The rotavator blade bolt that sheared in a farmer's field in July traced back to a weld done in April by a casual hand. Nobody in the factory knew who. The weld joint had no initials, the job card had no welder's name, and the fabricator who had trained the casual hand had left in the May lull. The dealer paid for the replacement and the farmer told three neighbours.
A plough, tiller or sprayer maker has to start HR from that failure. Headcount follows the monsoon. The knowledge that matters sits in a few welders' hands. And the people who learn about failures are the dealer's mechanics, far from the shop floor. Below is what to set up, in the order the season allows.
Start with a welder and fitter skill record
Make one page for each welder, fitter and press operator. Write what the person has welded, in which thickness and position, on which jig, and who checked it. Use a test coupon, a bend test and a supervisor's sign-off to confirm skill. Date every line.
- MIG welder on mild steel frames, within a stated plate thickness.
- Gas cutter and plasma operator on tine and blade blanks.
- Press brake operator on bent shields, hitch plates and sprayer tank skirts.
- Shearing machine operator on sheet for hoppers and guards.
- Assembly fitter for gearbox, PTO shaft and three-point linkage.
- Powder coat or paint booth hand, and the shot blast operator before it.
The record turns a reputation into a fact. It lets the production head put the right welder on the thresher drum frame and the junior on a guard. It also gives the casual hire a ladder to climb.
Plan the year before the dealers phone
- 1
Map orders by month
Mark sowing windows for kharif and rabi, subsidy announcements, dealer stocking weeks and the lull after. Use last three seasons' dispatch registers.
- 2
Fix a core and a flex
Core: welders, fitters, painters and inspectors you keep all year. Flex: helpers, loaders and second shift hands you add for ten to fourteen weeks.
- 3
Pay the core through the lull
A basic that stays steady, plus a season incentive on output and rework. Sit with the accounts head and agree the lean-month pay before the lull begins.
- 4
Use the lull for work
Jig repair, die maintenance, drawing revisions, trial runs on new models, cross-training, safety refreshers and dealer visits.
A one-day induction for the casual hand
Casual helpers handle hot steel, sharp edges, grinders and heavy plates in the busiest weeks. A short, fixed induction cuts accidents and rework. It should cover the shop layout, the guards on the press and shear, grinder discs and eye protection, lifting plates with the crane or two hands, a first aid kit, the fire point, and which job a helper may not touch.
See also the guidance for safety and wellbeing in farm equipment factories.
Drawing revisions and the stores desk
A new blade profile or a changed hitch pin position arrives in July. The draftsman updates the drawing. The stores keeper still holds last year's laser-cut blanks. The fitter builds to the old print. The batch goes back for rework. A simple rule prevents this. Every drawing carries a revision letter and date. The revision is read aloud at the morning toolbox talk. Old prints are collected and stamped superseded. The stores keeper, the draftsman and the production supervisor sign a change note, and nobody issues material until all three have.
Give the stores and dispatch staff a clear role description. Their errors in bin labels, short counts of bolts and washers, and wrongly stacked tines cost days in the peak. A two-hour training on the bill of materials for the top five models repays itself within one season.
Bring field failures back to the assembly bay
Ask each dealer's mechanic to send a photo and a note when a part fails: which model, which season, which batch. Give the sheet to the assembly supervisor each week in the season. Pin the three most frequent faults, such as cracked tine welds, stripped PTO splines and gearbox oil seals, on the shop notice board. Link a drawing revision to a date on the board so fitters never build to last year's blade.
Field service engineers need their own plan: travel days, targets agreed with the dealer, and a rest day after a long circuit. Their feedback is the best source of improvement for the whole plant.
Where to read more
The farm equipment manufacturers page lists the roles and the seven usual strains. Use the role design notes for the same type to write clear job cards. The wider hub is agricultural equipment and agri services.


