The monthly people check an energy or utility owner should run

A short monthly people review for energy and utility owners: permits, shift cover, fatigue, hiring, incidents and the action each answer triggers.

Ganesh HS · · 7 min read

A power facility supervisor and HR coordinator checking technician records with solar panels outside

In brief

  • Review the coming work as well as last month's records, starting with permissions and mobilisation.
  • Take every answer from a named record, not from a manager's general impression.
  • Decide in advance which action each warning sign triggers and who carries it out.
  • End with a short list of owned actions and check them first next time.

Consider an oil and gas services owner who spends the monthly meeting on invoices and equipment. A week later a mobilisation slips because two riggers' permissions have lapsed, and the night operator who has been covering a vacancy for weeks resigns.

In energy and utilities: what should the owner check about people each month?

Check whether upcoming work has authorised people, whether any shift ran below its safe crew, who is absorbing extra hours, which roles remain empty, what incidents and complaints are still open, and whether new joiners are progressing. Pull each answer from a record and assign an action before the meeting ends.

Set the meeting up so it stays short

Invite the operations or project head, the safety lead and the person who keeps HR records. Ask for the figures a few days ahead on one page per site, with exceptions marked. Read exceptions only. A site with nothing to flag needs a nod, while a site with no data needs a question.

Look forward: can the next work start?

  • Permissions expiring soon. Source: the certificate register. Action: book renewal, name a substitute or warn the project manager before the roster is fixed.
  • Mobilisations ahead. Source: project programme against the roster and gate requirements. Action: confirm named crew, inductions and client passes; escalate any seat without a qualified person.
  • Empty roles. Source: hiring tracker. Action: identify the stage where each is stuck, such as slow interviews or an unrealistic requirement, and give someone that obstacle.

Look back: what did the work cost people?

  • Shifts below minimum crew. Source: handover logs and roster changes. Action: record who allowed it and why, then train cover or change the deferral rule.
  • Extra hours and call-outs by person. Source: attendance and pay input records. Action: speak with anyone carrying a repeated load, redistribute it and check rest limits.
  • Absence patterns by site or shift. Source: leave and attendance records. Action: ask the supervisor what changed in transport, accommodation, workload or conditions.
  • Contractor gaps. Source: gate log compared with contractor files. Action: hold access where evidence is missing and take it up with the contractor.

Look at people: who needs attention?

  • Near misses and open follow-ups. Source: incident log. Action: confirm the fix was made at the work face and the reporter heard back. A silent site deserves a visit.
  • New joiners. Source: sign-off cards. Action: find who is still doing supervised tasks without a plan, and give the supervisor a date to review.
  • Resignations and warnings of them. Source: notices, exit conversations and supervisors. Action: hold a private conversation with people at risk and remove one concrete irritant.
  • Complaints and conduct cases. Source: the case record, shared on a need-to-know basis. Action: check that each has an owner and a next step, without debating private detail.
One page monthly review
Month:       Site:

FORWARD
Permits expiring:
Seats unfilled for next job:
Open roles and blocker:

PAST MONTH
Short-crew shifts:
Highest extra hours (names):
Rest limit concerns:
Contractor file gaps:

PEOPLE
Open incident actions:
Joiners not signed off:
Leavers and stated reason:
Open cases (count only):

ACTION | OWNER | BY WHEN
1.
2.
3.

Run it in this order

  1. 1

    Close old actions

    Start with last month's list. Each item is done, moved with a reason or dropped openly.

  2. 2

    Clear immediate risks

    Anything involving unsafe cover or missing permission is decided there and then. Do not let it wait for the next meeting.

  3. 3

    Scan the exceptions

    Go site by site, asking what changed and what evidence supports the answer.

  4. 4

    Choose few actions

    Pick the ones that protect people and the programme. Give each a single owner and date.

  5. 5

    Report back to crews

    Supervisors tell their teams what was decided about the problems they raised, including what will not change.

Set the triggers before you need them

Agree what turns a line from noted into acted on. A permission due before the next scheduled work with no renewal booked needs a decision that day. Any shift below its authorised crew needs an explanation. The same person carrying call-outs repeatedly needs a conversation and a cover plan. Choose your own limits with the safety lead, within local rules, and write them at the top of the page so the meeting does not renegotiate them each time.

As an illustration, suppose the page for a quarry shows one shotfirer available, rising hours for a crusher operator and an open incident action on a conveyor guard. A sensible owner would start training a second operator, ask the supervisor to rebalance the roster this week, and have the safety lead show that the guard has been repaired. Three actions, three names, and a clear first agenda item for next month.

What to leave out

Do not rank sites by fewest incidents reported, or praise the team with the most overtime. Both push people to hide trouble. Do not build elaborate dashboards before the records agree with one another. Weekly urgencies, such as tomorrow's cover, belong in operational meetings; the monthly review is for patterns and the decisions only an owner can make, including hiring, budget, client conversations and stopping work.

Visit one site each cycle and compare the page with what you hear in the control room, yard or crew vehicle. If they differ, fix the record route before judging the supervisor.

Add a longer view a few times a year

Some questions move too slowly for every cycle. At longer intervals, look at why people left by role and site, whether hires from each source were still with you and signed off, which critical tasks still depend on one person, and whether supervisors are holding regular conversations with their teams. Compare these with the project pipeline: new technologies, new regions and contract renewals change which skills you will need.

Ask supervisors one open question too: what slowed or endangered the work that none of these lines captured? Late transport, poor site accommodation, missing spares or unclear client instructions can sit behind absence and resignations. Where an answer recurs across sites, give it an owner and put it on the page until it is resolved.

Where to go next

Run the page once for a single site and delete any line that led to no decision. See HR for energy and utilities, the performance management process and HR reporting and analytics for further guidance. If you would like help setting it up, tell us your requirements.

Questions we are asked

The person keeping HR records assembles them, while site supervisors confirm accuracy for their own crews. Safety supplies incident follow-ups. Give each line a named source and preparer, so a missing answer is traced quickly instead of being guessed in the meeting.

Related service

HR for energy projects and operating sites

HR management for energy and utilities: project and operations crews, technical certificates, site safety records, contractor oversight and shift cover.

Talk to us about this

Read next

Start with your business need

What does your HR team need to solve?

Tell us your industry, team size and the issue you want to address. Bring one example of where work gets delayed or ownership is unclear, and the deadline or decision you are working towards.

  • A free first conversation with an HR practitioner
  • A clear scope and fee before any paid work
  • A practical next step for your business

Let’s start with your business

Share your contact details and the HR challenge on your mind. We’ll help you find the right starting point.

Include your country code, for example +44 or +1. Indian numbers can be 10 digits.

Your details stay private. Privacy policy