Role design and job descriptions for Office Furniture Makers: who releases a drawing, who approves a sample
Late drawing changes and mock-up approvals go wrong when nobody owns them. Written roles tell the cutter, the drawing clerk and the installer who decides what.

Not sure what you need? Tell us about your business in six short steps and we will come to the first meeting prepared.
Share your requirementsWhy role design and job descriptions matters in office furniture makers
In a fit-out factory the same drawing travels from the client to the cut-list clerk, the board shop, the metal shop and the installers. When roles are loose, a revision reaches the floor by phone, two people act on different versions, and the shop cuts panels that must be remade. The operators who cut the first batch carry the blame.
Good looks like a one page role card for each key post: who releases a drawing revision and with what note, who approves a mock-up and signs it, who leads an installation team on a client floor. People know where their authority ends, and the owner is no longer the only person who can say stop.
How to set it up
1. Name the drawing release owner
Pick one person who receives every client revision, checks it and tells the floor which pieces to stop. Write down the date and the list of affected parts.
2. Write the mock-up approver's role
State who builds the sample, who checks it against the drawing, and who signs it off with the client. Record the checks used so another person can repeat them.
3. Describe the installer team leader
Cover keys, client contact, safety on site, cleaning and who calls the factory when a piece is wrong. Night teams need this written, since the owner is not there.
4. Cut each job description to one page
Each role gets purpose, tasks, decisions it may take, and who it reports to. Our role design and job descriptions work uses this shape.
5. Test the cards on a live order
Run one open order through the cards and mark where a person did not know what to do. Fix the cards, then share them with the floor.
Check these first
Before changing anything, find out what is true today. These take an afternoon and use your own records.
- Ask three people on the floor who decides when a drawing changes and compare the answers.
- Count revisions that reached the floor after cutting began in the last month.
- Check whether the person who builds the mock-up has a written list of what to check.
- Ask your night installer who he calls when a unit does not fit.
GullyHR can do this with you. Read how we approach role design and job descriptions in general, or share your requirements and we will tell you where to start.
Questions owners ask
One page is enough. List the purpose, main tasks, decisions the person can take alone, and who they report to. Long documents are not read on a shop floor, and short ones can be kept current.
Whoever can actually stop the cutting and is reachable all day. In many units that is a coordinator or a senior clerk rather than the designer, who may be on site.
Not if the cards describe authority as well as duty. Show them that the card gives a carpenter the right to refuse a drawing that is not released, which protects him from blame.