HR reporting and analytics for Landscape designers: hours by project stage
A landscape firm is paid by stage but spends its hours between stages. A small weekly report shows which project is eating time, before a handover date makes the problem a crisis.

Not sure what you need? Tell us about your business in six short steps and we will come to the first meeting prepared.
Share your requirementsWhy HR reporting and analytics matters in landscape designers
Most landscape studios know their fee schedule well and their effort badly. A concept is approved, a client adds a pergola, planting plans are redrawn twice, and the extra weeks vanish into the same fee. Senior designers feel the pressure, but nothing on paper says where it came from.
Reporting here does not need a dashboard. It needs a short sheet each Friday: who worked on which project, at which stage, how many days at the site and how many in the studio. Over a quarter, patterns appear. A certain client type is always over, a certain stage always runs late, a certain designer carries too much.
How to set it up
1. Choose the few numbers that matter
Pick hours by project stage, site days, drawings issued and revisions per drawing set. Four numbers are enough to start and easy to ask for.
2. Make the weekly entry short
Each person fills a few lines on Friday, in a shared sheet. Five minutes, no software to buy, and the studio lead reads it on Monday.
3. Read stage by stage, not only by project
Compare concept, detail and handover hours across jobs. A stage that always overruns points to a brief problem, not a slow designer.
4. Show it back to the team
Spend ten minutes in the Monday meeting on one observation. People enter honest hours when they see the sheet used to plan, not to blame.
5. Link it to review and hiring
Use the quarter's pattern in the performance management process and when deciding whether the next hire is a drafter or a horticulturist.
Check these first
Before changing anything, find out what is true today. These take an afternoon and use your own records.
- Ask whether the studio lead can name the three projects that used the most hours last month.
- See if site days and studio days are recorded for each designer.
- Check how many revisions the last concept set went through before approval.
- Look at whether the team has ever been shown the numbers they entered.
GullyHR can do this with you. Read how we approach HR reporting and analytics in general, or share your requirements and we will tell you where to start.
Questions owners ask
They can, if they are used only to find fault. Share the pattern openly, use it to plan staffing and fix briefs, and keep the entry short. People accept a sheet that helps them argue for more time.
Fix a weekly time, have the studio lead fill in the gaps from the project list, and keep the format to a few lines. A habit built over a month usually holds.
Not at the start. A shared sheet works for a studio of this kind. Keep the questions fixed for a quarter so you can compare weeks before deciding what else you need.