A new housekeeper arrives at a client's office tower for an early start. The supervisor is at another site, the guard has no name on the visitor list, and a colleague hands over a trolley and says to start on the third floor. By mid-morning the wrong chemical has gone onto a stone lobby floor.
What should happen in a new joiner's first week on site?
Give the joiner one named guide, one learning site and a short list of tasks. Cover safety and client rules on day one, demonstrate each task before they attempt it, watch them repeat it, and allow solo work only on tasks signed off by a supervisor. Everything else stays supervised after the week ends.
Settle these before the joiner turns up
A bad first morning is decided the week before. In facility management work the joiner depends on the client's gate, the client's keys and a supervisor who splits the day between locations. Confirm these in advance.
- Name the guide who will be on the same site and shift, and take part of their normal workload away.
- Send the client the joiner's name and whatever the site requires for entry, so the pass is waiting.
- Set aside uniform in the right size, safety footwear, gloves, eye protection and the identity card.
- Tell the joiner the gate, reporting time, travel point, meal arrangement and the number to ring if delayed.
- Print the task list for that post, with the cleaning schedule or planned maintenance round it belongs to.
- Check which chemicals, machines and access equipment are on site and which the joiner must not touch yet.
Day by day: who does what
- 1
Day one, arrival and safety
The supervisor meets the joiner at the gate, walks the site and shows exits, assembly point, first aid, restricted rooms, wet areas and plant spaces. The joiner learns whom to tell about an injury, a spill, a damaged item or a lost key. The guide demonstrates one low-risk task.
- 2
Day two, core tasks with the guide
The guide shows the daily round in order, including colour-coded cloths, dilution from the dispenser, wet floor signs and trolley set-up. Technicians shadow the log round and learn which panels and isolators are off limits. The joiner explains each step back.
- 3
Day three, the joiner leads
The joiner carries out the same tasks while the guide watches and corrects. Introduce the checklist, the washroom sign sheet or job card, and how photographs or timestamps are recorded for the client.
- 4
Day four, the awkward cases
Practise what goes wrong: an occupant asking for extra work, a machine that cuts out, an unlabelled bottle, a request to enter a server room, a pest sighting. The joiner says what they would do and whom they would call.
- 5
Day five, supervised solo area
Give the joiner a defined zone for a full shift. The guide checks it at the start, midway and before handover, and records faults against the task, so the correction is specific.
- 6
End of week, sign-off talk
The supervisor goes through the card with the joiner and guide, marks each task as alone, watched or not yet, checks attendance and pay details are correct, and fixes a date for the next check.
What may they do alone, and what stays supervised?
Judge this by task and site. A person with years of office cleaning behind them still needs supervision on a hospital corridor, a food area or a client's marble. Write the split down for each post so that a relief supervisor applies the same one.
- Reasonable alone after sign-off: dusting, emptying bins, restocking washrooms, mopping a familiar floor type, taking routine meter readings with a set round.
- Supervised until separately cleared: scrubbing and polishing machines, concentrated chemicals, stone or timber treatment, electrical work, pump rooms, waste compaction and key cabinets.
- Only for people holding the required training or permit: work at height, confined spaces, fumigation, chainsaw use, lift rescue and live electrical panels.
Induction for relief and replacement staff
Replacement workers are where first-week planning breaks. Someone is moved at short notice to cover a gap, knows the trade but not the building, and learns the rules from whoever happens to be nearby. Keep a one-page site sheet at every location covering entry, hazards, restricted areas, client contact, equipment store and the tasks a reliever may do. The person on duty walks through it and both sign before work starts. A reliever who has not been shown a high-risk task at that site does not do it, even if the client asks.
If your sites need different standards, resist writing one long induction for all of them. A short common part for conduct, reporting and chemicals, plus a site page, is easier to keep current. Our guidance on safety induction, training records and incident reporting sets out how to hold the evidence.
Name:
Role:
Site and shift:
Guide:
Supervisor:
Day one safety walk done: Y / N
Entry pass and ID issued: Y / N
PPE and uniform issued: Y / N
Knows who to call: Y / N
Task Alone Watched No
Daily round [ ] [ ] [ ]
Chemicals [ ] [ ] [ ]
Machines [ ] [ ] [ ]
Records [ ] [ ] [ ]
Client rules [ ] [ ] [ ]
Not permitted yet:
Next check date:
Joiner signature:
Supervisor signature:What goes wrong in week one
The guide is given a full round of their own and teaches in passing. Forms are signed in a batch on the first morning and nobody can say what was explained. The joiner is moved to a second site on day three because a post is empty. Or pay, attendance marking and leave rules are never explained, so the first payslip becomes the first argument.
Do not bother with long slide presentations or a written test for people who learn by doing, and read-aloud policy packs add little. Spend that time on watched practice. Where reading ability or language varies across the crew, use pictures on dilution charts and ask the joiner to show you, because a signature proves only that a pen was held.
Where to go next
Pick the site with the most recent starters and try the card there for the next joiner, then correct it with the supervisor. To build this into a wider routine see onboarding and probation. If you would like GullyHR to look at your sites, tell us what you need.