Workplace health, safety and wellbeing for Roll Forming Units: coils, cranes and cut edges
Roll forming means heavy coils, cranes and sharp edges handled by small crews. Safety here is about who is trained to lift, how edges are handled and whether people can rest between peaks.

Not sure what you need? Tell us about your business in six short steps and we will come to the first meeting prepared.
Share your requirementsWhy workplace health, safety and wellbeing matters in roll forming units
The riskiest task in the unit, loading a coil onto the decoiler, is often given to the nearest helper. He learns crane signals by watching. Slings are used until they fray. Stackers carry long sheets with worn gloves and bad lifting habits, and bundlers cut hands on edges. In peak months, long hours make every one of these worse, and near misses go unrecorded because everybody is busy.
Good looks like a short practical course for coil handlers, with a sign-off before work alone. Crane signals are shared and clear, slings are inspected on a schedule and people stay out of the coil path. Gloves and lifting aids are checked at shift start, and stacking is rotated with other jobs. A near-miss book is kept, and supervisors read it weekly.
How to set it up
1. Make a list of who handles coils and who trained them
Write names, last practical training and who signed off. Anyone without training stops handling coils alone until the course is done. This list is the starting point for all other steps.
2. Run a practical coil handling course
Crane signals, sling checks, coil path and edge handling, taught at the line with a real coil. End with a short demonstration by each person. See workplace health, safety and wellbeing for how we would structure it.
3. Check slings, hooks and lifting aids on a schedule
Name who inspects, how often and where it is recorded. Remove worn gear at once and replace it without argument. Ask the crane operators what they see that managers miss.
4. Protect stackers and bundlers from edge injuries
Right gloves for the job, replaced when worn, lifting aids for long sheets and a rotation to other tasks. Check gloves and aids as a standard part of the start of shift.
5. Keep a near-miss book and review it weekly
A simple notebook at the line with no blame for entries. The supervisor reads it each week and picks one item to fix. Peak-month overtime should be reviewed too, since fatigue raises risk.
Check these first
Before changing anything, find out what is true today. These take an afternoon and use your own records.
- List everyone who handles coils and check each has had a practical sign-off.
- Count hand and back injuries among stackers and bundlers in the last six months.
- Look at the condition of slings, hooks and gloves on the floor today.
- Read the near-miss book, if one exists, and see when it was last used.
GullyHR can do this with you. Read how we approach workplace health, safety and wellbeing in general, or share your requirements and we will tell you where to start.
Questions owners ask
Only trained and named people, and the signals should be agreed and posted. A helper who has only watched should not signal or lift alone, however busy the line is.
Provide gloves suited to sharp metal, replace them often and rotate stacking jobs. Make the glove check part of the shift start so it is not left to the individual.
Plan temporary hands early, share overtime across the crew and check rest breaks are taken. Confirm any working hours limits with a qualified professional.