A hollow block plant pays its press crew by the number of pallets pushed out each shift. The count is taken at the press by the munshi. It is a fair, simple scheme, and it does exactly what it says. On busy days the crew shortens vibration time, pallets come off faster and the count climbs. A week later, the loaders find broken corners and honeycombed faces in the stacks, and two truckloads come back from a builder's site. Nobody on the press crew loses a rupee.
Pallet counts and pieces pressed dominate pay across kiln, press and casting plants, since a munshi can tally them by eye. Keep the count. Just move it downstream, to where cracks, shade and fit have shown themselves.
Where the count goes wrong in each trade
- Blocks and pavers: counted at the press, before curing reveals poor compaction, arris damage or breakage in stacking.
- Tiles: counted at the press or kiln exit, before the sorting line grades them premium, standard or seconds.
- Cement products: pipes and slabs counted at casting, before early stripping shows up as cracks.
- Roofing sheets: metres rolled, with no deduction for scrap at profile changes or coating scratches.
- Doors and windows: frames fabricated or installed per day, ignoring callbacks for leaks, sagging sashes or hardware faults.
- Construction chemicals: batches filled, regardless of whether viscosity or setting time passed the lab check.
What a quality-linked scheme looks like
Keep the base daily or monthly rate exactly as it is. The incentive sits on top and is earned only on good pieces, measured at a later point. Three design choices matter most.
First, the counting point. For blocks and pavers, that is the stack after the curing period. For tiles, it is the sorting line, with premium grade earning more than standard and seconds earning nothing. For fittings, it is the snag list at handover. Second, the unit. Where a press or kiln is run by a crew, pay the crew and split by an agreed share, so no one fights over whose piece failed. Third, the people included. Curing attendants, sorters and stackers protect quality too, so put them in the same pool.
Steps to redesign the scheme
- 1
Trace where defects start
With the plant head and quality checker, follow one batch from hopper to truck. Note which faults come from the press, the mix, curing, handling or raw material.
- 2
Choose the counting point
Pick the earliest point where quality is known with confidence, such as the curing stack, the sorting conveyor or a handover snag list.
- 3
Pick two or three measures
Good pieces, a grade split and one returns or callback figure will do. Add a fourth and the munshi falls behind by Saturday.
- 4
Protect the crew from what it does not control
Strike out losses caused by a weak cement lot, damp fly ash, clay body variation, a worn mould liner or a grid outage. Log each one on its own line.
- 5
Test on past records
Rework the last quarter's munshi sheets under the new rules. Check that a careful crew earns at least what it did and a careless one earns less.
- 6
Explain it on the floor
Walk each crew through one real week, in their language, with the old and new totals side by side.
- 7
Review after a season
Look at rejects, returns, earnings and complaints. Adjust once, then hold the scheme steady.
Crew, line and week.
Pieces produced at the press, kiln or line.
Pieces passed at the counting point, by grade.
Excluded losses and reason: raw material, power, breakdown.
Returns or callbacks traced to this crew.
Incentive earned, before the crew split.
Share per person and days present.
In-charge signature, then an office cross-check.Mistakes that sink a new scheme
- Announcing it in the busy season, when any fall in earnings feels like a cut.
- Using a rule only the accountant can calculate.
- Blaming crews for defects that came from the raw material or the mould.
- Leaving out curing and sorting hands, whose wet hessian and sharp eyes save more pieces than any press speed.
- Changing the rules every month.
Tracking good pieces per crew depends on records the in-charge already keeps. To set up those crew records, see how block plants track crew output and crew measures for paver yards. Both start from the pallet tally, the curing chamber log and the breakage note the loaders already make.
Working through it with us
Through our pay and reward design service we rebuild incentive rules together with grade rates, so a press hand's bonus and his daily wage tell one story. Post your present scheme and one week of munshi sheets via our brief form.



