Skip to main content
GullyHR

How renewable energy companies can find and bench test installers and engineers

Sources and practical tests for solar, wind and EV charger hiring: bench tasks, drawing checks, fault finding, clearance papers and a scorecard.

Ganesh HS · · 7 min read

A power facility supervisor and HR coordinator checking technician records with solar panels outside

In brief

  • Keep warm sources for each role between projects, not only after an award.
  • Test on a de-energised bench, a marked drawing and a realistic site problem.
  • Treat licences and safety training as entry checks that no score can offset.
  • Write observed evidence, then state exactly what the new person may do alone.

A new rooftop order lands and your lead technician needs two more cablers by Monday. One applicant talks fluently about string design and inverters. On the roof, they crimp a DC connector with side cutters.

Where do you find renewable energy technicians, and how do you test them?

Draw on past project crews, electrical training institutes, neighbouring trades, equipment partners, employee referrals and targeted advertisements. Check identity, licences and safety training first. Then run a short practical test on de-energised equipment, a drawing and a site scenario, scored by a competent person against points agreed before the candidate arrives.

Where each kind of person comes from

  • Installation electricians and DC cabling technicians: building electrical contractors, panel assembly workshops, industrial maintenance teams and installers you have called back before.
  • Mounting and civil helpers: roofing, steel fixing, scaffolding and local construction crews. Test care and instruction-following, and train the product knowledge.
  • Commissioning and plant engineers: utility contractors, substation and industrial automation firms, and engineers finishing other energy projects.
  • Design engineers: engineering colleges, electrical consultancies and drafting offices, judged on a sample layout rather than software names.
  • Wind blade and gearbox specialists: turbine service firms, marine, aviation composite and heavy rotating equipment trades, with specific training still checked.
  • Charger installers and after-sales technicians: electrical fitters, appliance and telecom field service staff who are used to customer premises and fault tickets.

Between projects, keep a pool. Record who you would take again, for which tasks, with what training dates and where they are willing to travel. Tell them honestly when work is likely and when it is uncertain. A short message in a quiet month is worth more than an urgent call after a competitor has booked them.

Check the gate conditions first

See original or verifiable proof of electrical authorisation, height and rescue training, and any turbine or client-specific permit. Confirm travel willingness, driving permission where the role includes vehicles, and notice period. Ask what size and type of systems the person worked on and which parts they personally did. Someone who says we commissioned the plant may have carried cable.

A practical test in four stations

  1. 1

    Tools and protective kit

    Lay out a harness with a damaged strap, a meter with a cracked lead and sound items. Ask the candidate to select what they would use. Note whether they reject the faulty ones unprompted.

  2. 2

    Bench task

    On isolated practice stock, ask for a connector termination, a cable gland, labelling and a torque-marked clamp using the manufacturer's instructions. Watch tool choice, strip length, pull check and tidiness.

  3. 3

    Drawing and measurement

    Give a single-line diagram and a string table with one planted mismatch. Ask what readings they expect, how they would measure safely and what they would do if the value differed.

  4. 4

    Site scenario

    Describe a handover day: cloud is building, the client wants power on, and an insulation test result looks wrong. A sound answer stops energisation, records the result and calls the responsible engineer.

Change the stations by role. A design engineer revises a roof layout around skylights, shading and access paths, then explains the choice. A remote monitoring applicant sorts a list of alarms by urgency and drafts the field ticket. A customer coordinator handles a call about low generation after a dusty week without promising a cause. Lead candidates also brief a three-person crew while the assessor interrupts with a late delivery.

Questions that show real site experience

Alongside the stations, ask for one recent job and follow the detail. Broad claims thin out quickly when you ask what the person did with their own hands.

  • What did you find on site that differed from the drawing, and whom did you tell?
  • When did you last stop work, and what happened next?
  • Describe a fault that came back after you thought it was fixed.
  • How did you record readings, and who used that record later?
  • What would make you refuse to climb or energise?

Listen for sequence, honesty and credit given to others. Then ask a referee about the same job, with the candidate's permission, and compare the accounts. Differences are not always dishonesty, so raise them directly before drawing a conclusion.

Score what you saw

Technician practical scorecard
Candidate:
Role:
Assessor (competent for task):
Date and place:

ENTRY CHECKS (pass or stop)
Licence verified:
Height and rescue training:

0 unsafe  1 needs coaching
2 correct without prompting
PPE and tool selection:   [ ]
Isolation talk-through:   [ ]
Termination quality:      [ ]
Labels and torque marks:  [ ]
Drawing mismatch found:   [ ]
Measurement reasoning:    [ ]
Stop decision on site:    [ ]
Honest about unknowns:    [ ]

Any safety 0 = do not proceed
May do alone:
With supervision:
Training before site:
Decision and reason:

Use the same stations for everyone applying to that role, including a friend of the project manager. Keep the test short and proportionate, and never use a candidate's trial to complete paid client work.

Hiring a crew for a surge

When several joiners are needed together, spread assessors across the stations and hold a short calibration first, scoring the same sample termination until they agree. Mix new people with trusted ones when you plan the crew. A team made entirely of strangers, led by a newly promoted supervisor, is a predictable source of rework. Record unsuccessful applicants who could fit a helper role, if they agree to be contacted again.

Offer the posting, not just the job

Spell out base location, expected time away, travel and stay rules, rotation, standby, probation and what happens when the current project closes. Good technicians decide on these points, and a vague answer sends them elsewhere. Writing your workforce and recruitment process down also stops each project lead from hiring to a different standard.

Confirm the fit during the first project

A bench test shows a narrow slice. Pair the joiner with a named technician on their first site, list the tasks they will be observed doing, and agree when the lead will give feedback. Check termination quality, record keeping, tool care, conduct with the client and willingness to stop and ask. Compare those observations with the scorecard. Where a source or a test station keeps misleading you, change it before the next round of hiring.

Where to go next

See how hiring links to crew records and deployment on our page for renewable energy companies. If you are hiring ahead of several sites, or cannot reach commissioning talent, tell us your requirements with the roles, locations and skills needed.

Questions we are asked

Yes, where their licence and electrical habits are sound. Plan supervised training on direct current hazards, connectors, mounting, inverter settings and rooftop conditions. State which tasks stay closed until observed, and make sure the site lead has time to teach.

Related service

HR for Renewable Energy Companies: site crews, installer skills, safety training and project moves

HR for renewable energy companies: installer attendance, field engineer deployment, safety training records, project transfers and site allowances.

Talk to us about this

Read next

Start with your business need

What does your HR team need to solve?

Tell us your industry, team size and the issue you want to address. Bring one example of where work gets delayed or ownership is unclear, and the deadline or decision you are working towards.

  • A free first conversation with an HR practitioner
  • A clear scope and fee before any paid work
  • A practical next step for your business

Let’s start with your business

Share your contact details and the HR challenge on your mind. We’ll help you find the right starting point.

Include your country code, for example +44 or +1. Indian numbers can be 10 digits.

Your details stay private. Privacy policy