Performance management and incentive design for Kitchenware Manufacturers: piece rates with a finish check
Press, polish and weld work is counted by piece, and speed is easy to reward. The risk is a unit that pays for scratched, wrinkled or loose-handled goods and then wonders why returns rise.

Not sure what you need? Tell us about your business in six short steps and we will come to the first meeting prepared.
Share your requirementsWhy performance management and incentive design matters in kitchenware manufacturers
Where polishers are paid on count alone, they rush. Scratches and uneven shine are caught at final checking, or worse, at the distributor, and the polisher who made them was paid in full. Press operators are judged on strokes, so a worn die keeps running. Die setters have no measure at all, though their work decides how many parts are rejected.
A workable scheme counts only pieces that pass a simple finish check at the section exit and shows each polisher the passed count. Press teams get a target on good parts, not strokes. Die setters get a measure tied to rejects and idle time. During the Diwali rush, a short written note explains how the rates apply to overtime.
How to set it up
1. Define the finish check in plain words
Pick the few defects that matter: scratches, uneven shine, dents, loose handles. Hang a sample of acceptable and rejected pieces where polishers can see them.
2. Count passed pieces at the section exit
A checker marks passed and rejected pieces against each polisher's tag. Share the count with the polisher the same day and let them look at the rejects.
3. Set press targets on good parts
Replace pure stroke counts with good parts per shift for each press team. Include a short note on die wear, so operators report it instead of running through it.
4. Give die setters a measure
Track rejects and idle time per press after each die change, by setter. Use it for recognition and coaching first. See performance management.
5. Write the rules for the festival peak
Say how rates, overtime and quality checks work in the Diwali rush, and read the note to the crew before the rush starts.
Check these first
Before changing anything, find out what is true today. These take an afternoon and use your own records.
- Count rejected pieces at polishing last month by polisher.
- Ask your checker how many pieces came back from distributors in the last season and which section made them.
- List which presses stopped for die problems last month and who last set each die.
- Check whether polishers can see their own passed counts every day.
GullyHR can do this with you. Read how we approach performance management and incentive design in general, or share your requirements and we will tell you where to start.
Questions owners ask
At first perhaps, but rework and returns drop. Most polishers adapt once they see the count and know the standard.
Use rejects and idle time after changeovers, over a month, and agree the measure with the setters. Pair it with a skill grade and pay step.
A small team bonus tied to passed output can help in rush periods. Keep it simple, and avoid a scheme that rewards counts without the check.