Performance management and incentive design for Rigid Packaging Manufacturers: scrap and change time
On a moulding line, speed without care makes scrap, and care without speed misses the order. A fair performance scheme rewards both and shows each shift what its own record is.

Not sure what you need? Tell us about your business in six short steps and we will come to the first meeting prepared.
Share your requirementsWhy performance management and incentive design matters in rigid packaging manufacturers
Where output is the only number, operators push cycle times, trim inspection and hand over a hot machine. Where scrap is the only number, they stop the line at the first doubt. Mould changes are rarely measured at all, so the setter who does a clean one in less time earns nothing for it. Night shift has the least supervision and often the weakest records, so its numbers are quietly believed less.
Good looks like three or four measures per team: good pieces, scrap, mould change time and handover quality. Each is read from the existing shift sheet. A small team incentive is paid for steady performance across the month, not for one great day. Operators see their own sheet weekly, and the supervisor talks through the gaps, not just the totals.
How to set it up
1. Choose few measures per line
Pick good pieces, scrap or rejection, mould change time and a handover score. Four are plenty. Read them from the shift sheet you already fill, so no new paperwork is needed.
2. Set a baseline from last quarter
Use real figures from the last three months for each line and shift. Targets set from hope rather than records feel unfair and are ignored within weeks.
3. Build a team incentive, not a personal race
Pay a small amount to the whole shift crew when targets are met across the month. Keep the setter's measure separate so a clean change is rewarded directly.
4. Review weekly with the shift
Spend ten minutes each week showing the crew its sheet. Ask what blocked output. Note fixes that need maintenance or material. See HR reporting and analytics for a simple monthly page.
5. Check fairness before you pay
Compare lines and shifts for reasons outside the crew's control, such as a worn mould or late material. Adjust targets for those cases and note why.
Check these first
Before changing anything, find out what is true today. These take an afternoon and use your own records.
- Read last month's shift sheets and count shifts where scrap or rejects were not written down.
- Compare mould change time for each setter over the last month.
- List which shift has the most stoppages and the reasons recorded.
- Check whether operators have seen their own line's numbers in the last month.
GullyHR can do this with you. Read how we approach performance management and incentive design in general, or share your requirements and we will tell you where to start.
Questions owners ask
For moulding lines, per shift or crew works better, because output depends on setter, operator, material and maintenance together. Keep a separate recognition for the setter's change time.
Do not reward output alone. Include scrap or rejection and let the supervisor sample at fixed times. A shorter cycle that raises rejects should show up in the same sheet that pays the incentive.
Yes, by using the same sheet and a handover note that a day supervisor reads each morning. Count missing entries as a gap to fix, not as bad performance, until the habit settles.