Performance management for Industrial Lighting Manufacturers: quality, burn-in results and lot delivery
Failures in lighting appear months later, so performance cannot rest on output alone. Measures that link assembly care to burn-in results and field returns let you reward the work that lasts.

Not sure what you need? Tell us about your business in six short steps and we will come to the first meeting prepared.
Share your requirementsWhy performance management matters in industrial lighting manufacturers
When assembly is judged on units per hour, sealing and soldering suffer. Burn-in finds some faults, but results go to the test team and are rarely shown to the people who made the unit. Field failures return months later with no label on who built them. Supervisors are measured on the lot date and rarely on quality, so they push through the lot and accept rework later.
Good looks like a short set of measures: units passed at first burn-in, rework per lot, on time delivery of the lot and field returns traced to a batch. Teams see these numbers weekly. Individual reviews use them as a starting point for talk, and recognition goes to the teams whose units pass and last.
How to set it up
1. Choose a few measures
Pick first pass at burn-in, rework per lot, delivery date met and returns traced to batch. Add a measure for test and design engineers, such as time to close a failure analysis.
2. Make units traceable
Label units or batches so a failure can be traced to a week, a line and a team. Without this link, the numbers cannot be used fairly.
3. Share results weekly
Show first pass and rework on a board near assembly. Spend five minutes each week asking the team what caused the main failure and what to change. Keep it practical.
4. Hold quarterly reviews
Meet each person for fifteen minutes with his numbers. Agree one goal. For supervisors, include lot delivery and quality together. A performance management routine keeps this regular.
5. Reward lasting work
Give recognition to the team with the lowest returns and rework, not only the fastest. Say what you are recognising and why, so others can copy it.
Check these first
Before changing anything, find out what is true today. These take an afternoon and use your own records.
- Count how many returned units in the last year could be traced to a batch.
- Compare first pass at burn-in across the last three lots.
- Ask two assemblers whether they ever see burn-in results from their own work.
- Check how many supervisors have goals that include quality as well as delivery.
GullyHR can do this with you. Read how we approach performance management in general, or share your requirements and we will tell you where to start.
Questions owners ask
Look at failure analysis time, design changes that reduced returns and how well they document designs. Avoid counting only the number of new products, which can hide poor quality.
Compare like with like where you can. Lots differ in product and difficulty, so look at trends within the same product and use judgement. Discuss results with the team before drawing conclusions.
Record the cause and share it with purchase. Do not blame assemblers for faults in parts. Separating causes keeps the measures fair and points the fix to the right place.