Skip to main content
GullyHR
Rubber Moulding Units · Performance management and incentive design

Performance management and incentive design for Rubber Moulding Units: paying for good parts and steady cure

Per press or per piece pay can push operators to overload presses and cut cure time. A fair scheme rewards good parts, steady cure and clean changes, not only speed.

A plant HR officer and production colleagues planning shift coverage at a factory briefing station

Not sure what you need? Tell us about your business in six short steps and we will come to the first meeting prepared.

Share your requirements

Why performance management and incentive design matters in rubber moulding units

When pay follows pieces, operators run several presses, shorten the cure and skip the check. The first weeks look productive, then rejects and customer complaints arrive. Fitters who clean a mould well and save time earn nothing extra. Deflashers are paid for count, so flash is left on, and the customer sorts it out. The operator who stops a press for a doubt is slower, and so poorer, than the one who ignores it.

Good looks like a small number of measures per crew: good parts, rejects, cure time kept and mould change time. Pay combines a base with a group incentive on good parts. Deflashers are paid on parts passed by the inspector. Operators who stop for a real doubt are not penalised. The crew sees its numbers each week and talks about causes.

How to set it up

  1. 1. Choose four measures

    Good parts, rejects, cure time kept, mould change time. Read them from shift sheets and the inspector's record, so no new paperwork is needed.

  2. 2. Set a baseline from the last quarter

    Use real data by press group and shift from your own records. Do not borrow targets from another unit.

  3. 3. Pay on good parts, not count

    Make the group incentive depend on parts that pass. Pay deflashers on parts passed. See performance management and incentive design for ways to structure it.

  4. 4. Protect the stop for a doubt

    Write that a press stopped for a real quality or safety doubt is not counted against the crew. The supervisor records the reason.

  5. 5. Review weekly with the crew

    Ten minutes with the sheet and the crew. Ask what slowed them. Fix material, mould and maintenance causes first.

Check these first

Before changing anything, find out what is true today. These take an afternoon and use your own records.

  • Compare reject rates between operators who run one press and those who run several.
  • Read cure time records for signs of shortened cycles.
  • Count deflashed parts returned by the customer last quarter.
  • Check how many stops for doubt were recorded and what happened.

GullyHR can do this with you. Read how we approach performance management and incentive design in general, or share your requirements and we will tell you where to start.

Questions owners ask

Do not pay for count alone. Pay on good parts, sample cure at fixed times, and show the cost of a spoiled batch. Explain why the time is set and let operators raise a doubt safely.

Let’s find your next step

Is your HR process ready to scale?

Identify payroll leaks, record gaps and hiring bottlenecks in a free first conversation, and leave knowing what to fix first.

Book a free consultation

Know what you need? Share your requirements in four short steps.

Want the full picture? See the paid HR Diagnostic.

Prefer a quick message? Chat on WhatsApp

Talk to an HR consultant

Tell us where to reach you. All fields are required unless marked optional.

10-digit Indian mobile, without +91.

Your details stay private. Privacy policy