Module-line owners service the stringer on a calendar. The EL imager is calibrated on a calendar. The technician who tunes both gets looked at once, on the day his resignation letter arrives.
Here is a sixty minute sitting to hold on one fixed weekday each month. It has ten questions, a sheet to copy and a note on who fills each row. It fits module, inverter, mounting-rail, junction-box, battery-pack, wind-blade and container-storage units alike. Wider context lives on the page covering solar and wind hardware units.
Why monthly suits this trade
Orders arrive in lumps pinned to a developer's commissioning date. Laminator-bays and cycler-halls run round the clock because an idle flash-tester or rack earns nothing. Cell formats and pack specifications shift every few months and rewrite the work. A quarterly look is too slow for that pace. A weekly one swallows the works manager. Monthly sits between the two.
The sitting is short by design. It checks a few figures and asks the owner ten things in plain words. No software is required. One shared sheet is enough.
The ten questions
- Which three people would stop a line if they quit tomorrow, and are they content?
- Which night-shift night-rack, solder-bench or burn-in-hall had no technician within phone reach this month?
- How many new hands went solo on a stringer, spot welder, crimp-bench or lay-up-table, and did each pass a handling check first?
- How many cells, boards, glass sheets or housings broke at line-side, and on which shift?
- Who covered each absentee, and had that stand-in been trained for the seat?
- Who among your skilled hands has heard from a rival plant?
- Has a pay-gap opened between a fresh joiner and the older hand at the next bench?
- Which grievance has stayed open longest, and who holds it?
- Which shift-lead needs a quiet word about how they speak to the crew?
- What single change happens before the next sitting?
The sheet to copy
Month: ____ Seated: owner, works manager, HR lead, one shift-lead.
Row 1 Key-hands (three at most): names, exit risk (low, medium, high), reason.
Row 2 Night-gaps: bay or rack, date, what waited, who was reached by phone.
Row 3 New solo sign-offs: name, machine or bench, date, checker.
Row 4 Handling breakage: item (cell, board, glass, housing), count, shift, probable cause.
Row 5 Cover used: absentee, stand-in, trained yes or no.
Row 6 Rival offers heard of: role, source, step taken.
Row 7 Pay-gaps seen: roles set side by side, size of gap, step taken.
Row 8 Oldest open grievance: summary, holder, days open.
Row 9 Shift lead notes: name, subject, who will speak to them.
Row 10 One change before next month: what, who, by when.Who fills which row
- 1
Week before
The HR lead copies attendance, overtime hours and open grievances into the sheet. Shift leads fill rows two, four and five from their hand-over books.
- 2
Sitting day
Owner and works manager take an hour. They answer rows one, six, seven and nine from what they have heard and seen, and challenge each other where the hand-over books disagree.
- 3
Same day
Row ten is settled, worded simply and given an owner and a deadline. Nothing else is promised.
- 4
Next month
Open by asking whether row ten happened. If it did not, ask why before adding anything new.
How to read what you wrote
Scan the sheet for any name that appears twice. A technician listed under key-hands and again under rival offers is an urgent case. A shift that shows in both night-gaps and breakage points to thin supervision, not careless operators. Many solo sign-offs without handling checks mean training lags behind orders.
Pay-gaps deserve care. In many plants the newest cell-loading joiner earns close to the technician who has tuned the laminator and busbar tabbing head for three years, because the starting rate was lifted to fill vacancies. The older hand notices. Our pay benchmarking page for module makers sets roles side by side.
Slips that spoil the review
- Letting it drift into an appraisal. Its purpose is risk and support.
- Filling the sheet from memory. Use hand-over books and the attendance register.
- Adding an eleventh question. Keep ten, and reword one if you must.
- Passing named exit risks beyond the owner and the works manager.
Making it a habit
Run it three months running before you judge it. By the third sitting the questions feel obvious and the answers come quicker. If you want the figures fed in automatically, look at monthly workforce dashboards. To plan the first sitting with your team, give us a short brief of the unit on the requirements wizard. Plants with a busy pack line may also want the shift rota notes for pack makers for row two.



