Performance management for Suspension Component Makers: counts, quality and safe work
Press crews are paid on counts and weld cells run to takt. Performance management here has to reward good parts and safe work, not only the number of pieces made.

Not sure what you need? Tell us about your business in six short steps and we will come to the first meeting prepared.
Share your requirementsWhy performance management matters in suspension component makers
When a press crew is paid on counts, the crew pushes pieces. A weld cell is judged on output per shift. Both are easy to measure, so both end up as the whole story. Hidden costs, such as rework on a weak weld or a bent arm, show up later as someone else's problem, and the crew that shipped them has already been rewarded.
A fairer system keeps counts but adds a few other measures: good parts first time, rework caused, safe working, and attendance on the crew. Supervisors review the crew monthly with the quality lead, and individuals are discussed as well as the crew. People get clear feedback on both pace and the quality of their work.
How to set it up
1. Keep counts, add quality
For each crew add good-first-time parts and rework caused to the count, so the number reflects parts that pass. Make sure the quality figure can be traced to a crew.
2. Add safe working as a measure
Include a plain measure such as no unreported near misses or correct use of lifting aids. A supervisor can rate this from observation without extra paperwork.
3. Hold a monthly crew review
Sit with each crew for fifteen minutes with the figures. Ask what slowed them and what helped. Record two actions and review them next month.
4. Give individual feedback too
A crew result hides strong and weak members. The supervisor talks with each person once a month, using one or two examples from the shift.
5. Connect to pay with care
Link ratings to pay steps using performance management principles, and make sure the link is explained to the floor before it is used.
Check these first
Before changing anything, find out what is true today. These take an afternoon and use your own records.
- List the measures used for press crews today and see which of them relate to rework or defects.
- Count rework caused by weld cells over the last month and trace it to crews.
- Ask two crew members how they know they did a good month and compare answers.
- Check how many monthly crew reviews were actually held in the last quarter.
GullyHR can do this with you. Read how we approach performance management in general, or share your requirements and we will tell you where to start.
Questions owners ask
Not always. It motivates pace, but it needs a quality gate so rushed parts do not pass. Pair it with first-time-good measures and a rule that rework time is not paid as output.
Use observation and a few clear points: attendance, correct method, safe habits and quality of the parts they handle. A supervisor who watches and talks monthly can do this without complex tools.
Show the figures and the examples. If the data is shaky, say so and fix the measure. A disputed rating built on poor data damages trust more than no rating at all.