density, remnant use and wrong cartons.
  • Loose ratings for attitude. Swap them for observed behaviour: checks done, help given, guards respected.

Bay or person?

Most fabrication is flow work. A blank travels from shear to brake to fit-up table to welding bay to grinding corner, and faults ride along. Judge flow work by bay and station, then let the slips show where a fault started. Keep personal readings for roles that work alone: the nester's sheet yield and remnant rack, the die setter's stopwatch, the polisher's panels accepted against the reference sample. Even then, talk the reading through with him before concluding anything.

One honest reading per station

  • Shear and punching: blanks re-sheared because the cut list or the back stop was wrong.
  • Press brake: angle drift along a bundle, read on the first, middle and last piece.
  • Fit-up table: frames failing a corner-to-corner check before any welding.
  • Galvanising run: jobs returned from the galvaniser for blocked vent holes, trapped flux or zinc runs.
  • Packing and dispatch: cartons opened by the buyer and found short or mixed.
  • Erection gang: snags still open on the day the client engineer walks the frame.

Every one of these points to a habit someone can change. A cut list checked twice. A protractor used mid-bundle. A tape stretched across diagonals. Vent holes drilled before dispatch. A packing list ticked line by line. A snag walk the evening before handover.

Building the routine

  1. 1

    Pick a short list per bay

    From the watch list, take the four or five that bite there. A welding bay might use clean first passes, correction hours caused, gate-out against promise and grade tests passed.

  2. 2

    Name one source for each

    Correction slips, job travellers, first-off sheets, the gate-out file, the laser controller. Any reading that needs fresh paperwork nobody will keep, drop.

  3. 3

    Hang a board at the bay

    Chalk it up every Friday. Anyone in the crew should read it in under a minute.

  4. 4

    Gather the crew weekly

    Ten minutes standing at the board: what went right, the biggest correction cause, one change to try.

  5. 5

    Sit with each person monthly

    A brief one-to-one with the chargehand: his share of the board, progress toward the next grade, one thing to attempt, one thing the shop owes him.

  6. 6

    Revisit grades quarterly

    Use tests cleared and monthly notes to decide who sits a retest. Pay follows grades, never one month's tallies.

Friday bay board
Bay and week: ________.
Jobs through the gate, and how many on the promised day: ________.
Clean first passes, and jobs carrying a correction slip: ________.
Correction hours caused here: ________.
Biggest correction cause this week: ________.
First-offs signed before the bundle, and any missed: ________.
Tooling or die changeover time on the main machine: ________.
Near misses reported, and what got fixed: ________.
Grade tests sat and cleared: ________.
Next week's single change, and who leads it: ________.

Bringing the readings into a review

The board belongs to the crew; the monthly sit-down belongs to the person. Bring the board, his slips and his grade record, and ask before telling. 'Corrections from the fit-up table jumped this week. What happened there?' tends to uncover a missing jig or a rushed order, not merely a careless hand. Two business types have their own angle. One is judging a welder's month beyond the bead count. The other is beam time against accuracy in laser job shops. Rolling boards into a monthly people report is covered in people reporting for general fabricators.

Where the readings lead

Those same correction slips feed bonuses, as quality-weighted incentives for fabrication explains. The slip routine itself appears in the post on finish and rework. Keep the list short and the sources honest, and a Friday board will reveal far more than any league table of wire spools.

Questions we are asked

As a bay for flow work, where fit-up and welding share each joint, with correction slips showing where faults started. Personal figures suit isolated tasks. In the monthly sit-down, look at each welder's share of the bay's results and his grade progress.

Related service

Performance Management Process

How the same HR problems look in a hospital, a warehouse, a kitchen or a plant.

Talk to us about this

Read next

Let’s find your next step

Is your HR process ready to scale?

Identify payroll leaks, record gaps and hiring bottlenecks in a free first conversation, and leave knowing what to fix first.

Book a free consultation

Know what you need? Share your requirements in four short steps.

Want the full picture? See the paid HR Diagnostic.

Prefer a quick message? Chat on WhatsApp

Talk to an HR consultant

Tell us where to reach you. All fields are required unless marked optional.

10-digit Indian mobile, without +91.

Your details stay private. Privacy policy